Choose your region

    Lists show the case studies of your region first. Browse and search still hold every case study.

    Europe
    North America

    AI heat rate optimization cuts fuel burn at Vistra's plants

    Vistra worked with McKinsey's QuantumBlack to build a heat rate optimizer that learned each plant's behavior from its sensor history and told control-room operators every half hour which set points to change.

    Vistra Corp.United StatesElectric powerScaled since Oct 2020
    Scale
    67 more power-generation units across 26 plants after Martin Lake, as of May 2022
    Scenario
    Power plant heat rate optimization
    Business function
    Energy and asset operations
    Who built it
    Built with a partner (McKinsey & Company and QuantumBlack, AI by McKinsey)
    Human oversight
    Assists people
    Organization
    Enterprise
    AI types
    Machine learning, Optimization
    Sites
    26 plants

    Sources and their publishers

    This case study draws on reporting by the following publishers. Enterprise AI Case Studies combined these accounts and added its own explanation. The reporting, and every passage quoted from it, belongs to whoever published or supplied it.

    1. McKinsey & Company

    2. WIRED Brand Lab for McKinsey Digital

    3. Power Engineering

    4. POWER

    5. Power Line

    tl;drMartin Lake ran more than 2% more efficiently, and 67 more units averaged a 1% gain.See the results

    View the solutionBuild this solution yourself

    Vistra Corp. uses a machine-learning heat rate optimizer to tell control-room operators which set points to change1. It built the optimizer with a McKinsey team that included data scientists and machine learning engineers from QuantumBlack1. The optimizer went live at the Martin Lake coal plant in Texas in October 20201.

    Heat rate is the fuel a plant burns for each unit of electricity it produces, so a lower heat rate means less fuel, cost, and carbon for the same output1. The optimizer learns from each plant’s history how heat rate responds to the weather and to the settings operators control1, 3. Every 30 minutes, it tells the control room which settings to change1, 3.

    After three months, Martin Lake was running more than 2% more efficiently, a gain put at $4.5 million a year1, 3. By May 2022, Vistra had taken the optimizer to another 67 generating units across 26 plants1. Those units improved by 1% on average, with savings put at more than $23 million1.

    Before the deployment

    Vistra is the largest competitive power producer in the United States, with plants in 12 states and more than 39,000 megawatts of capacity1. At its thermal plants, operators kept the heat rate low by hand1. The work had the following problems:

    • Hundreds of set points: Operators monitored and tuned hundreds of variables, such as steam temperatures, pressures, oxygen levels, and fan speeds. That’s a lot for any operator to get right all of the time, which is why Vistra thought AI could help1.
    • Conditions that move: The best combination isn’t fixed, because it moves with factors that nobody in the control room controls, such as the outside temperature and humidity1, 3.
    • Slow hardware gains: Companies that build gas-fueled power plants spend millions of dollars on research and development over four to five years to win a one-percent improvement in generating efficiency1.
    • Emissions targets: Vistra had committed to cutting emissions 60% by 2030 against a 2010 baseline, and to reaching net zero by 20501.

    The push began with Vistra’s leaders. Fifty of its top leaders attended a McKinsey-hosted workshop on what AI could do1. There, Patrick “Cade” Hay, plant manager of the Lamar gas plant, saw how a metallurgical plant used AI to help its operators optimize set points1.

    Barry Boswell, Vistra’s executive vice president of power-generation operations, picked Hay to try a first proof of concept1. He chose Hay because Hay was knowledgeable and skeptical, and winning him over would win over everyone else1.

    At Lamar, the first insight from the AI model was that operators could run their duct burners less2. Duct burners work like a jet’s afterburners and add a surge of output when needed, but they use more fuel than the plant’s regular methods1.

