De Rooy predicts unplanned pickups with machine learning
De Rooy Transport, a Benelux pallet distributor, built machine learning models that predict where same-day pickup requests will come from, so its planners can ready trucks before the requests arrive.
De Rooy TransportNetherlands and BelgiumFreight and logisticsIn production
- Scenario
- Same-day pickup request prediction
- Business function
- Supply chain and logistics
- Kind of solution
- Forecasting and planning
- Who built it
- With Hubbase
- Human oversight
- Assists people
- Organization
- Enterprise, part of Netwerk Benelux
- AI types
- Machine learning
tl;drDe Rooy's model is right nine times out of ten on where same-day pickups will be needed.See the results
De Rooy Transport, a pallet distributor in the Netherlands and Belgium, uses machine learning to predict where same-day pickup requests will come from1, 2. The tool was built to show planners in the morning where trucks should stand ready1.
By March 2026, the tool was live at De Rooy, and its predictions flow directly into the transport management system (TMS)1. The first model predicts whether an unplanned pickup will be needed in a 5 by 5 kilometer area, and it’s right nine times out of ten1. A simulation put the saving at up to 1,500 kilometers per day of driving1, 2.
Before the deployment
De Rooy collects one or more pallets one day and delivers them anywhere in the Netherlands or Belgium the next2. Once planners finish the plan, several pickup requests follow in the morning, each to be delivered that same day1.
- Unplanned pickups: Over 82% of pickups weren’t in the daily plan, and they often forced last-minute changes2.
- Same-day deadlines: An unplanned pickup is a request that arrives and must be done on the same day. One that comes in late in the morning might need collection that afternoon1.
- Vehicle allocation: Because the requests come late and miss the original plan, planners found it almost impossible to match them efficiently to the right vehicle1.
Dominik Szewczyk, a data science and AI student at Breda University of Applied Sciences (BUas), found the scale of the problem while analyzing operational data1. He built the model for Netwerk Benelux, of which De Rooy is part1. He worked for De Rooy from its supplier Hubbase, during an internship in the 2024/2025 academic year1, 2.
What was built
The solution predicts where unplanned pickups will arise and adds them to the TMS, so planners can prepare routes before the requests come in1, 2. Models, the TMS and planners divide the work:
- Prediction models: Five machine learning models are trained on historical data. They predict whether a pickup will occur in an area, its exact location, its units, its size and type, and when a truck should be ready1, 2.
- Transport management system: Holds the predicted pickups. When a real request comes in, it replaces the predicted pickup from the moment it’s in the TMS1.
- Planners: Plan the routes. The system only helps with planning and predicting routes1.
- Planned orders: A predicted pickup never replaces a pickup that is already planned for an existing order1.
“I had to predict pickup occurrence, size, number of shipping units, exact location, and insertion time. Trying to handle all of this with one model felt almost impossible at one point.”
Szewczyk split the task into five separate models, each focused on one aspect, and connected them in a pipeline2.
Technology and architecture
The models learned from De Rooy’s historical operational data, and the TMS receives every predicted pickup directly1.
| Layer | What they used | Role | Source |
|---|---|---|---|
| Forecasting model | Pick-up prediction models | Five machine learning models in a pipeline predict pickup occurrence, location, units, size and timing | 1, 2 |
| Business or operational system | Transport management system (TMS) | Receives the predicted pickups and swaps each one for the real request when it arrives | 1 |
| Operations console | Prediction dashboard | Shows predictions on maps and lets planners analyze data, train and test models, and generate next-day predictions | 1 |
| Data set | Historical operational data | Trains the models on past pickups | 1 |
The prediction dashboard shows the predictions on maps, runs extra data analyses, lets planners train and test the models, and generates new next-day predictions1.
How one predicted pickup flows through the system
- The first model predicts whether an unplanned pickup will be needed within an area of 5 by 5 kilometers1.
- Further models refine the prediction to the exact pickup location, the expected number of units, the size and type of shipment, and the target time for a truck1.
- The predicted pickup goes directly into the TMS1.
- Planners prepare their routes with the predicted pickups in them1, 2.
- When the customer’s real request comes in, it replaces the predicted pickup in the TMS1.
