    Stedin plans grid maintenance with machine learning

    Dutch grid operator Stedin built its own machine learning models on location data in Esri's ArcGIS to estimate where its infrastructure is likely to fail and to plan maintenance and replacement on that risk.

    StedinNetherlandsElectric powerIn production
    Scenario
    Grid asset failure-risk modeling for maintenance planning
    Business function
    Energy and asset operations
    Kind of solution
    Predictive maintenance
    Who built it
    Built in-house (Esri)
    Organization
    Enterprise
    AI types
    Machine learning

    Sources and their publishers

    This case study draws on reporting by the following publishers. Enterprise AI Case Studies combined these accounts and added its own explanation. The reporting, and every passage quoted from it, belongs to whoever published or supplied it.

    1. Computable

    tl;drStedin plans maintenance and replacement on an in-house AI risk model of likely grid failures.See the results

    View the solutionBuild this solution yourself

    Dutch grid operator Stedin uses machine learning models that its own team built to predict the maintenance its infrastructure needs and to plan that work1.

    The models estimate how likely a part of the grid is to fail and what a failure would cause. Stedin plans maintenance and replacement on the resulting risk model, to prevent incidents as far as possible1.

    In practice, the predictions are getting more accurate, and Stedin also uses the data to streamline the energy transition1. In June 2023, the jury of the Computable Awards 2023 nominated the project in the Digital Transformation category1.

    Before the deployment

    As a grid operator, Stedin has to predict which maintenance its infrastructure needs and schedule it before parts fail1. Two questions decide that planning1:

    • Likelihood: How likely a potential failure is in a given part of the infrastructure1.
    • Impact: What the consequences of such a failure would be1.

    What was built

    Stedin built AI models that turn location data about its infrastructure into a risk model. The risk model predicts when an incident can happen and in what form, and maintenance and replacement are planned on it1.

    • Failure-probability models: Estimate how likely potential failures are across the infrastructure, from location data brought together in Esri’s ArcGIS1.
    • Effect assessment: Estimates the consequences of such a failure1.
    • Risk model: Combines the two estimates into a prediction of when something can happen and in what form1.
    • Maintenance planning: Stedin schedules maintenance and replacement on the basis of the risk model1.
    • Retraining: Stedin adds the data and results of earlier projects to the models, and machine learning uses them to improve the models1.

    The project ran under the name Energy transition with geographic AI models1.

    Technology and architecture

    Figure 1How Stedin's risk models turn grid data into a maintenance plan
    How Stedin's risk models turn grid data into a maintenance planData from several sources is linked in Esri's ArcGIS as location data about the infrastructure. The location data feeds the failure-probability models and the effect assessment. Both feed the risk model, which predicts when and in what form an incident can happen. Maintenance and replacement planning works from the risk model. Data and results of earlier projects go back into the models for retraining. ArcGIS also shares results with other stakeholders. No part of the figure is inferred.linked data (data) · Documented in source [1]location data (data) · Documented in source [1]location data (data) · Documented in source [1]failure probability (data) · Documented in source [1]consequences (data) · Documented in source [1]when and in what form (handoff to people) · Documented in source [1]retraining (feedback) · Documented in source [1]shared results (data) · Documented in source [1]STEDINInfrastructure data sources · Data · Documented in source [1]DATAInfrastructuredata sourcesEsri's ArcGIS · System · Documented in source [1]SYSTEMEsri's ArcGISFailure-probability models · AI model · Documented in source [1]AI MODELFailure-probabilitymodelsEffect assessment · AI model · Documented in source [1]AI MODELEffectassessmentRisk model · AI model · Documented in source [1]AI MODELRisk modelMaintenance and replacement plan · Step · Documented in source [1]MaintenanceandreplacementplanEarlier project results · Data · Documented in source [1]DATAEarlier projectresultsOther stakeholders · External · Documented in source [1]EXTERNALOtherstakeholderslinked datalocation datalocation datafailureprobabilityconsequenceswhen and inwhat formretrainingshared resultsHow Stedin's risk models turn grid data into a maintenance planData from several sources is linked in Esri's ArcGIS as location data about the infrastructure. The location data feeds the failure-probability models and the effect assessment. Both feed the risk model, which predicts when and in what form an incident can happen. Maintenance and replacement planning works from the risk model. Data and results of earlier projects go back into the models for retraining. ArcGIS also shares results with other stakeholders. No part of the figure is inferred.linked data (data) · Documented in source [1]location data (data) · Documented in source [1]location data (data) · Documented in source [1]failure probability (data) · Documented in source [1]consequences (data) · Documented in source [1]when and in what form (handoff to people) · Documented in source [1]retraining (feedback) · Documented in source [1]shared results (data) · Documented in source [1]STEDINInfrastructure data sources · Data · Documented in source [1]DATAInfrastructuredata sourcesEsri's ArcGIS · System · Documented in source [1]SYSTEMEsri's ArcGISFailure-probability models · AI model · Documented in source [1]AI MODELFailure-probabilitymodelsEffect assessment · AI model · Documented in source [1]AI MODELEffect assessmentRisk model · AI model · Documented in source [1]AI MODELRisk modelMaintenance and replacement plan · Step · Documented in source [1]Maintenance andreplacement planEarlier project results · Data · Documented in source [1]DATAEarlier project resultsOther stakeholders · External · Documented in source [1]EXTERNALOther stakeholderslinked datalocation datalocation datafailure probabilityconsequenceswhen and in what formretrainingshared results
    • AI component
    • Data
    • Handoff to people
    • Feedback
    Source [1]
    Failure probability and effect combine into one risk model, and the results of finished projects flow back into training.

    Esri’s ArcGIS is a geographic information system. In this deployment, it brings all important information about the infrastructure together as location data, by linking data from several sources1.

