Freeport's TROI model lifts copper mill throughput at Bagdad
Freeport-McMoRan and McKinsey trained a machine learning model on years of mill sensor data to tune the Bagdad copper concentrator to each type of ore, then took it across the company's mines in the Americas.
Freeport-McMoRanUnited StatesMetals and miningScaled since 2018
- Scale
- Bagdad pilot, then North America and South America operations
- Scenario
- Mineral processing optimization
- Business function
- Manufacturing and quality
- Kind of solution
- Process optimization and control
- Who built it
- Built with a partner (McKinsey & Company)
- Human oversight
- Assists people
- Organization
- Enterprise, 10,000 to 99,999 employees
- AI types
- Machine learning, Optimization
tl;drIn one quarter with TROI's advice, Bagdad's mill put through 10% more ore than the quarter before.See the results
Freeport-McMoRan built TROI, a machine learning model that recommends settings for the copper concentrator at its Bagdad mine in Arizona, with McKinsey11. In 2018, Bagdad’s metallurgists, engineers and operators began working with McKinsey data scientists on the model, which learned from three years of mill sensor data2. The model found seven distinct ore types in the mill feed2, 3.
Freeport called the pilot a success and in January 2020 began rolling the program out across its North and South American mines1, 5. By June 2023, most of what became the Americas’ Concentrator program had been achieved, and Freeport was applying the same playbook to maintenance, capital projects and leaching11.
Once operators began following the recommendations, copper production at Bagdad rose 5% over the next several months11. In one quarter, the mill put through more than 85,000 metric tons of ore a day, 10% more than the quarter before, and copper recovery rose by 1 percentage point11, 3.
Before the deployment
As one of Freeport’s oldest and highest-cost operations, Bagdad was the place Freeport chose to try data analytics and AI, to unlock performance and improve its competitive position3. Mining there began in 1882, and its average reserve grade of 0.32% copper is one of the lowest in the industry3. McKinsey describes it as a mature mine with an enthusiastic and entrepreneurial general manager, and Freeport wanted to learn how machine learning could enhance the systems it already had11.
The concentrator was rated at 75,000 metric tons of ore a day in 2018 and produces copper and molybdenum concentrate6. The mill and the business faced the following problems:
- One recipe for all ore: Bagdad’s staff and Freeport’s central operations group believed that all the ore entering the mill was the same type. They defined a single recipe of lower and upper limits for the mill’s 42 control settings, such as the mix of ore sizes fed into the mill and the pH in the flotation cells12.
- Feed that varied: The ore fed to the mill varied in size, pH and impurities3.
- An untested capacity limit: Freeport’s analysts had projected that the mill was already at full capacity. The 2018 program set out to find out whether that was true2.
- Falling grades: Grades have trended down across the industry, so miners process more ore for the same copper. Recovery tends to be lower in lower-grade deposits3.
- Costly growth: Freeport’s mature mines generate cash when copper prices are high, but some struggle to break even at the bottom of the cycle. Growth had meant big capital projects with lengthy permitting and construction11.
A new concentrator costs about $2 billion and takes eight to ten years to bring on line11. Adding the copper Freeport was after through equipment would typically take $1.5 billion to $2 billion in crushing equipment, haul trucks and shovels2.
What was built
TROI, short for throughput, recovery, optimization and intelligence, was built as an adviser to the people who run the mill11. The work was divided as follows:
- Prediction model: Predicted how the processing plant would behave and how much copper it would recover under a given set of conditions11.
- Optimization algorithm: Worked out the settings that would produce the most copper from the type of ore in the feed11.
- Operators and metallurgists: Decided which recommendations to follow3.
A Harvard Business School student essay, drawing on McKinsey’s 2020 report, describes recommendations during every shift at Bagdad3. McKinsey’s 2023 account says every one to three hours, depending on the operation11.
The approach classifies ore by how it behaves in the mill rather than by its geology. Run through the model, the mill’s sensor data showed that, from the mill’s point of view, the mine was producing seven distinct types of ore, and the standard recipe didn’t suit all of them12, 2. Ore with more iron pyrite, for example, yields more copper when the flotation cells run at a higher pH than the recipe prescribed12.
