Choose your region

    Lists show the case studies of your region first. Browse and search still hold every case study.

    Europe
    North America

    AI solar nowcasting cuts forecast errors at Britain's NESO

    Great Britain's grid operator NESO and the non-profit Open Climate Fix built Quartz Solar, a machine learning forecast that reads satellite images of clouds to predict solar output the control room can't see.

    National Energy System OperatorUnited KingdomElectric powerIn production since Dec 2022
    Scale
    National forecast and about 300 grid supply points
    Scenario
    Solar generation forecasting for grid balancing
    Business function
    Energy and asset operations
    Kind of solution
    Forecasting and planning
    Who built it
    Built with a partner (Open Climate Fix)
    Where it runs
    Public cloud
    Human oversight
    Assists people
    Organization
    Public sector
    AI types
    Machine learning, Computer vision
    Users
    8
    Sites
    approximately 300
    Project cost
    £500,000

    Sources and their publishers

    This case study draws on reporting by the following publishers. Enterprise AI Case Studies combined these accounts and added its own explanation. The reporting, and every passage quoted from it, belongs to whoever published or supplied it.

    1. National Energy System Operator

    2. Open Climate Fix

    3. pv magazine

    4. Transport & Energy

    5. Google DeepMind

    6. NVIDIA

    tl;drNESO's control room uses Quartz Solar's AI forecast and estimates it saves about £30 million a year.See the results

    View the solutionBuild this solution yourself

    Great Britain’s National Energy System Operator (NESO) runs Quartz Solar, a machine learning solar forecast, in its national control room4, 10. NESO built it with the non-profit Open Climate Fix to predict the output of the country’s solar panels up to 36 hours ahead4, 10.

    The forecast reads satellite images of clouds, weather forecasts, and live generation data4, 10. The work began as an innovation project in September 2021, and the first fully operational version reached the control room in December 20221, 9. In November 2025, Open Climate Fix announced that Quartz Solar was fully integrated into NESO’s operations, from day-ahead scheduling to real-time control4.

    By the end of the project’s third work package, Quartz’s errors were 38% and 39% lower than those of the two solar forecasts NESO used1. The share of days with a 1 GW miss fell from 23% to 5%1. In December 2025, NESO put the savings since integration at about £30 million a year10.

    Before the deployment

    NESO, then called National Grid ESO, balances Britain’s electricity system second by second3. Solar was the part of the supply it could see least. Most panels connect to regional distribution networks rather than to the transmission network that NESO runs9, 3.

    The old setup had the following problems:

    • Hidden generation: Embedded solar was invisible to the grid operator, and the location of many panels was itself uncertain9, 3. By the end of 2023, the UK had 20 gigawatts of solar installed, 4.2 GW of it on homes6.
    • Slow weather forecasts: NESO’s weather-based methods updated roughly every six hours5. Forecasts built on numerical weather prediction tend to miss rapid shifts in cloud cover4. The control room couldn’t anticipate short-term swings in solar output caused by cloud3.
    • Hard seasons: The hardest stretches were the shoulder months of April and May and of September and October, when the weather is least predictable9.
    • Forecast error: In 2021, the national solar forecast had a mean absolute error of 650 MW1. Mean absolute error is the average size of a miss in either direction. Earlier machine learning work in the control room had already improved solar forecast accuracy by 33%3.
    • Reserve: The ESO kept reserve power ready, often flexible gas plants, to cover a shortfall caused by cloud or a change in the weather3, 9.

    “The physics-based forecasting models are powerful for predicting weather on the scale of days and weeks, but take hours to produce — making them ill-suited for predictions at the hour or minute level”

    Dan Travers, co-founder at Open Climate Fix11

    Carolina Tortora, then head of innovation strategy and digital transformation at National Grid ESO, linked forecasts to reserve when the project was announced on August 19, 2021. The more confidence the operator had in its forecasts, “the less we’ll have to cover for uncertainty by keeping traditional, more controllable fossil fuel plants ticking over”3.

    The innovation team framed the project as a test of whether better solar predictions would let it hold less “spinning reserve”2. Less reserve would cut emissions and costs to end users and let the grid take more solar2. The ESO also aimed to be able to run a zero carbon electricity system by 20253.

    It chose Open Climate Fix, a non-profit start-up co-founded by former DeepMind researcher Jack Kelly3. The plan was to train a model that reads satellite images and works out how clouds move over the solar arrays below3.

    What was built

    Quartz Solar produces the forecast, and NESO’s control room engineers decide what to do with it1, 10. The service gives a national forecast up to 36 hours ahead and a regional breakdown for about 300 grid supply points1, 5. A grid supply point is a substation where the transmission network feeds a regional network. Each forecast gives a most likely value and 10th and 90th percentile predictions, so engineers see a range5.

    The work is divided as follows:

    • PVNet: A neural network that reads satellite images and weather forecasts to forecast each grid supply point. It runs alone for the first six hours1.
    • National model: A model built on XGBoost, a gradient-boosted decision tree method, that predicts total solar output directly. The service blends it with PVNet from six to eight hours ahead, and runs it alone beyond eight hours1.
    • Quartz software: Services collect weather, satellite, and generation data, an API serves the results, and a web interface presents them1.
    • Control room engineers: Consulted the forecasts daily on one of the large control room screens1. NESO uses the forecasts to decide how much energy to hold in reserve10.
    • Outside users: Open Climate Fix delivered the forecast open and documented, and anyone can access the API. By January 2026, eight energy traders and smart home operators used the Quartz forecast1.

    The national model answers a problem that the team found in 2022. The team had expected the errors of the regional forecasts to cancel out when summed, and they didn’t8. The model tended to over- or under-predict in particular weather regimes, and a weather regime spans many regions at once, so the small misses pointed the same way8. PV Live, whose estimates the models learn from, also gives a national estimate that doesn’t equal the sum of its regional ones1.