    What was built

    The heat rate optimizer is an adviser. The engine issues recommendations to the operators every 30 minutes, and the gains come from operators acting on them1. The models are embedded in the existing production workflows and run live in the operator room1, 2. The work is divided as follows:

    • Prediction models: Learn from two years of each plant’s data how heat rate responds to conditions outside the operators’ control and to the set points they do control1, 3.
    • Optimizer: Searches the models’ predictions for set-point changes that would lower the heat rate, and turns them into advice1.
    • Operating constraints: Keep the advice within what the plant can do. One limits any recommended change in superheat temperature to five degrees in a 15-minute interval, a rate operators can achieve. Another stops recommendations for 30 minutes while the plant changes load, until it’s stable again1.
    • Operators: Decide whether to act on each recommendation. When they reject one, their reason goes back to the Vistra and McKinsey team, which adds a new limit1.
    • Plant staff: Explained how the plant worked while the models were built. Operators reviewed the recommendations during development to judge which made sense, what else needed testing, and what advice they’d find most useful1.

    At Coleto Creek, shift supervisor Denese Ray brought a different supervisor to each weekly check-in call with McKinsey, so the team heard from all of the plant’s supervisors1.

    “We were all pretty skeptical of the tool at first, but when we got to play with the heat rate optimizer and see how it worked, and how well McKinsey worked with us in the plant, we understood how it could help.”

    Denese Ray, operations shift supervisor at Vistra’s Coleto Creek power plant1

    At a meeting of Vistra’s leaders to review the optimizer, Lloyd Hughes, an operations manager at the Odessa plant, said: “There are things that took me 20 years to learn about these power plants. This model learned them in an afternoon.”1

    Rollout

    The heat rate insights from Lamar became a solution that Vistra called the Heat Rate Optimizer, which it set out to scale across the fleet2. Wayne Brown, Martin Lake’s operations manager, built and deployed the full optimizer there with his group1. Leadership saw scaling every solution as the only way to reach its efficiency and carbon goals1.

    Figure 1From one coal plant to the fleet
    From one coal plant to the fleetIn October 2020 Vistra deployed the heat rate optimizer at the Martin Lake coal plant. By May 2022 it was on 67 more generating units across 26 plants. By June 2023 a retelling put it on more than 68 units, with each new plant taking two to three weeks. In August 2024 Power Engineering reported the Martin Lake and fleet results.Oct 2020Oct 2020 · Optimizer goes live at Martin Lake · Documented in source [1]Optimizer goes live at Martin LakeMay 2022May 2022 · On 67 more units across 26 plants · Documented in source [1]On 67 more units across 26 plantsJun 2023Jun 2023 · More than 68 units; two to three weeks a plant · Documented in source [2]More than 68 units; twoto three weeks a plantAug 2024Aug 2024 · Power Engineering reports the results · Documented in source [3]Power Engineering reports the resultsFrom one coal plant to the fleetIn October 2020 Vistra deployed the heat rate optimizer at the Martin Lake coal plant. By May 2022 it was on 67 more generating units across 26 plants. By June 2023 a retelling put it on more than 68 units, with each new plant taking two to three weeks. In August 2024 Power Engineering reported the Martin Lake and fleet results.Oct 2020Oct 2020 · Optimizer goes live at Martin Lake · Documented in source [1]Optimizer goeslive at Martin Lake1 yr 7 moMay 2022May 2022 · On 67 more units across 26 plants · Documented in source [1]On 67 more unitsacross 26 plants1 yr 1 moJun 2023Jun 2023 · More than 68 units; two to three weeks a plant · Documented in source [2]More than 68units; two to threeweeks a plant1 yr 2 moAug 2024Aug 2024 · Power Engineering reports the results · Documented in source [3]Power Engineeringreports the results
    • Key milestone
    Sources [1][2][3]
    Within about a year and a half of the Martin Lake start, the optimizer was on 67 more units.

    The first optimizer took 10-12 weeks to build2.