“Thinking about ore clusters in terms of data from the mill’s instruments, rather than classifications from traditional geology, was a major mindset shift,” said Sean Buckley, the McKinsey partner who led the analytics work12. The team’s analysis suggested that tuning the controls to each of the seven types could raise copper production by 10% or more12. The model also predicted that the concentrator could produce more simply by speeding up the feed rate to the plant12.
Development
Building the model took about six months11. The team worked in the following steps:
- A small team of metallurgists, site operators and engineers developed and trained the model to recommend setting changes that would safely raise the mill’s processing rate11.
- With management’s support, the team built algorithms that related ore type, sensor readings, production rates and copper recovered3.
- The team iterated on the model with input from plant operators and metallurgists3.
- During testing, the developers, operators and metallurgists assessed each new set of recommendations together. They asked why it had been made, whether it made sense and whether it would work11.
- After enough testing, the operators ran the model and put its recommendations to work11.
For the pilot, the mine moved to an operating model built on continuous improvement and quick, low-risk tests that didn’t compromise safety11. A cross-functional mix of mine experts and a central data science group ran it11. Freeport describes the combination as data science, machine learning and integrated functional teams1. The site’s general manager, quoted in McKinsey’s report, described the habit they had to give up.
“We test every conceivable scenario, build in safeguards, and do everything we can to ensure that a process change will result in an improvement before we make it.”
That approach, he said, takes a huge amount of time, effort and capital investment, and “It took us a while to get comfortable with agile”12.
Rollout
Freeport’s annual report for 2019 called the Bagdad pilot successful and said the program was being implemented across its North and South American operations1. Its report for 2020 said many of the initiatives had been implemented and embedded across its operations7, and its report for 2021 described its innovation work as aimed at recovering more copper from leach stockpiles8.
Technology and architecture
The following table lists the components of the solution.
| Layer | What they used | Role | Source |
|---|---|---|---|
| Solution platform | Throughput & Recovery Optimization Intelligence (TROI) | Freeport’s named tool that predicts mill performance and recommends settings for the ore in the feed | 3, 4, 11 |
| Predictive model | Decision-tree ensemble | Classifies the feed into seven ore types and predicts plant performance and copper recovered | 3, 11 |
| Optimizer | Optimization algorithm | Works out the settings that would produce the most copper for the ore type | 11 |
| Data platform and storage | Integrated data warehouse | Stores operating data and second-by-second sensor readings | 4, 11, 12 |
| Sensors and telemetry | Concentrator mill sensors | Performance readings that trained the model and show the ore in the feed | 2, 3, 11 |
| Industrial and field connectivity | Wireless mesh networks | Carry sensor readings from every site to the warehouse in real time | 12 |
| Cloud platform | Cloud data architecture | Runs and scales the models across sites | 11 |
| Data preparation | Automated data pipeline | Replaced pulling data from dozens of manually updated spreadsheets | 11 |
Freeport’s January 2020 investor presentation lists the processing side of TROI as a “digital twin for processing plant” and a “machine learning algorithm”4, 5. Together they analyzed historical data, predicted results, optimized throughput and recovery, and gave quality recommendations for real-time decisions4, 5. The machine learning part was a decision-tree ensemble of thousands of trees, engineered to include a great deal of metallurgical knowledge3.
Data inputs
TROI uses the following data:
- Mill sensor history: Three years of data from thousands of sensors at the concentrating mill, which the first model analyzed2.
- Operating history: About 10 years of operating data that Freeport had compiled in its data warehouse before the Bagdad project12.
- Mine and plant records: The investor presentation shows the integrated data warehouse joining mine plan, material characteristics, shovel data, equipment availability and crusher performance4.
- Ore feed readings: Sensor data on the ore’s specifications, from which the model classifies the feed into one of the seven ore types3.
- Logged results: The results that operators log after they carry out a recommendation, from which the algorithms learn which recommendations work3.
Integrations
TROI sits on a data platform that Freeport built before the model and kept extending as it spread. Its parts connect as follows:
- Performance sensors: Freeport installed performance sensors on its trucks, shovels and stationary machines11. Its maintenance teams had lobbied for them and for more network equipment12.
- Wireless mesh networks: Freeport installed them at all its sites once they became cost effective and reliable, so second-by-second readings reach the data warehouse in real time12.
- Data warehouse: Captures and correlates second-by-second performance readings in real time. Freeport had already standardized how mine performance was measured and reported11.