    Alternatives considered

    In the second work package, from January to June 2022, Open Climate Fix developed two models side by side1, 8:

    • PVNet: The relatively low-risk option, an evolution of the convolutional network from the first phase1. The team decided to put it into production first8.
    • Power Perceiver: The high-ambition, more experimental option, built from scratch with transformer components1, 8. It scored better at the end of that phase, and the plan was to put it into production early in the next one8.

    The models produced probabilistic forecasts from the start. The first interface deliberately didn’t show the probability densities, because the team wanted to begin with a minimal interface and build from there8. A probabilistic display for the control room came later, in the project extension1.

    Rollout

    The phases took Quartz from an innovation project to a service that NESO runs as business as usual1.

    Figure 1From innovation project to control room service
    From innovation project to control room serviceNational Grid ESO and Open Climate Fix announced the solar nowcasting project in August 2021, and it started in September 2021. The first interface prototype was shown to NESO stakeholders in June 2022. The first fully operational version of the service reached the control room in December 2022. By the 2024 progress update the service ran on two machine learning models. In November 2025 Open Climate Fix announced that Quartz Solar was fully integrated into NESO's operations, and NESO submitted the close-down report in January 2026. No event is inferred.Aug 2021Aug 2021 · ESO and Open Climate Fix announce the project · Documented in source [3]ESO and Open ClimateFix announce the projectSep 2021Sep 2021 · Innovation project starts · Documented in source [1]Innovation project startsJun 2022Jun 2022 · First interface prototype shown to NESO · Documented in source [1]First interface prototype shown to NESODec 2022Dec 2022 · First operational service in the control room · Documented in source [9]First operational servicein the control room20242024 · Service runs on two ML models · Documented in source [2]Service runs on two ML modelsNov 2025Nov 2025 · Quartz fully integrated into NESO operations · Documented in source [4]Quartz fully integratedinto NESO operationsJan 2026Jan 2026 · NESO submits the close-down report · Documented in source [1]NESO submits the close-down report
    • Key milestone
    Sources [1][2][3][4][9]
    The forecast reached the control room 15 months after the project started, and was fully integrated by November 2025.

    A 15-month extension added £355,000 to the project costs1. It delivered probabilistic forecasts for every horizon and stretched the national forecast from 8 hours to 36 hours1. Two more extensions tested the forecast with NESO’s Dynamic Reserve Setting model, a separate machine learning project for sizing reserve, for £80,000, and researched weather ensembles over 7 more months for £103,5001.

    In July 2025, Open Climate Fix announced a partnership with Google DeepMind12. It planned to use DeepMind’s AI weather forecasting technology to improve UK solar forecasts12.

    Technology and architecture

    Figure 2How Quartz Solar turns satellite and weather data into control room forecasts
    How Quartz Solar turns satellite and weather data into control room forecastsEUMETSAT satellite images, Met Office and ECMWF weather forecasts, and PV generation estimates from PV Live flow into ingestion services that store them in AWS S3 and RDS. The ingestion services feed PVNet, which forecasts each grid supply point, and an XGBoost national model; the inputs to the national model are inferred. Both models send forecasts to a forecast API, which feeds the Quartz web interface in the NESO control room, where engineers consult a probabilistic display and decide how much reserve to hold. The API is also open to energy traders and smart home operators.satellite images (data) · Documented in source [1]weather forecasts (data) · Documented in sources [1] [5]PV output (data) · Documented in source [1]model inputs (data) · Documented in sources [1] [5]model inputs (data) · Inferred, not documented in the sourcesregional forecasts (data) · Documented in source [1]national forecast (data) · Documented in source [1]probabilistic forecasts (data) · Documented in source [1]daily display (handoff to people) · Documented in source [1]how much to hold (handoff to people) · Documented in sources [1] [10]open API (data) · Documented in source [1]WEATHER AND GENERATION DATAQUARTZ SOLAR ON AWSNESO CONTROL ROOMEUMETSAT satellite images · Data · Documented in sources [1] [5]DATAEUMETSATsatelliteimagesMet Office and ECMWF forecasts · Data · Documented in sources [1] [5]DATAMet Officeand ECMWFforecastsPV Live generation estimates · Data · Documented in sources [1] [5]DATAPV LivegenerationestimatesIngestion services (S3, RDS) · System · Documented in source [1]SYSTEMIngestionservices(S3, RDS)PVNet, per grid supply point · AI model · Documented in source [1]AI MODELPVNet, pergrid supplypointXGBoost national model · AI model · Documented in source [1]AI MODELXGBoostnational modelForecast API · System · Documented in source [1]SYSTEMForecast APIQuartz web interface · Application · Documented in source [1]APPLICATIONQuartz webinterfaceControl room engineers · Team · Documented in source [1]TEAMControl roomengineersReserve decisions · Step · Documented in sources [5] [10]ReservedecisionsTraders and smart home firms · External · Documented in source [1]EXTERNALTradersand smarthome firmssatellite imagesweatherforecastsPV outputmodel inputsmodel inputsregionalforecastsnationalforecastprobabilisticforecastsdaily displayhow muchto holdopen APIHow Quartz Solar turns satellite and weather data into control room forecastsEUMETSAT satellite images, Met Office and ECMWF weather forecasts, and PV generation estimates from PV Live flow into ingestion services that store them in AWS S3 and RDS. The ingestion services feed PVNet, which forecasts each grid supply point, and an XGBoost national model; the inputs to the national model are inferred. Both models send forecasts to a forecast API, which feeds the Quartz web interface in the NESO control room, where engineers consult a probabilistic display and decide how much reserve to hold. The API is also open to energy traders and smart home operators.satellite images (data) · Documented in source [1]weather forecasts (data) · Documented in sources [1] [5]PV output (data) · Documented in source [1]model inputs (data) · Documented in sources [1] [5]model inputs (data) · Inferred, not documented in the sourcesregional forecasts (data) · Documented in source [1]national forecast (data) · Documented in source [1]probabilistic forecasts (data) · Documented in source [1]daily display (handoff to people) · Documented in source [1]how much to hold (handoff to people) · Documented in sources [1] [10]open API (data) · Documented in source [1]WEATHER AND GENERATION DATAQUARTZ SOLAR ON AWSNESO CONTROL ROOMEUMETSAT satellite images · Data · Documented in sources [1] [5]DATAEUMETSATsatellite imagesMet Office and ECMWF forecasts · Data · Documented in sources [1] [5]DATAMet Office andECMWF forecastsPV Live generation estimates · Data · Documented in sources [1] [5]DATAPV Live generationestimatesIngestion services (S3, RDS) · System · Documented in source [1]SYSTEMIngestion services(S3, RDS)PVNet, per grid supply point · AI model · Documented in source [1]AI MODELPVNet, per gridsupply pointXGBoost national model · AI model · Documented in source [1]AI MODELXGBoostnational modelForecast API · System · Documented in source [1]SYSTEMForecast APIQuartz web interface · Application · Documented in source [1]APPLICATIONQuartz web interfaceControl room engineers · Team · Documented in source [1]TEAMControl room engineersReserve decisions · Step · Documented in sources [5] [10]Reserve decisionsTraders and smart home firms · External · Documented in source [1]EXTERNALTraders andsmart home firmssatellite imagesweather forecastsPV outputmodel inputsmodel inputsregional forecastsnational forecastprobabilistic forecastsdaily displayhow much to holdopen API
    • AI component
    • Data
    • Handoff to people
    • Inferred, not documented
    Sources [1][5][10]
    Two models produce the forecast, and control room engineers use it to decide how much reserve to hold.