    Technology and architecture

    Figure 2How the heat rate optimizer fits into a plant
    How the heat rate optimizer fits into a plantTwo years of plant data and the outside temperature and humidity feed the heat rate models. A meta-heuristic optimizer searches the models' predictions for better set points and passes them through operating constraints, such as limits on how fast temperatures may change, to recommendations in the operator room every 30 minutes. Control-room operators decide whether to act. Their reasons for rejecting advice go to the Vistra and McKinsey team, which adds new limits. The plant control system that supplies the sensor readings and takes the operators' set-point changes is inferred.sensor readings (data) · Inferred, not documented in the sourcestraining data (data) · Documented in sources [1] [3]external factors (data) · Documented in sources [1] [3]heat rate predictions (data) · Documented in source [1]candidate set points (data) · Documented in source [1]feasible advice (data) · Documented in source [1]every 30 minutes (handoff to people) · Documented in sources [1] [3]set-point changes (trigger or control) · Inferred, not documented in the sourcesrejection reasons (feedback) · Documented in source [1]new limits (feedback) · Documented in source [1]VISTRA PLANTHEAT RATE OPTIMIZERPlant control system · System · Inferred, not documented in the sourcesSYSTEM · INFERREDPlant controlsystemTwo years of plant data · Data · Documented in sources [1] [3]DATATwo yearsof plant dataTemperature and humidity · Data · Documented in sources [1] [3]DATATemperatureand humidityHeat rate models · AI model · Documented in sources [1] [2] [3]AI MODELHeat ratemodelsMeta-heuristic optimizer · AI model · Documented in source [1]AI MODELMeta-heuristicoptimizerOperating constraints · Step · Documented in source [1]OperatingconstraintsOperator-room recommendations · Application · Documented in sources [1] [2]APPLICATIONOperator-roomrecommendationsControl-room operators · Team · Documented in source [1]TEAMControl-roomoperatorsVistra and McKinsey team · Team · Documented in source [1]TEAMVistra andMcKinseyteamsensorreadingstraining dataexternal factorsheat ratepredictionscandidateset pointsfeasible adviceevery 30minutesset-pointchangesrejectionreasonsnew limitsHow the heat rate optimizer fits into a plantTwo years of plant data and the outside temperature and humidity feed the heat rate models. A meta-heuristic optimizer searches the models' predictions for better set points and passes them through operating constraints, such as limits on how fast temperatures may change, to recommendations in the operator room every 30 minutes. Control-room operators decide whether to act. Their reasons for rejecting advice go to the Vistra and McKinsey team, which adds new limits. The plant control system that supplies the sensor readings and takes the operators' set-point changes is inferred.sensor readings (data) · Inferred, not documented in the sourcestraining data (data) · Documented in sources [1] [3]external factors (data) · Documented in sources [1] [3]heat rate predictions (data) · Documented in source [1]candidate set points (data) · Documented in source [1]feasible advice (data) · Documented in source [1]every 30 minutes (handoff to people) · Documented in sources [1] [3]set-point changes (trigger or control) · Inferred, not documented in the sourcesrejection reasons (feedback) · Documented in source [1]new limits (feedback) · Documented in source [1]VISTRA PLANTHEAT RATE OPTIMIZERPlant control system · System · Inferred, not documented in the sourcesSYSTEM · INFERREDPlant control systemTwo years of plant data · Data · Documented in sources [1] [3]DATATwo years of plant dataTemperature and humidity · Data · Documented in sources [1] [3]DATATemperatureand humidityHeat rate models · AI model · Documented in sources [1] [2] [3]AI MODELHeat rate modelsMeta-heuristic optimizer · AI model · Documented in source [1]AI MODELMeta-heuristicoptimizerOperating constraints · Step · Documented in source [1]Operating constraintsOperator-room recommendations · Application · Documented in sources [1] [2]APPLICATIONOperator-roomrecommendationsControl-room operators · Team · Documented in source [1]TEAMControl-room operatorsVistra and McKinsey team · Team · Documented in source [1]TEAMVistra andMcKinsey teamsensor readingstraining dataexternal factorsheat rate predictionscandidate set pointsfeasible adviceevery 30 minutesset-point changesrejection reasonsnew limits
    • AI component
    • Data
    • Trigger or control
    • Handoff to people
    • Feedback
    • Inferred, not documented
    Sources [1][2][3]
    Models predict heat rate, an optimizer proposes set points within the plant's limits, and operators decide what to change.

