    BHP's computer vision spots oversized rocks before crushers

    BHP put cameras and machine learning models along the conveyors of its Western Australia Iron Ore operations to catch oversized rocks and foreign objects before they stop crushers and ports.

    BHPAustralia (Western Australia Iron Ore (WAIO) operations)Metals and miningScaled since 2025
    Scale
    Multiple sites at Western Australia Iron Ore
    Scenario
    Oversize rock and foreign object detection on conveyors
    Business function
    Energy and asset operations
    Human oversight
    Acts under watch
    Organization
    Enterprise
    AI types
    Machine learning, Computer vision

    Sources and their publishers

    This case study draws on reporting by the following publishers. Enterprise AI Case Studies combined these accounts and added its own explanation. The reporting, and every passage quoted from it, belongs to whoever published or supplied it.

    1. iTnews

    2. Hellenic Shipping News

    3. Business Council of Australia

    tl;drCrusher downtime fell 20% after BHP's oversize detection went live in 2025.See the results

    View the solutionBuild this solution yourself

    BHP uses computer vision to detect oversized rocks and foreign objects on the conveyors of its Western Australia Iron Ore (WAIO) operations. When the system spots one, the conveyor stops and site teams remove the material1.

    The system, Oversize and Foreign Object Detection (OFOD), uses cameras and machine learning models wired into the process control system2, 3. BHP implemented it in 2025 and has since had no issues caused by oversized or foreign objects2.

    By May 2026, OFOD had brought a 20% reduction in crusher downtime and a reduction of up to 60% in related disruptions. BHP put the uplift potential at a little under 1 million metric tons of iron ore a year, worth almost $50 million2. In October 2026, digital officer Mikko Tepponen described OFOD as one of the projects that BHP is now scaling across its operations1.

    Before the deployment

    Oversized rocks and foreign objects entering the processing system were a persistent problem at WAIO2. Before OFOD, people on site had to spot the oversized rocks1.

    • Crusher downtime: BHP lost about 1,000 hours of crusher downtime over three years, along with disruptions at its West Australian ports2. The Business Council of Australia’s account puts the loss at around 1,100 hours of crusher downtime each year3.
    • Manual intervention: The problem increased reliance on higher-risk manual intervention to clear the material3.

    What was built

    OFOD watches the ore during loading and along the conveyors before the crushers and port systems, so that problem material is caught early3. Models, the control system and people divide the work:

    • Machine learning models: Compare the camera images with examples and flag oversized rocks and foreign objects in real time1, 2.
    • Process control system: Receives each detection and stops the conveyor belt automatically1, 2.
    • Controllers and site teams: Controllers coordinate with site teams, who remove the material safely1.

    The automatic stop shifts risk management from manual controls to engineered controls built into the system3. BHP co-designed OFOD with frontline staff from the start, integrated it into existing systems and designed it to scale from the outset2.

    “That gap will not close with more pilots. It closes when we design for that scale from the start and connect those solutions into real, practical challenges faced by our operations,”

    Mikko Tepponen, digital officer at BHP2

    Rollout

    • 2025: OFOD went live at WAIO2.
    • By May 2026: BHP had applied it from one site to multiple sites and used it as the base for other computer vision use cases2.

    Technology and architecture

    Figure 1How BHP's oversize detection stops a conveyor
    How BHP's oversize detection stops a conveyorCameras on diggers and above conveyor belts send images over a high-speed network to machine learning models. The models pass each detection to the process control system, which stops the conveyor belt. The control system alerting the controllers is inferred. Controllers coordinate with site teams, who remove the material.images (data) · Documented in source [1]images (data) · Documented in source [1]detection (data) · Documented in source [2]stop (trigger or control) · Documented in source [1]stop alert (data) · Inferred, not documented in the sourcesremove material (handoff to people) · Documented in source [1]MINE AND CONVEYORSCOMPUTER VISIONOPERATIONSCameras on diggers and belts · Device · Documented in source [1]DEVICECamerason diggersand beltsHigh-speed network · System · Documented in source [1]SYSTEMHigh-speednetworkMachine learning models · AI model · Documented in sources [1] [2]AI MODELMachinelearningmodelsProcess control system · System · Documented in source [2]SYSTEMProcesscontrol systemConveyor belt · Device · Documented in source [1]DEVICEConveyor beltControllers · Team · Documented in source [1]TEAMControllersSite teams · Team · Documented in source [1]TEAMSite teamsimagesimagesdetectionstopstop alertremovematerialHow BHP's oversize detection stops a conveyorCameras on diggers and above conveyor belts send images over a high-speed network to machine learning models. The models pass each detection to the process control system, which stops the conveyor belt. The control system alerting the controllers is inferred. Controllers coordinate with site teams, who remove the material.images (data) · Documented in source [1]images (data) · Documented in source [1]detection (data) · Documented in source [2]stop (trigger or control) · Documented in source [1]stop alert (data) · Inferred, not documented in the sourcesremove material (handoff to people) · Documented in source [1]MINE AND CONVEYORSCOMPUTER VISIONOPERATIONSCameras on diggers and belts · Device · Documented in source [1]DEVICECameras ondiggers and beltsHigh-speed network · System · Documented in source [1]SYSTEMHigh-speed networkMachine learning models · AI model · Documented in sources [1] [2]AI MODELMachinelearning modelsProcess control system · System · Documented in source [2]SYSTEMProcess control systemConveyor belt · Device · Documented in source [1]DEVICEConveyor beltControllers · Team · Documented in source [1]TEAMControllersSite teams · Team · Documented in source [1]TEAMSite teamsimagesimagesdetectionstopstop alertremove material
    • AI component
    • Data
    • Trigger or control
    • Handoff to people
    • Inferred, not documented
    Sources [1][2]
    Machine learning models flag oversized rocks in camera images, and the process control system stops the belt for site teams.