    The system is a set of microservices with clear interfaces on Amazon Web Services (AWS)1. The team chose this design so that the system scales and keeps running, and so that one part can change without the others1. The following table lists the components of the solution.

    Layer What they used Role Source
    Forecasting model PVNet Forecasts each grid supply point from satellite, weather and recent generation data; alone for the first six hours 1, 8, 13
    Forecasting model XGBoost National model that forecasts total output directly; blended from six to eight hours, alone beyond 1
    Solution platform Quartz Solar Open Climate Fix’s forecast service for the NESO control room 1, 4
    Operations console Quartz web interface Dashboard, delta view and probabilistic display on a control room screen 1, 2
    Service API Forecast API Serves national and regional forecasts to NESO and outside users, with access security 1
    APIs and connectors Data ingestion services Collect satellite, weather and PV data into the data stores 1
    Cloud platform Amazon Web Services Hosts the microservices, S3 and RDS stores and the API 1
    Training pipeline Training data pipeline Prepares the data the models train on; a more flexible version came with PVNet 2.0 1

    Data inputs

    The models use the following data:

    • Satellite images: Images in 12 spectral channels, including infrared, visible, and water vapor, give a live view of clouds5.
    • Weather forecasts: Numerical weather predictions from ECMWF and the Met Office cover irradiance, temperature, wind, air pressure, and cloud cover at several heights5.
    • Generation estimates: PV Live is the main source of generation data, and its estimates are modeled on more than 1,000 sites5. The models learn to predict these estimates, and the interface shows them beside the forecast8.

    Integrations

    Ingestion services connect the forecast to its data providers:

    • UK Met Office: One service fetches numerical weather predictions and stores them in AWS S31.
    • EUMETSAT: Another service fetches satellite images and stores them in AWS S31.
    • PV Live: A third service pulls grid supply point output into an AWS relational database1.

    Models and training

    PVNet puts the satellite and weather data through separate 3D convolutional neural networks8. It joins the results with recent PV readings, the date and time, and the sun’s position, and then predicts the output of each grid supply point8.

    Open Climate Fix’s code calls this design late fusion13. Each data source is encoded separately into a compact representation13. An output network makes the prediction from these representations, recent generation, the solar coordinates, and the location13.

    PVNet 2.0, built during the extension, added more weather variables, ECMWF data, and ensembling, for a 29% decrease in mean absolute error1. It also moved to a more flexible data pipeline, which let the team iterate faster in training1.

    The team ran training and production with the following practices:

    • Pre-prepared batches: The team saved thousands of training batches as separate files on disk, which proved much faster than loading data on the fly1.
    • Research hardware: The team built two computers with a total of six GPUs, which it judged far cheaper than cloud machines for data-heavy work. Putting them together took about 25 days of one person’s time1.
    • Infrastructure as code: Terraform defines the infrastructure. Separate development and production environments let new features be tested while the live forecast keeps running. NESO built the service’s resilience, with all the infrastructure in code1.
    • Validation and security: The service validates data in both training and inference, and security on the API keeps unauthorized users out1.

    How one forecast run flows through the system

    In June 2022, the forecasting service ran every five minutes8. A REST API served the result, and Open Climate Fix controlled which users could log on to the interface8. Later, the run gained the national model and the blend of the two models by horizon1.

    Figure 3One forecast run, as the service worked in 2022
    One forecast run, as the service worked in 2022Every five minutes the forecasting service loads the latest satellite, weather and PV data, converts it into the inputs for each grid supply point, validates the data, runs the machine learning models, saves the forecasts in a database and post-processes them, for example setting them to zero at night. A REST API serves the forecasts to the web interface in the control room. No step is inferred. (data) · Documented in source [8] (data) · Documented in source [8] (data) · Documented in source [8] (data) · Documented in source [8] (data) · Documented in source [8]forecasts (data) · Documented in source [8]display (data) · Documented in source [8]FORECASTING SERVICEDELIVERYLoad latest input data · Step · Documented in source [8]Load latest input dataPrepare inputs per supply point · Step · Documented in source [8]Prepare inputsper supply pointValidate the data · Step · Documented in source [8]Validate the dataRun the ML models · AI model · Documented in source [8]AI MODELRun the ML modelsSave forecasts to database · Data · Documented in source [8]DATASave forecaststo databasePost-process, zero at night · Step · Documented in source [8]Post-process,zero at nightREST API · System · Documented in source [8]SYSTEMREST APIControl room interface · Application · Documented in source [8]APPLICATIONControl room interfaceforecastsdisplay
    • AI component
    • Data
    Source [8]
    Every five minutes the service validated fresh inputs, ran the models and published the forecast through the API.