    The optimizer is a prediction engine wrapped in a search1. The following table lists its parts.

    Layer What they used Role Source
    Predictive model Multilayered neural-network model Predicts heat rate from external conditions and set points 1, 3
    Predictive model Bayesian regression models Used where a simpler model suits the plant’s data and needs 1, 2
    Optimizer Meta-heuristic optimization algorithms Search the predictions for better set points and produce recommendations 1
    Guardrails Operating constraints Keep advice within what the plant can do, and pause it during load changes 1
    Operations console Recommendations in the operator room Deliver set-point advice to operators every 30 minutes 1, 2, 3
    Model deployment Containerized core software package One code base per solution, adapted to each new plant 2

    Models

    The main heat rate model is a multilayered neural network, a type that learns complex nonlinear relationships1. Each network has several layers, each with batch normalization, dropout, and activation1. QuantumBlack’s Ayush Talwar described a range of models fitted to each plant’s needs, from Bayesian regression models to deep learning1. The team chose the model type by weighing the following:

    • Accuracy: How well the model predicts the heat rate1.
    • Explainability: How well the model describes relationships to the operators1.
    • Data: How much data the plant has1.
    • Actionability: How many of the most important inputs people can actually control1.
    • Maintainability: How easy the model will be to maintain1.

    The team added features mainly on domain expertise1.

    Data inputs

    The models use the following data:

    • Plant history: Two years of each plant’s operating data, with external factors such as temperature and humidity and the set points that operators control1, 3.
    • Critical sensors: Sensor data sources that plant staff identified as critical. McKinsey’s engineers added and removed them as variables to see how each change affected the predicted heat rate1.
    • Operator feedback: Operators’ reasons for rejecting recommendations, which became new constraints1.

    Heat rate projects of this kind usually start from high-frequency sensor data in the plant’s distributed control system (DCS)4. Vistra’s optimizer most likely reads its data the same way, and operators enter any change through the plant’s own controls.

    Testing and release

    The models passed the following checks before they became the live engine:

    • Offline scoring: Cross-validation and out-of-sample test sets with time-based splits test each model on later periods than it learned from. The team scored the models on mean absolute percentage error (MAPE) and root mean squared error, and they typically reached a MAPE below 1.5%1.
    • Cold and hot tests: The models were tested offline, as cold tests, and online, as hot tests, with operators and plant experts2.
    • Release gate: Only once the models were accurate to 99% or better and had passed a rigorous set of real-world tests did McKinsey’s machine learning engineers turn them into the live engine1, 3.

    Scaling across plants

    Once a solution proved itself at a pilot site and was approved for scaling, software and machine learning engineers refactored, modularized, and containerized its code2. The result is a single core package for each deployment that can be updated and improved2. A product owner runs the process and owns use and adoption2.

    Dedicated teams adapted the proven models to other plants2. Vistra also hired and trained people and set up machine learning operations (MLOps) infrastructure to keep the effort going2.