How one recommendation moves through the mill
Each recommendation goes through the following steps:
- Sensors measure the specifications of the ore feed and tell the model what is coming in3.
- The model places the feed in one of the seven ore types3.
- The model predicts how the plant would respond. The optimizer picks the settings that would produce the most copper for that type11.
- The settings reach the operators and metallurgists as a recommendation, and they decide whether to follow it3.
- When they follow it, they log the result. That record teaches the algorithms which recommendations work, and the team adjusts the model3.
Scaling to other sites
Freeport launched the Americas’ Concentrator program to roll the capability out to its mines11. To make TROI work at other sites, it had to “assetize” the models, which meant refactoring and repackaging them for easy adoption at other plants11. The scaling work had the following parts:
- Modular code: The modular build let Freeport reuse 60% of TROI’s core code at each new site11.
- Centralized code base: Site-specific modules call on a centralized code base instead of re-creating the code for each module11.
- Cloud data architecture: Moving the data architecture to the cloud made it possible to run and scale the models efficiently11.
- Coordination: As agile teams multiplied, a senior product manager coordinated them, a finance director tracked and reported impact, and a quarterly planning cycle set objectives and key results11.
Results
The figures come from Bagdad, where the model went live after its testing phase11. Throughput is the tonnage of ore that the mill processes each day. Recovery is the share of the copper in that ore that ends up in concentrate, so a gain in either means more copper from the same mine.
| Metric | Before | After | Scope and timeframe | Reported by |
|---|---|---|---|---|
| Mill throughput at Bagdad | The previous quarter | 10% higher, above 85,000 metric tons of ore a day | One quarter, not named, after operators began using the recommendations | McKinsey, pilot11, 3 |
| Copper recovery at Bagdad | Not disclosed | 1 percentage point higher | Same quarter | McKinsey, pilot11, 3 |
| Copper production at Bagdad | Not disclosed | 5% higher | The several months after the recommendations were deployed | McKinsey, pilot11 |
| Accuracy of plant performance predictions | Not disclosed | 96% | Bagdad algorithms | McKinsey, pilot3 |
| Incremental copper, Americas program | Not applicable | 100 million pounds in 2021, 200 million pounds in 2022 | Estimate made in early 2020, covering mine and mill changes | Freeport-McMoRan, projected1 |
The figures need the following notes:
- Throughput and recovery: The comparison is one quarter against the quarter before, in which operations also became more stable11. The Harvard student essay gives the same 10% and 1 percentage point as the result of metallurgists adopting most of TROI’s recommendations3.
- Copper production: In July 2020, the International Copper Association put Bagdad’s production boost at 9,000 metric tonnes2.
- Capital: The gains let Freeport’s leaders cut by half the capital that they had planned to spend on a series of improvements11.
- Program target: In January 2020, Freeport targeted 200 million pounds a year of incremental copper by 2022 across the Americas4. Its chief executive, Richard Adkerson, called the 200 million pounds an aspirational goal to be reached “with very little capital investment”2.
Lessons learned
Much of the work went into what surrounds the model. TROI stood on a decade of operating data in one warehouse, and on sensors and networks that maintenance teams had pushed for long before anyone built a model12. Freeport went on to build its own analytics and agile skills and rely less on outside consultants3.
Putting metallurgists and plant operators on the development team at every site did two jobs. They judged each set of recommendations during testing, and by the time the tool was ready they trusted it enough to use it11. The testing reviews uncovered flaws in the model’s recommendations, which the developers then fixed11. Reuse across sites had a limit, because about 40% of TROI’s code had to be customized for each new site11.
Operators had to accept “black-box” models whose recommendations sometimes contradicted long-standing practice, at operations with high safety hazards3. Experienced frontline staff were used to the old ways and focused on keeping the plant running, because disruptions are costly3. Bringing in outside consultants and agile methods could have been taken as a threat by long-standing operators, and testing the model risked missing the production and cost guidance that Freeport had given investors3.
The 10% figures measure different things. McKinsey’s 2023 account measures the throughput gain in one quarter against the quarter before11, and the student essay presents the same 10% as the result of adopting most recommendations3. The 10% or more in E&MJ and the International Copper Association is the team’s estimate of what tuning to the seven ore types could do12, 2.