    Results

    The following table lists the reported results.

    Metric Before After Scope and timeframe Reported by
    Error against existing forecasts PEF and BMRS forecasts 38% and 39% lower National forecast, by the end of the third work package NESO, pilot1
    Days with a 1 GW forecast error 23% of days (PEF) 5% of days Period not stated NESO, pilot1
    National mean absolute error, up to two hours ahead 650 MW (NESO forecast, 2021) 233 MW Best first-phase model, trained on 2020 data and tested on 2021 data NESO, pilot1
    Savings a year Not disclosed about £30 million Since integration into the control room, as stated in December 2025; method not given NESO, estimated10
    Accuracy against existing forecasts, zero to eight hours ahead BMRS and PEF forecasts approximately 40% and over 40% better 2024 progress, period not stated NESO, pilot1, 2
    Reserve setting Not disclosed almost 100 MW lower Backtests with the Dynamic Reserve Setting model NESO, pilot1
    Service availability Not disclosed over 99.5% Over the project NESO, measured1

    The metrics need the following context:

    • Existing forecasts: The PEF forecast produced NESO’s half-hourly solar forecasts1. The Balancing Mechanism Reporting Service (BMRS) model was the other forecast NESO used1.
    • Mean absolute error: The first-phase model was 2.8 times better than the NESO forecast for forecasts up to two hours ahead1. The best second-phase model, Power Perceiver, reached 190 MW on the same test data1, 8.
    • 2024 progress: The gain followed an improvement of approximately 30% over Open Climate Fix’s previous model, four to eight hours ahead1, 2. It met NESO’s target of a 20% reduction in error for the extension1.
    • Demand forecast: Quartz cut the error of NESO’s demand forecast by 8%1. Under an ESO rule of thumb, cutting the daily demand forecast error by 10 MW is worth around £20 million a year1. The close-down report values the cut at over £40 million a year1.
    • Reserve setting: The close-down report expects savings of up to 96 MW per settlement period1. It puts them at up to £30 million and hundreds of thousands of tonnes of CO2 a year1.
    • Savings a year: NESO gave its estimate in December 2025, and says it could rise to £150 million a year by 2035 as more solar connects10. Open Climate Fix puts it at at least £30 million in avoided imbalance costs and around 300,000 tonnes of CO2 a year4.

    Lessons learned

    Quartz was measured against the forecasts NESO actually used, and it didn’t stay a prototype. By January 2026, it had been on a control room screen for over 2 years, consulted daily, and NESO called it a business-as-usual service1. Microservices let the team start with a trivial forecast model and improve one part at a time, and infrastructure as code kept production running during tests1.

    Every accuracy and savings figure comes from NESO or Open Climate Fix. The close-down report was compiled from information collected by NESO and its project partners, and it tells readers not to rely on its contents without checking them1. The independent coverage, in pv magazine, attributes its figures to Open Climate Fix5.

    The savings figures differ by source. The close-down report’s up to £30 million comes from reserve backtests, and its over £40 million rests on a rule of thumb1. Open Climate Fix calls it at least £30 million in imbalance costs, and NESO states about £30 million a year since integration4, 10.

    The accuracy and timing claims also come from different stages. Open Climate Fix’s November 2025 claim that Quartz is 2.8 times more accurate repeats a first-phase backtest result for forecasts up to two hours ahead4, 1. The update interval is every minute to NESO and Open Climate Fix, 15 minutes to pv magazine, and five minutes in the 2022 report10, 4, 5, 8.

    Weather ensembles weren’t in the running service when the project closed. In research, they improved deterministic accuracy by 5% and cut large errors by up to 12%1. NESO said more research was needed on choosing and weighting ensemble members1. Large machine learning models proved hard to put into production because of their demands on compute, memory, and latency1. Slow data processing also ended the plan to extend the dataset back to 20161.

    Other difficulties were practical. ECMWF data ran to over 100GB a day, delays in getting it added 5 months to the ensemble work, and the team cut back to one weather source1. PV Live’s update of its grid supply point regions meant reworking data, and authentication and security were harder than expected1. High turnover in NESO’s forecasting team got in the way of communication until later in the project, and an open-source community needed time and resources of its own1.

    Case study scorecard

    Build this solution yourself

    Analysis

    What you need

    To build this solution, you need the following in place:

    • A trusted estimate of actual output at the level you forecast: PV Live’s estimates for each grid supply point and the nation gave the models a target to learn and the control room a figure to check against5, 8.
    • Live satellite and weather feeds that arrive on time: Each run of the forecasting service starts from the latest satellite images and weather predictions1, 8.
    • A team that runs models as a service: Separate development and production environments let the team test new features while the live forecast keeps running1.
    • A control room that reads a probabilistic forecast when it sets reserve: NESO’s engineers consulted the forecast daily and use it to decide how much energy to hold in reserve1, 10.

    Reference architecture

    Forecasting and planning

    A forecasting and planning solution predicts demand, supply, load, or events from history and outside data, and turns the prediction into a plan such as orders, prices, stock positions, reserve, or crews. Each cycle, forecasting models turn fresh data into a forecast, and an optimizer can turn it into a proposed plan within set targets and limits. Planners decide and enter the plan in the operational system, or they steer an automatic plan through targets and overrides.

    A check mark shows a building block that this case study's sources document.