    How one recommendation flows through the system

    Figure 3One 30-minute recommendation cycle
    One 30-minute recommendation cycleEvery 30 minutes the plant's current conditions and set points reach the heat rate models, which is inferred. The models pass predicted heat rate to the optimizer, which limits any temperature move to five degrees per 15 minutes and sends set-point recommendations to the operators. During a load change the recommendations stop for 30 minutes. An operator either acts on the advice by adjusting set points, or rejects it and gives the reason to the Vistra and McKinsey team, which adds a new constraint to the optimizer.LOOPevery 30 minutesOPTload change under wayALToperator actselse: operator rejects1. current conditions and set points · Inferred, not documented in the sources1Plant dataHeat rate modelscurrent conditions and set points2. predicted heat rate · Documented in source [1]2Heat rate modelsOptimizer and constraintspredicted heat rate3. cap moves at 5 degrees per 15 minutes · Documented in source [1]3Optimizer and constraintscap moves at 5 degrees per 15 minutes4. set-point recommendations · Documented in sources [1] [3]4Optimizer and constraintsControl-room operatorsset-point recommendations5. recommendations stop for 30 minutes · Documented in source [1]5Optimizer and constraintsControl-room operatorsrecommendations stop for 30 minutes6. adjust set points · Documented in source [1]6Control-room operatorsPlant dataadjust set points7. reason for rejecting · Documented in source [1]7Control-room operatorsVistra and McKinsey teamreason for rejecting8. new constraint · Documented in source [1]8Vistra and McKinsey teamOptimizer and constraintsnew constraintOne 30-minute recommendation cycleEvery 30 minutes the plant's current conditions and set points reach the heat rate models, which is inferred. The models pass predicted heat rate to the optimizer, which limits any temperature move to five degrees per 15 minutes and sends set-point recommendations to the operators. During a load change the recommendations stop for 30 minutes. An operator either acts on the advice by adjusting set points, or rejects it and gives the reason to the Vistra and McKinsey team, which adds a new constraint to the optimizer.LOOPevery 30 minutesOPTload change under wayALToperator actselse: operator rejects1. current conditions and set points · Inferred, not documented in the sources1currentconditionsand set points2. predicted heat rate · Documented in source [1]2predictedheat rate3. cap moves at 5 degrees per 15 minutes · Documented in source [1]3cap moves at5 degrees per15 minutes4. set-point recommendations · Documented in sources [1] [3]4set-pointrecommendations5. recommendations stop for 30 minutes · Documented in source [1]5recommendationsstop for 30 minutes6. adjust set points · Documented in source [1]6adjust set points7. reason for rejecting · Documented in source [1]7reason forrejecting8. new constraint · Documented in source [1]8new constraintPlant data · Data · Documented in sources [1] [3]Plant dataHeat rate models · AI model · Documented in source [1]Heat ratemodelsOptimizer and constraints · AI model · Documented in source [1]OptimizerandconstraintsControl-room operators · Team · Documented in source [1]Control-roomoperatorsVistra and McKinsey team · Team · Documented in source [1]Vistra andMcKinseyteamOne 30-minute recommendation cycleEvery 30 minutes the plant's current conditions and set points reach the heat rate models, which is inferred. The models pass predicted heat rate to the optimizer, which limits any temperature move to five degrees per 15 minutes and sends set-point recommendations to the operators. During a load change the recommendations stop for 30 minutes. An operator either acts on the advice by adjusting set points, or rejects it and gives the reason to the Vistra and McKinsey team, which adds a new constraint to the optimizer.LOOPevery 30 minutesOPTload change under wayALToperator actselse: operator rejects1. current conditions and set points · Inferred, not documented in the sources1current conditionsand set points2. predicted heat rate · Documented in source [1]2predicted heat rate3. cap moves at 5 degrees per 15 minutes · Documented in source [1]3cap moves at5 degrees per15 minutes4. set-point recommendations · Documented in sources [1] [3]4set-pointrecommendations5. recommendations stop for 30 minutes · Documented in source [1]5recommendationsstop for 30 minutes6. adjust set points · Documented in source [1]6adjust set points7. reason for rejecting · Documented in source [1]7reason for rejecting8. new constraint · Documented in source [1]8new constraintPlant data · Data · Documented in sources [1] [3]Plant dataHeat rate models · AI model · Documented in source [1]Heat rate modelsOptimizer and constraints · AI model · Documented in source [1]Optimizer andconstraintsControl-room operators · Team · Documented in source [1]Control-roomoperatorsVistra and McKinsey team · Team · Documented in source [1]Vistra andMcKinsey teamOne 30-minute recommendation cycleEvery 30 minutes the plant's current conditions and set points reach the heat rate models, which is inferred. The models pass predicted heat rate to the optimizer, which limits any temperature move to five degrees per 15 minutes and sends set-point recommendations to the operators. During a load change the recommendations stop for 30 minutes. An operator either acts on the advice by adjusting set points, or rejects it and gives the reason to the Vistra and McKinsey team, which adds a new constraint to the optimizer.LOOPevery 30 minutesOPTload change under wayALToperator actselse: operator rejects1. current conditions and set points · Inferred, not documented in the sources1current conditions and set points2. predicted heat rate · Documented in source [1]2predicted heat rate3. cap moves at 5 degrees per 15 minutes · Documented in source [1]3cap moves at5 degrees per15 minutes4. set-point recommendations · Documented in sources [1] [3]4set-point recommendations5. recommendations stop for 30 minutes · Documented in source [1]5recommendationsstop for 30 minutes6. adjust set points · Documented in source [1]6adjust set points7. reason for rejecting · Documented in source [1]7reason for rejecting8. new constraint · Documented in source [1]8new constraintPlant data · Data · Documented in sources [1] [3]Plant dataHeat rate models · AI model · Documented in source [1]Heat rate modelsOptimizer and constraints · AI model · Documented in source [1]Optimizer andconstraintsControl-room operators · Team · Documented in source [1]Control-roomoperatorsVistra and McKinsey team · Team · Documented in source [1]Vistra andMcKinsey team
    • AI component
    • Data
    • Trigger or control
    • Handoff to people
    • Feedback
    • Inferred, not documented
    Sources [1][3]
    Every 30 minutes the optimizer proposes feasible set points, and operators either act on them or explain why not.