Freeport’s own figures don’t isolate the model’s effect. Its filings raise the concentrator’s rated capacity over the same years as the pilot6, 1, 7. Bagdad’s output was already rising before the pilot, from 173 million pounds in 2017 to 199 million in 2018, a year whose last quarter was the pilot’s first1, 5. Quarterly output fell to 48 million pounds at the end of 20195.
The Bagdad figures are McKinsey’s, from its February 2020 report and its June 2023 article, and McKinsey built the model with Freeport3, 11. The Harvard essay, E&MJ and the International Copper Association, a trade body of the copper industry, relay them3, 12, 2. Freeport’s own filings call the pilot a success and give estimates and targets1, and its April 2020 revision of its plans for COVID-19 reduced production from planned levels7.
Case study scorecard
- 10% higher mill throughput at Bagdad11, 3
- 1 percentage point higher copper recovery at Bagdad11, 3
- 5% more copper produced at Bagdad11
Sources by publication date
- Organization 5
- Vendors and partners 2
- Press, academic, and regulators 5
Build this solution yourself
Analysis
What you need
To build this solution, you need the following in place:
- Years of operating and sensor data in one warehouse: Freeport had gathered about 10 years of operating history there long before it built a model, with second-by-second sensor readings arriving over wireless mesh networks12.
- Metallurgists and operators on the development team: They judged every recommendation before the tool went live, which built the trust that got it used11.
- A feed that varies more than the recipe allows: At Bagdad, the feed varied enough that one recipe for 42 control settings left copper behind12.
- A control room that tries changes and logs them: Operators logged the result of each recommendation they followed, and that record taught the algorithms which recommendations work3.
Reference architecture
Process optimization and control
A process optimization and control solution learns from a site's operating data how a physical process responds to its settings and works out better settings as conditions change. A process model predicts how the process responds to live readings, and an optimizer picks the settings that do best within limits that operators set. An operator accepts and enters each recommendation, or the control system carries the settings out while operators watch and can take the process back.
- Sensors and meters (documented in this case study)
- Site data link (documented in this case study)
- Operating history (documented in this case study)
- Optimization platform (documented in this case study)
- Forecasting model
- Process model (documented in this case study)
- Optimizer (documented in this case study)
- Control model
- Process simulation
- Operating limits
- Operations console
- Control system
- Process equipment
- Cloud platform (documented in this case study)
A check mark shows a building block that this case study's sources document.
Open the reference architectureOthers who built it
- At Escondida in Chile, the world’s largest copper mine, BHP and Microsoft said in May 2023 that concentrator operators would adjust operating variables with real-time plant data and AI-based recommendations from Microsoft’s Azure platform9.
- Newmont’s Lihir gold plant in Papua New Guinea implemented Metso’s Geminex metallurgical digital twin in 2023 to manage ore feed variability and optimize its metallurgical processes10.
In the library
- Aramco's AI agents cut amine and steam use at a gas plant Aramco
- Cebi cuts scrap with an AI digital twin of its plants Cebi
- ArcelorMittal applies AI across its Differdange steel mill ArcelorMittal
- Deutsche Telekom AI agents handle network events in minutes Deutsche Telekom
- Meta uses machine learning to allocate ads serving compute Meta
- Schneider Electric cuts silver paste waste 73% with AI Schneider Electric
Cite this case study
Enterprise AI Case Studies. "Freeport's TROI model lifts copper mill throughput at Bagdad." Updated Nov 19, 2026. https://case-studies.ai/case-studies/production-and-quality/PQ-004-mineral-processing-optimization/
@misc{csai-pq-004,
author = {{Enterprise AI Case Studies}},
title = {{Freeport's TROI model lifts copper mill throughput at Bagdad}},
year = {2026},
note = {Updated 2026-11-19},
url = {https://case-studies.ai/case-studies/production-and-quality/PQ-004-mineral-processing-optimization/}
}Sources
The following reporting, and every passage quoted from it, belongs to its publisher, not to this site. Sources and ownership
- Source 1:
Freeport-McMoRan Inc. Form 10-K for the year ended December 31, 2019
Supporting excerpts (9)
The pilot program initiated at the Bagdad mine in northwest Arizona in late 2018 was successful in utilizing data science, machine learning and integrated functional teams to address bottlenecks, provide cost benefits and drive improved overall performance.