    Open the reference architecture

    Others who built it

    • UK Power Networks: Its AI for Visibility and Forecasting of Renewable Generation project, built with Open Climate Fix, estimates rooftop solar the grid doesn’t capture6. It also forecasts unmetered output at each primary substation6.
    • Google: By February 2019, machine learning forecasts of wind output 36 hours ahead had raised the value of 700 megawatts of its US wind capacity by roughly 20%7.

    Cite this case study

    Enterprise AI Case Studies. "AI solar nowcasting cuts forecast errors at Britain's NESO." Updated Nov 19, 2026. https://case-studies.ai/case-studies/operational-technology/OT-001-energy-grid-optimization/

    @misc{csai-ot-001,
      author = {{Enterprise AI Case Studies}},
      title = {{AI solar nowcasting cuts forecast errors at Britain's NESO}},
      year = {2026},
      note = {Updated 2026-11-19},
      url = {https://case-studies.ai/case-studies/operational-technology/OT-001-energy-grid-optimization/}
    }

    Sources

    The following reporting, and every passage quoted from it, belongs to its publisher, not to this site. Sources and ownership

    1. Source 1:

      NIA Project Close Down Report: Solar PV Nowcasting (NIA2_NGESO002)

      OrganizationNational Energy System Operator, Jan 2026DocumentAccessed Nov 16, 202616 Nov 2026

      Supporting excerpts (92)
      • Date of Submission Jan 2026
      • Project Start Date September 2021
      • Research ways to run the nowcasting ML models every 5 minutes for all of the 1 million PV systems in the UK.
      • NESO's existing national solar PV forecasts model in 2021 had a Mean Absolute Error (MAE) of 650 MW.
      • The best national PV forecasts developed in this WP had a MAE of 233 MW an improvement of 64%.
      • At the end of WP1, the national solar generation forecast was 2.8 times better than the NESO PV forecast (for forecasts up to two hours ahead).
      • The models were trained on data from 2020 and evaluated on data from 2021.
      • We used the same training and evaluation data as the data we used in WP1, to allow us to compare the WP2 models with the WP1 models.
      • reduced the national forecast error to about 80% of the error in our best model from WP1 (from 233 MW to 190 MW)
      • deploy the infrastructure on Amazon Web Services (AWS) to make the system easily scalable and robust
      • This service will collect relevant numerical weather predictions from the UK Met Office and save them to an AWS S3 bucket.
      • This service will collect relevant satellite images from European Organisation for the Exploitation of Meteorological Satellites (EUMETSAT) and save the images to an AWS S3 bucket.
      • This service collects live PV output data from ‘pvoutput.org’ and saves this data to an AWS Relational Database Service (RDS).
      • This service collects live GSP output data from ‘PVlive’ and saves this data to an AWS RDS.
      • The results are then presented through the Application Programming Interface (API) and User Interface (UI) components.
      • A session was held in June 2022 with relevant NESO stakeholders to demonstrate the first UI prototype of the service.
      • a relatively low-risk model named “PVNet” which is an evolution of the Convolutional Neural Network (CNN) we developed in WP1
      • a high ambition but more experimental model
      • The PVNet model is running in production now.
      • resulted in the successful deployment of the first version of the forecast for use by the control room
      • started working on creating national forecasting model based on Extreme Gradient Boosting (XGBoost)
      • in contrast to the current model (PVNet) that was predicting each grid supply point and then summing up the generation afterwards
      • Fully operational PV Nowcasting service ran on two ML models: 1. PVNet for 0-6 hours 2. Blend of PVNet and National_xg for 6-8 hours, and National_xq from 8 hours and beyond.
      • PVLive estimate of National Solar generation does not equal the sum of PV Live’s GSP generation estimate. This motivated us to build a separate National forecast, compared to adding our GSP forecast.
      • The project was extended by 15 months to deliver the model’s probabilistic forecast results
      • This extension included an additional £355,000 in the project costs.
      • Extended National Forecast from 8 hours to 36 hours.
      • we developed PVNet 2.0 through the extension
      • The model used an increased number of Numerical Weather Prediction (NWP) variables, PVNet summation, European Centre for Medium-Range Weather Forecasts (ECWMF) data and ensembling for model improvements providing a 29% decrease in MAE.
      • Backtest runs for Dynamic Reserve Setting (DRS) project showing almost 100 MW reduction in reserve settings
      • The Terraform software tool was used
      • Two environments in the cloud, “development” and “production,” are maintained to protect the “production” data.
      • Two computers have been built during the project with a total of six GPUs
      • using on-premises hardware instead of the cloud for data-heavy & GPU heavy machine learning R&D can significantly reduce the direct costs
      • The API was deployed on Amazon Web Services and can now be accessed by anyone.
      • the forecast from Open Climate Fix was delivered completely open and documented
      • resulting in over 99.5% availability
      • with errors 38% and 39% lower respectively by the end of Work Package 3
      • 1 GW errors being recorded on 23% of days using PEF, and 5% of days using Quartz
      • Balancing Mechanism Reporting Service (BMRS) model
      • Research ways to blend PV Live with PEF's half-hourly PV forecasts with OCF's 5-minutely PV nowcasts.
      • These forecasts were displayed on one of the large screens in the control room for over 2 years and were consulted daily by the control room Engineers.
      • Using a rule of thumb method from ESO: Forward Plan Technical Annexe
      • reducing the daily demand forecast by 10 MW resulted in around a £20m reduction in annual costs
      • Using Quartz forecast was found to reduce the demand forecast error using the NESO model by 8%, or many tens of MW, or over £40M per year.
      • through the additional Dynamic Reserve Setting savings of up to 96 MW per settlement period, NESO will benefit from up to £30 millionpounds
      • The Quartz forecast is being used by 8 energy traders and smart home operators
      • using information collected and compiled by NESO and its Project partners
      • Particularly high turnover at NESO forecasting team affected communication on the project.
      • While it was initially planned to extend our dataset back to 2016 for all data sources during WP2, it turned out that data processing took much longer than expected.
      • Large Machine Learning models proved to be difficult to productionise due to their substantial requirements for compute, memory, latency and operational overhead
      • Results show that incorporating NWP ensemble improved deterministic forecast accuracy by 5% and reduced large forecasting errors by up to 12%.
      • Integration of NWP ensemble into existing PV Nowcasting service running was not done yet
      • Obtaining ECMWF data proved challenging due to its substantial size (over 100GB per day)
      • the initial timeline was extended by 5 months due to delays in acquiring weather ensemble data from external sources
      • Time and resources are needed to engage with open-source contributors and develop an active community.
      • While the original project output is already in use within the Control Room
      • Project Duration 3 years and 9 months
      • We also improved the API by adding security which allowed us to give secure API access to users and prevent unauthorised users accessing the service.
      • We back tested the probabilistic forecast with a train and test set to check the results are not over fit, and the live results will have the same accuracy.
      • probabilistic display for the Control Room
      • UI speedup, with query times from 20s down to <1 second
      • resulting in a 12x increase in training speed compared to loading data on-the-fly
      • The more effective approach has been to pre-prepare thousands of batches and save each batch as a separate file on disk.
      • For both ML training and inference, using clear and simple data validation builds trust in the data. This helps build a reliable production system and keeps software bugs at a minimum.
      • This was validated over WP3 through working with the end users (control room engineers).
      • By acknowledging that UX and UI design is a specialised area and incorporating those skills, a UI was developed which will be easier to use and convey information effectively.
      • Being able to spin up new environments allowed the project to test new features in development environments while allowing the main production to keep running uninterrupted.
      • where changes do not affect the live service
      • Using a microservice architecture allowed the project to upgrade individual components as we saw benefits in improving them, independently of changing other components’ behaviour.
      • start with a simple architecture - even a trivial forecast model - and iteratively improve the functionality in the components
      • Accuracy improvement over the previous OCF model by approximately 30% for the GSP and National forecasts (4-8 hours)
      • approximately 40% more accurate than the Balancing Mechanism Reporting Service (BMRS) model and over 40% against the PEF forecast (for 0-8 hours)
      • The most significant of these was the achievement of the target set by NESO of a 20% reduction in MAE error.
      • This resilience was implemented by NESO, with all the infrastructure constructed in code to allow replicability.
      • The work is having an impact outside of NESO, as well as being a BAU service for NESO.
      • Control Room Engineers are making better decisions every day with this improved solar forecast
      • Feedback, evolve, develop with Control Room engineers to learn what they do and don't like about the prototype PV nowcasting
      • the approach was revised to utilise only one weather data source
      • which can range from over 60 hours for a month's archive to as much as 120 hours depending on the archival system's workload
      • Running inference for 50 forecast versions for a single Grid Supply Point (GSP) took approximately 5 seconds
      • This extension did not affect the project timeline but added an additional £80,000 to the project costs.
      • This further extension added 7 months to the project timeline and an additional £103,500 to the project costs.
      • Probabilistic Machine Learning Solution for Dynamic Reserve Setting
      • and 100,000s of Tonnes of CO2 per year in savings
      • Due to PVLive updating its GSP regions, we spent a reasonable amount of time making the GSP data updates.
      • Ensuring robust authentication/security measures are in place was harder than we envisaged.
      • It also used a new, more flexible data pipeline which allowed faster iteration when training the model.
      • the NWP extension will require additional research to determine optimal methods for selecting ensemble members and assigning weights to enhance forecast performance
      • approx. 25 days for one person in total
      • viewers of the Report should not place any reliance on any of the contents of this Report
      • However, the time it would require for a small team to put together all the components was significant
    2. Source 2:

      PV Nowcasting

      OrganizationNational Energy System OperatorAccessed Nov 16, 202616 Nov 2026

      Supporting excerpts (6)
      • Using Deep Machine learning techniques, this project is exploring whether if we had more accurate predictions for solar electricity generation then we could reduce the amount of "spinning reserve" required.
      • This would reduce carbon emissions and reduce costs to end-users, as well as increase the amount of solar generation the grid can handle
      • The outcomes of the project to date are (2024 progress):
      • Fully operational PV Nowcasting service running on two ML models
      • Photovoltaics £500,000 Open Climate Fix (OCF)
      • UI including a new Delta view, dashboard view and probabilistic display
    3. Source 3:

      Former DeepMind expert's AI tool could help boost National Grid ESO's solar forecasts

      OrganizationNational Energy System Operator, Aug 19, 202119 Aug 2021DocumentAccessed Nov 16, 202616 Nov 2026

      Supporting excerpts (15)
      • Thursday 19 August 2021
      • a non-profit start-up co-founded by former DeepMind researcher Jack Kelly
      • to develop a first-of-its-kind solar ‘nowcasting’ service for its national control room
      • which balances Britain’s electricity system second by second to keep the lights on
      • training a machine learning model to read satellite images and understand how and where clouds are moving in relation to solar arrays below
      • Changes in solar generation are difficult for grid operators to anticipate owing not only to uncertainty in forecasts, but also uncertainty around the location of many solar panels
      • most of which are connected to regional networks
      • previously there’s been no way to anticipate short term swings in solar generation caused by cloud cover
      • the ESO keeps reserve power, often flexible gas plants, in readiness to respond to unexpected changes in supply or demand
      • It would mark a significant step in the ESO’s ambition to be able to operate a zero carbon electricity system by 2025.
      • Carolina Tortora, head of innovation strategy and digital transformation at National Grid ESO, said:
      • our forecasts, the less we’ll have to cover for uncertainty by keeping traditional, more controllable fossil fuel plants ticking over.
      • Jack Kelly, co-founder of Open Climate Fix, said:
      • All our work will be open-source, so others will be free to use the technology to help reduce emissions globally as rapidly as possible.
      • control room have already resulted in a 33% improvement in the accuracy of solar forecasts in recent years
    4. Source 4:

      National Energy System Operator adopts AI solar forecasting to save £30m and slash 300,000 tonnes of CO₂ every year

      Partner or vendorOpen Climate Fix, Nov 6, 20256 Nov 2025Accessed Nov 16, 202616 Nov 2026

      Supporting excerpts (11)
      • Open Climate Fix, the not-for-profit climate-tech organisation, has today announced that Quartz Solar, its AI-powered solar forecasting tool, is now live in the National Energy System Operator’s (NESO) control room.
      • helping to avoid at least £30 million in imbalance costs each year and cutting around 300,000 tonnes of CO₂ emissions
      • Quartz Solar has halved large errors, and is 2.8 times more accurate than previous solar generation forecasting tools used by NESO.
      • Developed in collaboration with NESO’s Energy Forecasting team, Quartz Solar began as an innovation project, supported by NESO’s AI Centre for Excellence.
      • it is now fully integrated into NESO’s operations
      • from day-ahead scheduling to real-time control
      • Traditional forecasting methods rely on numerical weather predictions that update only every few hours, which often miss rapid shifts in cloud cover and solar output.
      • then refines them minute by minute
      • Thanks to the success of our Network Innovation Allowance (NIA) project, Open Climate Fix and the National Energy System Operator developed a cutting-edge tool that can accurately predict solar generation up to 36 hours in advance—revolutionising our solar forecasts in the control room.
      • Carolina Tortora, Head of AI, Digitalisation and Innovation at NESO, said:
      • Seeing Quartz Solar go from concept to core infrastructure is a huge milestone for us – and for non-profit climate tech.
    5. Source 5:

      AI powered solar forecasting helps UK grid operator reduce balancing costs

      Independentpv magazine, Nov 7, 20257 Nov 2025Accessed Nov 16, 202616 Nov 2026

      Supporting excerpts (15)
      • Quartz Solar from Open Climate Fix is now being used in the National Energy System Operator (NESO) control room to forecast PV generation and inform decisions on how much reserve capacity should be purchased to ensure balanced supply and demand.
      • Since adoption, Quartz Solar has halved forecasting errors, according to Open Climate Fix
      • with potential to increase to GBP 150 million ($197.0 million) per year in 2035 if government solar capacity targets are met
      • The forecasting tool works by using machine learning techniques in conjunction with satellite imagery, weather data and historical PV data to predict solar generation within the same day, and up to 36 hours in advance.
      • uses satellite data in 12 different spectral channels
      • which also provides a live view on clouds
      • This data includes infrared, visible terrain and water vapor.
      • Weather data is sourced from ECMWF and the United Kingdom’s Met Office, and includes irradiance, temperature, wind speed and direction at multiple discrete heights
      • air pressure, snow depth and cloud cover at multiple heights, and visibility
      • Open Climate Fix uses PV Live as its main data source for PV generation.
      • the generation data is modeled on more than 1,000 sites and includes transmission and distribution data
      • Quartz Solar provides NESO with a national forecast as well as a regional breakdown based on UK grid supply points, comprising approximately 300 sites.
      • Traditional weather forecasting methods used by NESO are relatively slow, updating roughly every six hours.
      • machine-learning powered model updates at 15-minute intervals
      • The probabilistic output produced by Open Climate Fix’s model PVNet provides a “most likely” scenario as well as 90th and 10th percentile predictions
    6. Source 6:

      UK Power Networks uses AI to reveal value of solar power

      IndependentTransport & Energy, Jul 21, 202521 Jul 2025Accessed Nov 16, 202616 Nov 2026

      Supporting excerpts (3)
      • By the end of 2023, the UK had 20 gigawatts of solar power installed, including 4.2GW on homes.
      • the firm’s AI for Visibility and Forecasting of Renewable Generation project, developed in partnership with Open Climate Fix (OCF), uses machine learning to estimate rooftop solar capacity not captured by the grid.
      • a forecasting model that predicts how much unmetered solar energy will be produced at each primary substation
    7. Source 7:

      Machine learning can boost the value of wind energy

      OrganizationGoogle DeepMind, Feb 26, 201926 Feb 2019Accessed Nov 16, 202616 Nov 2026

      Supporting excerpts (3)
      • DeepMind and Google started applying machine learning algorithms to 700 megawatts of wind power capacity in the central United States
      • we configured the DeepMind system to predict wind power output 36 hours ahead of actual generation
      • machine learning has boosted the value of our wind energy by roughly 20 percent, compared to the baseline scenario of no time-based commitments to the grid
    8. Source 8:

      Progress Report: WP2. A General Overview of the Progress Made during Work Package 2 of the NIA Project Solar PV Nowcasting

      Partner or vendorOpen Climate Fix, Jun 2022DocumentAccessed Nov 16, 202616 Nov 2026