    The constraints trim every recommendation before it reaches an operator, and acting on the advice is where the efficiency gain comes from1. When an operator turns advice down, the reason goes back to the team, which is how both of Coleto Creek’s limits got into the tool1.

    Results

    Martin Lake gave the first figures, and the fleet figures were published in May 20221. The following table lists the results.

    Metric Before After Scope and timeframe Reported by
    Plant efficiency (heat rate) Not disclosed more than 2% better Martin Lake, after three months of operation McKinsey, measured1, 3
    Yearly savings Not disclosed $4.5 million Martin Lake, annualized McKinsey, estimated1, 3
    Carbon abated Not disclosed 340,000 tons Martin Lake McKinsey, estimated1, 3
    Average efficiency Not disclosed 1% better 67 more units across 26 plants, reported May 2022 McKinsey, measured1, 3
    Savings from the rollout Not disclosed more than $23 million Same units, period not stated McKinsey, estimated1, 2

    The results need the following explanations:

    • Plant efficiency: Here, a better efficiency means a lower heat rate1, 3.
    • Comparison with hardware: The 1% fleet gain matches the improvement that takes four to five years of research and development. It came in one-twentieth of the time, with the data and equipment Vistra already had1.
    • Duct burners at Lamar: Analysis showed that duct-burner use could be reduced by approximately 30 percent, equal to about $175,000 a year in fuel and wear and about 4,700 tons of carbon a year1. The 2023 retelling has operators cutting duct-burner use by approximately 30%, for roughly $175,000 a year in fuel savings2.
    • The wider program: Together with Vistra’s other AI initiatives, the heat rate work has helped abate about 1.6 million tons of carbon a year. That program had captured more than $60 million in about a year of work, with more than 400 AI models deployed across the fleet1, 3.

    Lessons learned

    The rollout is the strongest result, because one plant’s tool reached 67 more units within about a year and a half1. One core package per solution and a product owner for adoption point to a design that travels2. The testing also holds up on paper, because time-based splits kept each model from being scored on the period it learned from1.

    The early mistakes were about what the plant could do. At Coleto Creek, operators frequently rejected advice such as a 30-degree rise in superheat temperature within 15 minutes, which the plant couldn’t make1. Shift supervisor Doug Richter called air-flow advice during load changes counterproductive, because the parameters change constantly, which led to the 30-minute pause1. Both fixes encode what operators knew, and heat rate projects generally add ramp-rate limits after training4.

    People were a bigger hurdle than the technology, because leaders and operations managers had to be convinced that AI would work1. Vistra answered with a skeptical first plant manager, weekly supervisor calls at Coleto Creek, and AI and analytics courses with the University of Texas at Dallas, which some 70 employees had completed by May 20221.