Results
By March 2026, the predictions ran in De Rooy’s TMS1.
| Metric | Before | After | Scope and timeframe | Reported by |
|---|---|---|---|---|
| Correct area predictions | Not disclosed | nine times out of ten | Areas of 5 by 5 kilometers | Dominik Szewczyk, via TKI Dinalog, pilot1 |
| Precision of pickup location | Not disclosed | a hundred meters | Follow-on models | Dominik Szewczyk, via TKI Dinalog, pilot1 |
| Driving saved | Not disclosed | 1,500 kilometers per day | Up to, in a simulation | Dominik Szewczyk, via TKI Dinalog and BUas, estimate1, 2 |
- Area accuracy: The first model predicts whether an unplanned pickup is needed in a 5 by 5 kilometer area, and it’s right nine times out of ten1.
- Location precision: The follow-on models predicted the pickup point to within a hundred meters1.
- Driving and emissions: The saving of up to 1,500 kilometers per day comes from a simulation. The same simulation put the cut in emissions at nine hundred kilograms of CO2 per day1.
Lessons learned
Splitting the prediction into five models made the problem manageable. Szewczyk said that one model for every prediction felt almost impossible, and that the pipeline of five led to great results2.
The design absorbs wrong predictions. A predicted pickup never replaces a planned one, and it gives way to the real request1. In Szewczyk’s view, an accuracy of nine in ten is more than enough, because an error causes no operational problems1.
The planners don’t use the dashboard that was built for the tool. Its predictions go straight into the TMS instead1.
The distance and emissions savings come from a simulation of the tool1. Every figure comes from the tool’s developer, as told to the TKI Dinalog whitepaper and to BUas1, 2.
Case study scorecard
- nine times out of ten Correct area predictions1
- a hundred meters Precision of pickup location predictions1
- 1,500 kilometers per day Driving saved1, 2
Sources by publication date
- Press, academic, and regulators 2
Build this solution yourself
Analysis
What you need
- A history of pickup requests with places and times: The models learned from De Rooy’s historical operational data. They predict first for areas of 5 by 5 kilometers, then for the exact location1.
- A TMS that takes provisional pickups: The predictions reach planners through the TMS, which swaps each predicted pickup for the real request when it arrives1.
- A rule that keeps predictions from overriding orders: De Rooy’s tool never replaces a planned pickup, which is what makes an accuracy of nine in ten enough there1.
Reference architecture
Forecasting and planning
A forecasting and planning solution predicts demand, supply, load, or events from history and outside data, and turns the prediction into a plan such as orders, prices, stock positions, reserve, or crews. Each cycle, forecasting models turn fresh data into a forecast, and an optimizer can turn it into a proposed plan within set targets and limits. Planners decide and enter the plan in the operational system, or they steer an automatic plan through targets and overrides.
- Data feeds and connectors
- Data platform
- Data preparation
- Forecasting models (documented in this case study)
- Optimizer
- Approval rules
- Simulation or digital twin
- Task agents
- Planning workspace (documented in this case study)
- Operational system (documented in this case study)
- Training pipeline
- Forecasting and planning platform
A check mark shows a building block that this case study's sources document.
Open the reference architectureOthers who built it
- Siemens: AI agents draft production plans at Siemens' Erlangen plant. Siemens puts the savings from agent-based production planning at Erlangen at up to 20%.
- Walmart: Walmart plans inventory with AI forecasts and a digital twin. Walmart's 2018 ML forecasts gained ~300 bps in a backtest; one tool has saved more than $55 million.
- Albertsons Companies: Albertsons puts AI replenishment in every fresh department. Afresh's AI ordering ran in all five fresh departments of every Albertsons store by October 2025.
- AstraZeneca: AstraZeneca calibrates transit lead times with Aera's AI. AstraZeneca's AI now monitors transit lead times on about 2,000 transport lanes worldwide.
- LNER: LNER's machine learning tool flags trains at risk of delay. In the station trial, LNER's delay tool helped avoid over 450 potential delays.
- CNH: CNH sets safety stock with predictive analytics in Zedelgem. An estimated more than 50% fewer missing parts on the line, at the same safety stock value.