The program is now being implemented across the North America and South America operations.
to enhance productivity, expand margins and reduce the capital intensity of the business through the utilization of new technology applications in combination with a more interactive operating structure
Based on the opportunities identified to date, we have incorporated higher mining and milling rates in our future plans, resulting in estimated incremental production of approximately 100 million pounds of copper in 2021 and approximately 200 million pounds in 2022.
We currently estimate capital costs of these initiatives, principally for mining equipment and ongoing development of data science and machine learning programs, will approximate $200 million, most of which will be incurred in 2020.
The Bagdad operation consists of an 81,600 metric ton-per-day concentrator that produces copper and molybdenum concentrate
mined ore is crushed and treated to produce a copper concentrate with copper content of approximately 20 to 30 percent
Bagdad’s production totaled 218 million pounds of copper and 13 million pounds of molybdenum in 2019, 199 million pounds of copper and 10 million pounds of molybdenum in 2018, and 173 million pounds of copper and 9 million pounds of molybdenum in 2017.
At December 31, 2019, we employed approximately 27,500 people
- Source 2:
Freeport McMoRan Looks to the Future with Artificial Intelligence
Supporting excerpts (19)
Member Best Practices
brings together the global copper industry to develop and defend markets for copper
In 2018 metallurgists, engineers and equipment operators at Bagdad mine, in Arizona, collaborated with McKinsey data scientists to develop a model to analyze three years of data from thousands of sensors at the concentrating mill.
The program investigated whether extraction at the mill was at full capacity—as Freeport analysts had projected—or could be improved.
Previously, Bagdad staff estimated all the ore entering the mill was the same type.
Yet the sensors identified seven distinct types of ore and demonstrated the mill’s standard for controls did not match the properties of all the ore types.
The team found adjusting the mill’s controls to accommodate each of the seven ore types could help enhance copper production by at least 10 percent or more.
changes to its vast flotation tanks could extract more copper by changing the potential hydrogen (pH) level
Bagdad is now boosting its production by 9,000 metric tonnes.
Thinking about ore clusters in terms of data from the mill’s instruments, rather than classifications from traditional geology, was a major mindset shift
Sean Buckley, McKinsey Partner and Analytics Leader
Freeport has since expanded the artificial intelligence (AI) program across the Bagdad project and to its Morenci complex, also in Arizona.
The operations for the processor and concentration include the same AI to maximize ore recovery.
Freeport will deploy this technology system in Peru at its Cerro Verde mine—which is five times the size of the Bagdad operation—before scaling it up at other projects.
The application of these AI systems at mines across North and South America is forecast to increase production by 5 percent or 90,000 tonnes.
We have set an aspirational goal of adding 200 million pounds (or 90,000 tonnes) of copper from these initiatives with very little capital investment.
across the board we’re going to be using these big data analytics to help make our business better, reduce costs and improve productivity
Richard Adkerson, CEO Freeport McMoRan
Achieving such an increase in production typically would require major capital investments of $1.5 billion to $2 billion to fund purchases such as crushing equipment, new haul trucks and large shovels.
- Source 3:
Freeport pioneers data analytics in the mining industry to drive operational performance
Supporting excerpts (30)
The DI manages this forum to highlight perspectives from the HBS student community.
FCX’s Bagdad copper operation in Arizona was first mined in 1882.
Its current average reserve copper grade is 0.32%
one of the lowest in the industry
As one of its oldest and highest cost operations, Bagdad was selected by FCX to implement data analytics and AI to unlock performance and improve its competitive position.
It did so in 2018-19 in partnership with McKinsey
leveraging the extensive historical operating data available for the complex
the industry has consistently seen a downward trend in grades
more tonnes of ore are mined and processed to obtain the same tonnes of contained copper
recovery rates tend to be lower for lower grade deposits
The operators had historically run the mill as if all ore tonnes fed were homogenous, when its characteristics varied in terms of size, PH and impurities levels, etc.
consisted of an ensemble of thousands of decision trees that had been engineered to include a great deal of metallurgical knowledge
The model classified ore feed into 7 different types based on data collected from sensors measuring the ore’s different specifications.