    The fleet result was smaller than the first one, about half of Martin Lake’s gain in its first three months1, 3. The closest outside reference is a July 2025 POWER piece by Nimit Patel, an AI and machine learning leader at a North American management consulting firm. It reports average heat rate cuts of 1.5% to 2.5% on more than a dozen coal and combined-cycle units at an unnamed North American utility4.

    Every figure comes from McKinsey, Vistra’s partner on the work1, 2. McKinsey’s case study lists Barry Boswell, the name of the Vistra executive it quotes, in its byline, and WIRED Brand Lab produced the 2023 piece for McKinsey Digital1, 2. Power Engineering repeated the numbers in August 2024 with “McKinsey said” attached3.

    The accounts also differ. The fleet count moved from 67 more units in 2022 to more than 68 in 20231, 2. The Lamar duct-burner cut is a possibility in 2022 and an outcome in 20231, 2. McKinsey puts the optimizer’s start at Martin Lake, while the 2023 piece traces the work to Lamar and places Hughes’s remark at an Odessa digital twin1, 2.

    Case study scorecard

    Build this solution yourself

    Analysis

    What you need

    To build this solution, you need the following in place:

    • Years of clean, timestamped sensor history: Each model was trained on two years of a plant’s data1.
    • Set points that operators can move: The gains come from operators acting on the advice1.
    • Operators willing to argue with the tool: The limits that made its advice usable came from their rejections, gathered week by week1.
    • A fleet product from the first plant: One core package and a product owner brought later plants down to a few weeks each2.

    Reference architecture

    Process optimization and control

    A process optimization and control solution learns from a site's operating data how a physical process responds to its settings and works out better settings as conditions change. A process model predicts how the process responds to live readings, and an optimizer picks the settings that do best within limits that operators set. An operator accepts and enters each recommendation, or the control system carries the settings out while operators watch and can take the process back.

    A check mark shows a building block that this case study's sources document.

    Open the reference architecture

    Others who built it

    • Penn Power installed a neural network-based supervisory control system on Unit 5 of its New Castle station, which cut NOx by 15% in early testing through online set-point adjustments to excess air and pulverizer outlet temperatures5.
    • CESC, an Indian utility, has focused its AI applications on heat rate and auxiliary power optimization, with in-house TensorFlow models that include one tracking boiler efficiency across the economiser, superheater, and reheater6.

    Cite this case study

    Enterprise AI Case Studies. "AI heat rate optimization cuts fuel burn at Vistra's plants." Updated Nov 19, 2026. https://case-studies.ai/case-studies/operational-technology/OT-011-power-plant-heat-rate-optimization-vistra/

    @misc{csai-ot-011,
      author = {{Enterprise AI Case Studies}},
      title = {{AI heat rate optimization cuts fuel burn at Vistra's plants}},
      year = {2026},
      note = {Updated 2026-11-19},
      url = {https://case-studies.ai/case-studies/operational-technology/OT-011-power-plant-heat-rate-optimization-vistra/}
    }

    Sources

    The following reporting, and every passage quoted from it, belongs to its publisher, not to this site. Sources and ownership

    1. Source 1:

      An AI power play: Fueling the next wave of innovation in the energy sector

      Partner or vendorMcKinsey & Company, May 12, 202212 May 2022By Barry Boswell, Sean Buckley, Ben Elliott, Matias Melero, and Micah SmithAccessed Nov 16, 202616 Nov 2026