Cite this case study
Enterprise AI Case Studies. "De Rooy predicts unplanned pickups with machine learning." Updated Nov 27, 2026. https://case-studies.ai/case-studies/supply-chain-and-logistics/SC-057-same-day-pickup-prediction-de-rooy/
@misc{csai-sc-057,
author = {{Enterprise AI Case Studies}},
title = {{De Rooy predicts unplanned pickups with machine learning}},
year = {2026},
note = {Updated 2026-11-27},
url = {https://case-studies.ai/case-studies/supply-chain-and-logistics/SC-057-same-day-pickup-prediction-de-rooy/}
}Sources
The following reporting, and every passage quoted from it, belongs to its publisher, not to this site. Sources and ownership
- Source 1:
AI in de logistieke sector: dé kans op waardevol werk, meer efficiëntie en lagere kosten?
Supporting excerpts (18)
De Rooy: Onverwachte pick-upaanvragen voorspellen met AI
Dominik Szewczyk ontwikkelde voor Netwerk Benelux, waar De Rooy deel van uitmaakt, een machine learning model
Szewczyk volgt de opleiding Data Science & Artificial Intelligence bij BUas en was vanuit leverancier Hubbase werkzaam voor De Rooy.
Hij richtte zich op een analyse van operationele data.
Is een planning eindelijk gereed, volgen er in de ochtend niet één, maar meerdere pick-up aanvragen. Uiteraard met aflevering nog diezelfde dag.
Met onverwachte pick-up bedoel ik een verzoek dat op dezelfde dag binnenkomt en moet worden uitgevoerd. Bijvoorbeeld een verzoek dat om 11.00 binnenkomt en dat Netwerk Benelux voor 17.00 moet ophalen.
Omdat ze pas laat binnenkomen en niet in de originele planning zijn meegenomen, is het voor planners vrijwel onmogelijk om de opdrachten op een efficiënte manier aan het juiste voertuig te koppelen.
Deze tool moest planners helpen, onder andere door al in de ochtend inzicht te geven in welke gebieden trucks klaar moeten staan of toegewezen worden voor onverwachte same-day verzoeken.
koos Szewczyk voor het trainen van een Machine Learning model op basis van historische data.
Ik hield daarvoor een gebied aan van vijf bij vijf kilometer. Dat bleek al erg goed te werken. De accuratesse was negentig procent.
Hierdoor kon het systeem vier zaken voorspellen: de precieze pick-up locatie, het verwachte aantal te vervoeren eenheden, de grootte en het soort zending en zelfs de richttijd waarop een truck klaar moet staan.
Het model kon het ophaalpunt tot op honderd meter voorspellen.
Denk aan extra data analyses, planners de kans geven om de modellen te trainen en testen, data op kaarten visueel te maken en nieuwe next-day voorspellingen te genereren.
De AI-tool is inmiddels live bij De Rooy, al gebruiken de planners er het dashboard niet. De voorspellingen over de pick-ups lopen direct in het TMS.
Het is mogelijk om tot 1.500 kilometers per dag te besparen, wat zou resulteren in een reductie van de uitstoot per dag met negenhonderd kilogram CO2.
Negentig procent accuratesse is meer dan voldoende. Zeker in dit geval, omdat het systeem zo is ontwikkeld dat een voorspelde pick-up nooit een al gepland ophaalmoment voor een bestaande order vervangt.
Het systeem helpt alleen met het plannen en voorspellen van routes.
Komt er een pick-up verzoek binnen, dan vervangt het de voorspelde pick-up vanaf het moment dat deze in het TMS staat. Dus zelfs als de voorspelling niet juist is, leidt dit niet tot operationele problemen.
- Source 2:
Pick-up Prediction Model for De Rooy Transport
Supporting excerpts (9)
In academic year 2024/2025, our third-year student Dominik Szewczyk did his internship at De Rooy Transport.
Dominik worked on improving the logistics planning by predicting unexpected pickup locations. These are pickups that are not included in the daily plan and often cause last-minute changes.
He found that over 82% of pickups were unplanned, creating major inefficiencies.
he built a prediction tool that helps planners prepare better routes
the company can reduce unnecessary driving by up to 1,500 kilometers per day
I had to predict pickup occurrence, size, number of shipping units, exact location, and insertion time. Trying to handle all of this with one model felt almost impossible at one point.
Splitting the task into five separate machine learning models, each focused on one aspect, and connecting them in a pipeline led to great results.
It felt great to see my app being used in a real use case, knowing that it could really make a difference.
De Rooy Transport is a logistics company specialized in pallet distribution across the Benelux. They focus on collecting one or several pallets one day and delivering them anywhere in the Netherlands or Belgium the next