With FCX management’s support, the team proceeded to develop algorithms that differentiated relationships between ore type, readings from the sensors, production rates, and copper recovered
the team proceeded to develop algorithms that differentiated relationships between ore type, readings from the sensors, production rates, and copper recovered
The algorithms predicted plant performance based on these factors with an accuracy of 96%
The team iterated and optimized the model (named TROI) with input from plant operators and metallurgists.
TROI produced recommendations during every shift to adjust mill settings to maximize output depending on the ore type.
Equipment operators and metallurgists ultimately decided which recommendations to follow.
As operators implemented TROI’s recommendations and logged their results, the ML algorithms learned which recommendations yielded improved performance and which ones didn’t and the team adjusted the model accordingly.
Ultimately, metallurgists adopted the majority of TROI’s recommendations, which resulted in a 10% increase in throughput and 1ppt increase in recoveries.
McKinsey “Inside a mining company’s AI transformation” report February 2020
Built a central data-science group and a company-wide data warehouse that logged operating information in a standardized manner.
Installed sensors to collect data from equipment and processing facilities across operations.
Change in culture at operations, where experienced frontline operators were accustomed to old ways of doing things and focused on maintaining operational continuity given significant losses in case of operational disruptions.
Implement new technology and processes at operations that have high safety hazards without compromising operator’s health & safety.
Get buy-in from plant operators to utilize “black-box” models to adjust mill settings based on recommendations that sometimes contradicted long-standing practices.
Bring outside consultants to supplement data-analytics capabilities and introduce agile working methods, which could have been taken as threatening to long-standing operators.
Risk missing production and cost guidance provided to investors when testing ML model.
The FCX team has since bolstered its data-analytics and agile working capabilities and reduced their reliance on external consultants.
- Source 4:
4th Quarter 2019 Earnings Conference Call
Supporting excerpts (17)
Targeting 200 mm lbs per annum Incremental Copper by 2022
Combining Data Analytics with Agile Way of Working
Aggregate Data from Multiple Systems; Use Data Science Algorithms to Predict Most Efficient Setups
Send Commands to Dispatch to Adjust Mining Equipment and Resource Execution
Integrated Data Warehouse Mine Plan Material Characteristics Shovel Data Equipment Availability Crusher Performance
More Interactive Organizational Structure
Digital Twin for Processing Plant
Machine Learning Algorithm
Analyze Historical Data and Predict Results/Optimize Throughput & Recovery
Quality Recommendations
Real Time Data Driven Decisions
Throughput & Recovery Optimization Intelligence (TROI)
Central Data Collection
Advanced Analytics in Americas ($0.15 bn in 2020e)
Consolidated Capital Expenditures
Major projects include CAPEX associated with Grasberg underground development
e= estimate. See Cautionary Statement.
- Source 5:
Freeport to invest in data science, AI programs at North/South America mines
Supporting excerpts (9)
According to a report in the Financial Times, the system at Bagdad found that the mine was producing seven distinct types of ore and that the processing method, which involves flotation, could be adjusted to recover more copper by adjusting the PH level.
confirmed at the back end of 2019 that the Bagdad trial was carried out with management consulting firm McKinsey
On the processing/concentration side, it was using a digital twin for processing plant, in tandem with a machine-learning algorithm.
These used historical data to predict results and optimise throughput and recovery.
Data is being aggregated from multiple systems to help inform the data-science algorithms to predict the most efficient setups.
In the March quarter of 2018, the mine produced 49 MIb of copper, with 48 MIb coming out in the June quarter of that year.
It dropped to 45 MIb in the September quarter before stepping up to 57 MIb in the last quarter of that year (when the trial commenced).
In the March quarter of 2019, output dipped slightly to 55 MIb, before heading back to 57 MIb in the June quarter and surpassing that (58 MIb) in the September quarter.
Output fell back to 48 MIb in the most recent December quarter.
- Source 6:
Freeport-McMoRan Inc. Form 10-K for the year ended December 31, 2018
Supporting excerpts (1)
The Bagdad operation consists of a 75,000 metric ton-per-day concentrator that produces copper and molybdenum concentrate
- Source 7:
Freeport-McMoRan Inc. Form 10-K for the year ended December 31, 2020
Supporting excerpts (4)
We were successful in implementing and embedding many of these initiatives across our operations by utilizing data science, machine learning and integrated cross-functional agile teams to identify opportunities and drive improved overall performance.