    The cameras sit on diggers and above the conveyor belts and capture images constantly1. A high-speed network carries the images to the computer vision system, where the models look for anything unusual1.

    Layer What they used Role Source
    Vision model Machine learning models Compare camera images with examples and detect oversized rocks and foreign objects in real time 1, 2
    Cameras and imaging Cameras on diggers and conveyors Capture images of the ore during loading and above the conveyor belts 1, 3
    Industrial and field connectivity High-speed network Carries the camera images to the computer vision system 1
    Control system Process control system Receives each detection and stops the conveyor belt automatically 1, 2

    Data inputs

    • Camera images: A constant stream of images from the diggers and the conveyors, one case input for each detection1, 3.
    • Example images: The examples that the computer vision compares each new image with1.

    The detection is integrated directly into the process control system, which turns a detection into a belt stop without a person in between1, 2. The control system most likely also alerts the controllers who coordinate the removal.

    Results

    Metric Before After Scope and timeframe Reported by
    Reduction in crusher downtime About 1,000 hours lost over three years 20% WAIO crushers, 2025 to May 2026 BHP, via Platts, measured2
    Iron ore uplift potential a year Not disclosed a little under 1 million metric tons WAIO, a year BHP, via Platts, estimate2
    Value of the uplift Not disclosed almost $50 million WAIO, a year BHP, via Platts, estimate2
    • Crusher downtime: The 20% reduction is measured against the downtime that oversized rocks and foreign objects caused before the 2025 rollout2.
    • Related disruptions: The reduction of up to 60% covers the disruptions linked to the same material, including those at the ports2.
    • Ore and value: The tonnage is an uplift potential per year, and the dollar figure is the value of that potential2.

    The Business Council of Australia’s account gives the WAIO figures as targets. They are a 20% reduction in crusher downtime and a 60% reduction in port downtime3. At scale, the targets add about 0.8 million tonnes a year of throughput, worth about US$46 million3.

    In October 2026, Tepponen wrote that the monitoring systems had reduced crusher events and equipment downtime, improved ore throughput and lowered maintenance requirements1.

    Lessons learned

    The system grew beyond its first site. BHP applied it to multiple sites and reused it for other computer vision use cases2.

    Tepponen credits the delivery more than the technology. He puts its effect down to co-design with the front line, integration into existing systems and a design for scale from the outset2.

    The figures are BHP’s own, given by Tepponen at the Global Resources Innovation Expo in Perth in May 2026 and relayed by Platts2.

    BHP’s two accounts don’t match. Platts reports about 1,000 hours of crusher downtime over three years, and the Business Council of Australia around 1,100 hours each year2, 3. Platts states the 20% and 60% as delivered, and the Business Council of Australia as targets, with the 60% applied to port downtime2, 3.

    The tonnage and value figures are estimates of potential rather than counted output. The two accounts also put them differently, at a little under 1 million metric tons and almost $50 million against about 0.8 million tonnes and about US$46 million2, 3.

    The AI doesn’t clear the belt. When the conveyor stops, controllers coordinate with site teams, who still have to remove the oversized rock or object1.

    Case study scorecard

    Build this solution yourself

    Analysis

    What you need

    • Cameras where the material enters: You need camera coverage on the loading equipment and above the conveyors before the crushers, because OFOD catches material there before it does damage1, 3.
    • A control system that takes a stop signal: The detection prevents downtime because the process control system stops the belt on its own, so check that yours can accept that signal2.
    • Site teams ready to clear a stopped belt: Each stop still ends with people removing the material, and BHP designed the system with those frontline teams from the start1, 2.