    Layer What they used Role Source
    Predictive model Failure-probability models Estimate how likely a potential failure is in each part of the infrastructure 1
    Predictive model Effect assessment Estimates the consequences of such a failure, which the risk model combines with its likelihood 1
    Data platform and storage Esri’s ArcGIS Brings infrastructure information from several sources together as location data and shares results 1
    Feedback capture Earlier project results Data and results of past projects that are added to the models to retrain them 1

    Data inputs

    • Infrastructure location data: All important information about the infrastructure, linked from several sources in ArcGIS1.
    • Historical data: The models are trained on data from 2013 onward, to make predictions up to 20421.
    • Earlier project results: The data and results of past projects, which Stedin adds to retrain the models continuously1.

    Integrations

    • Esri’s ArcGIS: Supplies the combined location data to the models and lets Stedin share the results of the work with other stakeholders1.

    Results

    Stedin plans maintenance and replacement on the risk model, so that incidents are prevented as far as possible1.

    • Prediction accuracy: In practice, the predictions are getting steadily more accurate as the models are retrained1.
    • Energy transition planning: Because the predictions improve, Stedin can use the same data to streamline the energy transition1.
    • Recognition: In June 2023, the main jury of the Computable Awards 2023 nominated the project in the Digital Transformation category1.

    Lessons learned

    The design splits risk into two estimates. The failure-probability models say how likely a failure is, the effect assessment says what it would cause, and the plan follows the combination1.

    The models learn from Stedin’s own work. Data and results of earlier projects go back into training, and Stedin retrains its models continuously1.

    One data foundation serves two horizons. The same location data drives the maintenance plan and Stedin’s planning for the energy transition, with predictions that run to 20421.

    The account comes from Computable’s write-up of the project’s Computable Awards 2023 nomination, and its statement that the predictions grow more accurate is qualitative1.

    Case study scorecard

    Sources by publication date

    • Press, academic, and regulators 1

    Build this solution yourself

    Analysis

    What you need

    • Asset data with locations: Stedin’s models rest on location data that links all important infrastructure information in one place1. Check that you can join your asset, fault and maintenance records on location.
    • A long history to train on: Stedin trains on data from 2013 onward1. A failure-probability model needs years of recorded failures before its estimates mean much.
    • Project results that flow back: Stedin improves its models with the results of earlier projects1. You need maintenance records that return in a form a model can learn from.
    • Data scientists in your own team: Stedin built the models in-house1, so the team that knows the grid also owns the models.

    Reference architecture

    Predictive maintenance

    A predictive maintenance solution reads sensor data or fault codes from equipment in service and flags a unit that is drifting toward failure, so that the repair is planned before the breakdown. Readings go from the equipment to a data platform, where models score each unit and rules turn a score into an alert. Maintenance engineers or the equipment's owner act on each alert, and planners or a support team see the repair through.

    A check mark shows a building block that this case study's sources document.

    Open the reference architecture

    Others who built it

    Cite this case study

    Enterprise AI Case Studies. "Stedin plans grid maintenance with machine learning." Updated Nov 27, 2026. https://case-studies.ai/case-studies/operational-technology/OT-066-grid-failure-risk-models-stedin/

    @misc{csai-ot-066,
      author = {{Enterprise AI Case Studies}},
      title = {{Stedin plans grid maintenance with machine learning}},
      year = {2026},
      note = {Updated 2026-11-27},
      url = {https://case-studies.ai/case-studies/operational-technology/OT-066-grid-failure-risk-models-stedin/}
    }

    Sources

    The following reporting, and every passage quoted from it, belongs to its publisher, not to this site. Sources and ownership

    1. Source 1:

      Stedin voorspelt en plant onderhoud met ai

      IndependentComputable, Jun 27, 202327 Jun 2023In DutchAccessed Nov 27, 202627 Nov 2026

      Supporting excerpts (15)
      • Netbeheerder Stedin past op geavanceerd niveau kunstmatige intelligentie en machine learning toe om het noodzakelijke onderhoud van de infrastructuur nauwkeurig te voorspellen en in te plannen.
      • De ai-modellen die binnen het eigen team zijn gemaakt, worden getraind met data vanaf 2013 om daarmee voorspellingen te kunnen doen tot 2042.
      • De praktijk wijst uit dat deze voorspellingen steeds nauwkeuriger worden, waardoor de data ingezet kan worden voor een gestroomlijnde energietransitie.
      • Voor de hoofdjury van de Computable Awards 2023 reden om het project
      • te nomineren in de categorie Digitale Transformatie.
      • Deze modellen zijn gebaseerd op locatiedata die in Esri
      • ArcGIS wordt samengebracht en alle belangrijke informatie over infrastructuur samenvoegt.
      • Hiermee kan Stedin een faalkans-inschatting maken over potentiële storingen in de infrastructuur.
      • Daarnaast wordt ook een effect-inschatting gemaakt om de gevolgen van een dergelijke storing te kunnen bepalen.
      • Samen leidt dat tot een risicomodel: een voorspelling van wanneer er iets kan gebeuren en in welke vorm.
      • Op basis daarvan wordt onderhoud en vervanging ingepland, zodat incidenten zoveel mogelijk worden voorkomen.
      • De data en resultaten van eerdere projecten worden aan de modellen toegevoegd om middels machine learning de modellen verder te verbeteren.
      • Zo traint Stedin de eigen modellen continu en kan het de data gebruiken om de energietransitie te stroomlijnen.
      • ArcGIS ondersteunt Stedin middels een combinatie van data uit verschillende bronnen.
      • Alle bronnen kunnen worden gekoppeld, wat Stedin veel analytische mogelijkheden geeft, zodat de resultaten van het werk makkelijk gedeeld kunnen worden met andere belanghebbenden.