The Bagdad operation consists of an 83,500 metric ton-per-day concentrator
In April 2020, we announced revised operating plans in response to the global COVID-19 pandemic and resulting negative impact on the global economy.
which resulted in reductions in (i) operating costs, (ii) capital expenditures, (iii) exploration and administrative costs, and (iv) sales volumes and production from those planned.
- Source 8:
Freeport-McMoRan Inc. Form 10-K for the year ended December 31, 2021
Supporting excerpts (2)
These initiatives are expected to allow us to recover additional copper from our large existing leach stockpiles.
There are several projects ongoing across our North America and South America operations, which incorporate new applications, technologies and data analytics.
- Source 9:
BHP-Microsoft AI collab on copper recovery
Supporting excerpts (2)
BHP (ASX: BHP) and Microsoft are collaborating on the use of artificial intelligence (AI) to improve copper recovery and optimise concentrator performance at the Escondida operation in Chile, the world’s largest copper mine.
Using real-time plant data in combination with AI-based recommendations from Microsoft’s Azure platform, Escondida concentrator operators will have the ability to adjust operational variables that affect ore processing and grade recovery.
- Source 10:
Optimizing from mine to mill to mine with digital twin technology at Newmont Lihir gold mine
Supporting excerpts (3)
In 2023, the Newmont Lihir gold plant in Papua New Guinea advanced its operations by implementing a metallurgical digital twin, Metso’s Geminex
aimed at optimizing material flows, managing ore feed variability, and maximizing metallurgical processes
Although the technical deployment of the digital twin has been completed, full operational commissioning is still in progress due to recent personnel changes at the plant.
- Source 11:
Freeport-McMoRan turns data into value
Supporting excerpts (43)
The company’s expectations for growth required significant capital and lengthy permitting and construction efforts.
in a high-price environment, the mines generate significant cash, but at the bottom of the price cycle, some mines struggle to break even
Over a five-year AI journey, the company successfully designed and executed what it called the “Americas’ Concentrator” program, aiming to unlock the equivalent of an entire new processing facility’s worth of incremental annual copper production through the use of big data, AI, and agile working methods.
The chief information and innovation officer had the foresight to establish a common data infrastructure and architecture to support all processing operations, as well as to enable swift deployment of AI tools across sites with modest tailoring.
This allowed much of the site-level focus to be on agile practices, training, capability building, and change management.
To get started, Freeport selected a mature mine, with an enthusiastic and entrepreneurial general manager, as its test case for the AI transformation program.
the company sought to learn how machine learning (ML)/AI could enhance its existing systems
Over the course of about six months, a small team of metallurgists, site operators, and engineers worked to develop and train an AI model to recommend changes in settings to safely increase the mill processing rate.
After sufficient testing and development, the operators ran the model and deployed the AI-generated recommendations.
During the next several months, copper production increased by 5 percent.
In one quarter, the Bagdad site’s throughput exceeded 85,000 metric tons of ore per day—10 percent more than the previous quarter—while its copper recovery rate rose by one percentage point and its operations became more stable.
The gains allowed Freeport’s leaders to cut by half the capital that they had planned to spend on a series of improvements.
could unlock a systemwide production increase of 125,000 metric tons per day, which could yield 200 million pounds of copper per year, representing $350 million to $500 million in EBITDA.
Based on a $4 per pound copper price and unit costs of below $2 per pound.
but without spending $2 billion or waiting the eight to ten years that such major capital projects typically require
Freeport launched the Americas’ Concentrator program to roll out the AI capability to its mines
it had previously standardized data on mine performance measurement and reporting
It had enriched the data by installing additional network equipment and performance sensors on the company’s trucks, shovels, and stationary machines.
The company also built a central data warehouse to store the data, allowing it to capture and correlate second-by-second performance readings in real time.
A culture of planning and development built around a set of safeguards had served the company well, but it had its drawbacks, chiefly with pace.
the mine shifted to an operating model that emphasized agility, continuous improvement, and quick, low-risk tests without compromising safety
assembling a cross-functional mix of experts from the mine and a central data science group that could evaluate and execute on change initiatives
Company leaders made the crucial decision to add metallurgists and plant operators to the development team at every site.
When each new set of recommendations came out during the testing phase, the AI developers, operators, and metallurgists on the team would assess the recommendations: Why were they made? Did they make sense? Would they work?