    Reference architecture

    Visual inspection and monitoring

    A visual inspection and monitoring solution uses a vision model to read images from cameras and find or measure defects, objects, events, or conditions that people or systems then act on. The vision model reads each image, and rules send each detection to a line controller, a business system, or a person. People confirm or correct the findings and tune the process from the measurements, and their verdicts and newly labeled images keep the model current.

    A check mark shows a building block that this case study's sources document.

    Open the reference architecture

    Others who built it

    Cite this case study

    Enterprise AI Case Studies. "BHP's computer vision spots oversized rocks before crushers." Updated Nov 26, 2026. https://case-studies.ai/case-studies/operational-technology/OT-062-oversize-rock-detection-bhp/

    @misc{csai-ot-062,
      author = {{Enterprise AI Case Studies}},
      title = {{BHP's computer vision spots oversized rocks before crushers}},
      year = {2026},
      note = {Updated 2026-11-26},
      url = {https://case-studies.ai/case-studies/operational-technology/OT-062-oversize-rock-detection-bhp/}
    }

    Sources

    The following reporting, and every passage quoted from it, belongs to its publisher, not to this site. Sources and ownership

    1. Source 1:

      BHP eyes momentum as it scales digital systems across supply chain

      IndependentiTnews, Oct 30, 202630 Oct 2026By Ry CrozierAccessed Nov 26, 202626 Nov 2026

      Supporting excerpts (8)
      • BHP is deploying computer vision and AI to automatically detect oversized rocks on conveyor belts at its Western Australian Iron Ore operations.
      • outlined the two projects and their collective contribution to productivity
      • We are scaling these initiatives across our global operations to capture more value.
      • Prior to the detection system, it was down to people onsite to spot the oversized rocks.
      • Cameras sit on diggers and above conveyor belts, constantly capturing images. These images are sent through a high-speed network to computer vision where AI compares them to thousand examples to spot anything unusual,
      • data scientist Joshua Thorp said in an accompanying video.
      • when an oversized rock is detected, the conveyor belt stops automatically, and controllers coordinate with site teams to safely remove the material.
      • a reduction in crusher events, improved ore throughput, reduced equipment downtime and lower maintenance requirements since these monitoring systems have been introduced, driving value to our bottom-line.
    2. Source 2:

      BHP Group unlocks 1 mil mt/y of extra iron ore in Western Australia with AI

      IndependentHellenic Shipping News, May 8, 20268 May 2026Accessed Nov 26, 202626 Nov 2026

      Supporting excerpts (13)
      • Digital Officer Mikko Tepponen said at the Global Resources Innovation Expo in Perth on May 6.
      • had lost about 1,000 hours of crusher downtime, along with additional disruptions at its West Australian ports, over three years before an AI-driven solution implemented in 2025 fixed the problem
      • One of the persistent challenges in our iron ore operations here in Western Australia is the presence of oversized rocks and foreign objects entering the processing system,
      • a computer vision solution that uses cameras and machine learning models to actually detect those anomalies in real time, integrated directly into the process control system,
      • That one solution is actually delivering to us a little bit under 1 million
      • tons per annum of uplift potential, which translates then to almost $50 million in value, a 20% reduction in the crusher downtime and up to a 60% reduction in related disruptions,
      • After the technology was implemented in 2025, there have since been no issues caused by oversized or foreign objects
      • co-designed with the front line
      • from the get-go, integrated into the existing systems, delivered with pace and agility and quickness and designed to scale from the outset,
      • This was then applied from one site to multiple sites and then to other use cases using computer vision,
      • focusing on building capability, not just a pilot
      • That gap will not close with more pilots. It closes when we design for that scale from the start and connect those solutions into real, practical challenges faced by our operations,
      • Tepponen told Platts, part of S&P Global Energy, on the sidelines of the expo.
    3. Source 3:

      BHP: Oversize and foreign object detection with AI

      OrganizationBusiness Council of Australia, Jun 1, 20261 Jun 2026Accessed Nov 26, 202626 Nov 2026

      Supporting excerpts (5)
      • Oversize and Foreign Object Detection (OFOD), a computer vision and machine learning solution
      • contributing to around 1,100 hours of crusher downtime each year and increasing reliance on higher
      • computer vision and machine learning during loading and along conveyors before crushers and port systems, to identify problematic material early.
      • shifting risk management from manual controls to engineered controls embedded in the system.
      • the solution is targeting a 20 per cent reduction in crusher downtime and a 60 per cent reduction in port downtime, delivering approximately 0.8 million tonnes per annum of additional throughput and around US$46 million in value at scale.