      Supporting excerpts (38)
      • OPEN CLIMATE FIX June 2022
      • Prepared by Open Climate Fix Limited
      • culminating in the first release of the UI to NG ESO ready for the start of July
      • The Power Perceiver model shows higher performance at the end of WP2, and has further potential for improvement.
      • The Power Perceiver will be put into production in early WP3.
      • we conducted over 1,000 ML experiments over WP2
      • both predict 8 hours into the future
      • This model takes both satellite and NWP video data and puts them through separate 3D convolutional neural networks.
      • In addition, datetime features are added, and the position of the Sun is also used
      • OCF OptiFlow 232.6 6.34 OCF WP2
      • OCF Power Perceiver 190.0
      • Our code adds up these predictions of GSP PV power to get a national forecast.
      • the errors are not normally distributed
      • the model appears to systematically over-predict or under-predict GSP PV power in particular weather regimes
      • the probability densities are not communicated to the user. This was a deliberate decision
      • This occurs every five minutes and the images are approximately 15 minutes delayed from real time
      • We download the latest NWP data using the new Met Office Weather Datahub API.
      • We are collecting data from approximately 1,000 PV systems from around the UK at a five minute granularity.
      • These provide the training target for our ML models as well as displaying the information in our UI.
      • The models we chose to take to production are run in the forecasting service which runs every five minutes.
      • Loads the input data; 2. Converts it into the relevant data for each GSP location; 3. Validates the data; 4. Runs ML models; 5. Forecasts are saved in a database;
      • making sure the forecasts are zero during the night
      • we decided to first put the PVNet model into production
      • are also in the process of preparing the Power Perceiver model for production
      • We have built a REST API that serves the forecasts.
      • Authentication is performed via Auth0.
      • OCF controls which users are allowed to log on.
      • OCF embarked upon user interviews with the key stakeholders and users of the forecast
      • first meeting of this group in May 2022
      • we established a Working Steering Committee
      • Operational Manager at ESO Control Room - Alex Carter, Lead Data Scientist - Lyndon Ruff
      • over 8TB of weather, satellite, and PV data publicly available
      • was developed from scratch for WP2
      • which takes inspiration from the Vision Transformer
      • the winning team of the ClimateHack.AI machine learning competition
      • joined with some simple input data like historic PV data
      • We had hoped that predicting individual GSPs and summing them would result in a skillful national PV forecast.
      • Weather regimes tend to span many GSP regions at a time.
    9. Source 9:

      Solar NowCasting innovation project improves solar forecasting

      OrganizationNational Energy System Operator, Jul 19, 202419 Jul 2024Accessed Nov 16, 202616 Nov 2026

      Supporting excerpts (6)
      • 19 Jul 2024 - 3 minute read
      • solar is embedded generation, meaning it is connected to a distribution network rather than the transmission network, making it invisible to grid operators
      • our Control Room must keep power in reserve to make up any shortfalls in solar generation caused by cloud cover or unexpected changes in the weather
      • of April/May and September/October when the weather is more unpredictable
      • The project has developed a deep learning model, which takes a sequence of recent satellite images and numerical weather predictions.
      • The first version of a fully operational PV Nowcasting service was delivered to our control room in December 2022.
    10. Source 10:

      How solar is providing secure, clean and affordable energy to Great Britain

      OrganizationNational Energy System Operator, Dec 1, 20251 Dec 2025Accessed Nov 16, 202616 Nov 2026

      Supporting excerpts (8)
      • 1 Dec 2025 - 3 minute read
      • Our energy forecasting team has partnered with Open Climate Fix to create a new tool that will help unlock the power of solar, called Quartz Solar.
      • produce forecasts that are continuously refined every minute, enabling accurate predictions of solar generation for the same day and up to 36 hours ahead
      • After thorough testing, this AI-driven solution is now fully integrated into our control room operations, allowing us to forecast photovoltaic (PV) generation and make informed decisions on how much energy we need to hold in reserve to meet supply and demand needs.
      • Since its integration into our control room, Quartz Solar has enhanced the precision of our forecasting, delivering savings of approximately £30 million each year.
      • This figure could rise to £150 million annually by 2035
      • In 2024, solar energy accounted for 5% of Great Britain
      • On 8 July 2025, Great Britain set a record for maximum solar generation reaching a peak of 14,023 MW, which at that time supplied 40% of the nation
    11. Source 11:

      Sun in Their AIs: Nonprofit Forecasts Solar Energy for UK Grid

      Partner or vendorNVIDIA, Feb 24, 202324 Feb 2023By Isha SalianAccessed Nov 16, 202616 Nov 2026

      Supporting excerpts (8)
      • February 24, 2023 by Isha Salian
      • the control room of the National Grid Electricity System Operator (ESO) is testing AI models that provide granular, near-term forecasts of sunny and cloudy conditions over the country
      • AI models are trained on terabytes of satellite data captured at five-minute intervals over Europe, the Middle East and North Africa.
      • hourly weather predictions at ten-kilometer resolution, topographic maps, information about the time of day and the sun
      • transformer-based AI models are 3x better at predicting solar energy generation than the forecasts generated by ESO
      • The physics-based forecasting models are powerful for predicting weather on the scale of days and weeks, but take hours to produce — making them ill-suited for predictions at the hour or minute level
      • Open Climate Fix uses a cluster of NVIDIA RTX A6000 GPUs granted through an NVIDIA Hardware Grant to power its work.
      • the team shifts its overflow workload to NVIDIA A100 Tensor Core GPUs available through cloud service providers
    12. Source 12:

      AI-Based Weather Forecasting is Enabling the Renewable Energy Transition

      Partner or vendorOpen Climate Fix, Jul 9, 20259 Jul 2025Accessed Nov 16, 202616 Nov 2026

      Supporting excerpts (6)
      • Jul 09, 2025 Authors Open Climate Fix
      • Open Climate Fix has partnered with Google DeepMind
      • increasing accuracy by 40%
      • We plan to leverage Google DeepMind
      • technology to further enhance UK solar generation forecasting
      • More recently, we built a second AI tool called Cloudcasting, an innovation that predicts satellite imagery of clouds.
    13. Source 13:

      openclimatefix/PVNet

      Product documentationOpen Climate FixAccessed Nov 16, 202616 Nov 2026

      Supporting excerpts (4)
      • This project is used for training PVNet and running PVNet on live data.
      • PVNet is a multi-modal late-fusion model for predicting renewable energy generation from weather data.
      • The NWP (Numerical Weather Prediction) and satellite data are sent through a neural network which encodes them down to 1D intermediate representations.
      • These are concatenated together with recent generation, the calculated solar coordinates (azimuth and elevation) and the location ID which has been put through an embedding layer.

    More in Operational Technology

    View all