In this way, the teams uncovered flaws that the AI developers then quickly fixed, which in turn helped the agile team learn more quickly.
The team trained the AI tool and, in doing so, increased the metallurgists’ and operators’ trust in it.
By the time the new tool was fully ready, they were much more willing to use it.
The initial team had developed an ML model that they called “TROI” (throughput, recovery, optimization, and intelligence).
This product helped predict how the processing plant would behave and how much copper could be recovered under any set of conditions.
The optimization algorithm evolved settings that would produce the most copper given a particular type of ore and issued recommendations every one to three hours, depending on the operation.
To make TROI work at other sites, however, Freeport had to “assetize” the models.
That essentially meant refactoring and repackaging them for easy adoption at other plants.
The modular way that the tool was built allowed 60 percent of its core code to be reused easily, while the remaining 40 percent would be customized for the new site.
the company invested in developing a centralized code base that site-specific modules could call on rather than having to re-create the necessary code for each specific module
Running and scaling these models efficiently was possible because Freeport had migrated its data architecture to the cloud.
automating many processes, such as developing the data pipeline, which had previously been a laborious process of pulling data from dozens of manually updated spreadsheets
Freeport solved this issue by putting a senior product manager in charge to help coordinate teams and improve allocations.
It assigned a finance director to manage impact tracking and reporting
it instituted a quarterly planning system (similar to quarterly business reviews) in which top leaders from the company came together to set objectives and key results and to focus resources on high-priority areas
With a kitchen-tested transformation recipe in hand and most of the Americas’ Concentrator program vision achieved
In multiple domains, including capital-project execution, maintenance, and leaching operations, the company is now using new iterations of the playbook that made the Americas’ Concentrator program a success.
Sean Buckley is a partner in McKinsey’s Dallas office
The company was able to further take advantage of the cloud by automating many processes
- Source 12:
Agile Approach to Process Optimization Pays Off for Copper Producer
Supporting excerpts (26)
October 2020 | Processing Solutions
A case study provided earlier this year by McKinsey* illustrates how Freeport-McMoRan adopted “agile principles” to its quest to get more production out of its Bagdad, Arizona, concentrator
An Artificial Intelligence (AI) model built from years of operating data and agile-principle efforts predicted that the mine could increase production from its concentrator simply by speeding up the feed rate to the plant.
The mill’s improvement relied heavily on information from a “data warehouse” that the company had been compiling for about 10 years prior to the Bagdad project.
maintenance teams lobbied for the installation of additional network equipment and performance sensors
When wireless mesh networks became cost effective and reliable, Freeport-McMoRan installed them at all its sites.
Now the company can capture and correlate second-by-second performance readings in the data warehouse, all in real time.
staff at Bagdad and Freeport-McMoRan’s central operations group originally believed all the ore entering the mill was of the same type
Consequently, they had defined a single “recipe” of lower and upper parameters for the mill’s 42 control settings: the mix of differently sized ore chunks being fed into the mill, the pH level in the flotation cells, etc.
the mine was actually producing seven distinct types of ore — and the mill’s standard recipe for control settings didn’t match the properties of all those ore types
Ore containing more iron pyrite, for example, would yield more copper if the pH level in the flotation cells were set higher than the recipe prescribed.
Thinking about ore clusters in terms of data from the mill’s instruments, rather than classifications from traditional geology, was a major mindset shift
said Sean Buckley, a McKinsey partner who led the analytics work
The team’s analysis suggested that adjusting the mill’s controls to suit each of the seven ore types could increase copper production by 10% or more.
The McKinsey report quoted Justin Cross, the Bagdad site’s general manager.
Usually when we run operational projects, we over-engineer them
We test every conceivable scenario, build in safeguards, and do everything we can to ensure that a process change will result in an improvement before we make it.
But it takes a huge amount of time, effort, and capital investment.
It took us a while to get comfortable with agile
Harry M. “Red” Conger, former president and COO, Americas, at Freeport-McMoRan
Don’t wait for the “perfect” product or solution to begin using it.
Immediate action brings immediate results
Empower frontline teams to take risks.
Set clear boundaries on what teams can try.
Make it clear they won’t be blamed if their experiments come up short or incur extra costs.
Human judgment and intuition are hard to replace, but people can make better decisions when they’re informed by analytical findings.