      Supporting excerpts (54)
      • Barry Boswell Sean Buckley Ben Elliott Matias Melero
      • in October of 2020, that’s exactly what happened. That was when Wayne Brown, the operations manager at the Vistra-owned Martin Lake Power Plant, built and deployed a heat rate optimizer (HRO).
      • Vistra Corp. is the largest competitive power producer in the United States and operates power plants in 12 states with a capacity of more than 39,000 megawatts of electricity
      • Vistra has committed to reducing emissions by 60 percent by 2030 (against a 2010 baseline) and achieving net-zero emissions by 2050.
      • The “heat rate” is a measure of the thermal efficiency of the plant—the amount of fuel required for each unit of electricity produced.
      • plant operators continuously monitor and tune hundreds of variables, or “set points” on things like steam temperatures, pressures, oxygen levels, and fan speeds.
      • It’s a lot for any operator to get right 100 percent of the time—so Vistra thought AI could help.
      • a McKinsey team that included data scientists and machine learning engineers from QuantumBlack AI by McKinsey, to build a multilayered neural-network model
      • This model went through two years’ worth of data at the plant and learned which combination of external factors—such as temperature and humidity—and internal decisions, like set points that operators control, would optimize the algorithm and attain the best heat-rate efficiency at any point in time.
      • identified critical data sources from sensors, which helped McKinsey engineers refine the model, adding and removing variables to see how those changes affected the heat rate.
      • When the models were accurate to 99 percent or higher and run through a rigorous set of real-world tests, a McKinsey team of machine learning engineers converted them into an AI-powered engine. This generated recommendations every 30 minutes for operators to improve the plant’s heat-rate efficiency.
      • Lloyd Hughes, a seasoned operations manager at the company’s Odessa plant, said, “There are things that took me 20 years to learn about these power plants. This model learned them in an afternoon.”
      • At a meeting with all of Vistra’s leaders to review the HRO
      • Acting on the HRO recommendations helped Martin Lake run more than two percent more efficiently after just three months in operation, resulting in $4.5 million per year in savings and 340,000 tons of carbon abated.
      • companies that build gas-fueled power plants invest millions of dollars in research and development over four to five years to achieve a one-percent improvement in power-generation efficiency.
      • Vistra has since rolled the HRO out to another 67 power-generation units across 26 plants, for an average one-percent improvement in efficiency, and more than $23 million in savings.
      • Along with the other AI initiatives, these efforts have helped Vistra abate about 1.6 million tons of carbon per year
      • more than 400 AI models (and counting) deployed across the company’s fleet
      • With more than $60 million captured in about one year of work and another $40 million in progress, Vistra is well on its way to delivering against a roadmap of $250-$300 million in identified EBITDA
      • Vistra hit that improvement level in only one-twentieth the amount of time using the data and equipment it already had.
      • They picked Cade. Not only did he run a top-performing plant in terms of profitability, reliability, and heat rate
      • Answers to that question bubbled over when 50 of Vistra’s top leaders came to a McKinsey-hosted workshop.
      • When he approached Cade about testing out a proof of concept to optimize duct burners, he was intrigued but predictably skeptical.
      • the analysis was clear: overall duct-burner usage could be reduced by approximately 30 percent, which would result in the equivalent of $175,000 of yearly savings on fuel costs and wear and tear on the system
      • in addition to an abatement of about 4,700 tons of carbon per year.
      • when we first trialed the HRO at the Coleto Creek plant, the recommendations were frequently rejected by the operators.
      • the tool recommended increasing superheat temperature by 30 degrees in a 15-minute interval to maximize the heat rate, but it takes the plant longer to heat up, so they rejected the recommendation. We then added a constraint to the tool to keep the increase and decrease to five degrees in a 15-minute interval, which operators could achieve.
      • the parameters are changing constantly, so recommendations to increase air flow at that time were counterproductive.
      • We worked with McKinsey to have the recommendations stop for 30 minutes while we were changing load until the plant was stable again.
      • Denese Ray, operations shift supervisor for Vistra’s Coleto Creek power plant; Doug Richter, the shift supervisor at the same plant
      • We were all pretty skeptical of the tool at first, but when we got to play with the heat rate optimizer and see how it worked, and how well McKinsey worked with us in the plant, we understood how it could help.
      • We really needed all our supervisors and their feedback to build the model so we could get the most from it.
      • the biggest hurdle in the AI journey wasn’t the technology: it was the people.
      • Vistra leadership and operations managers needed to know what AI could do and be convinced it could really work.
      • The issue is that powering duct burners uses more fuel than regular methods
      • Duct burners essentially work like afterburners in jet planes; they provide a surge of energy when needed.
      • Every week, I’d bring in a different supervisor to join us for our check-in calls with McKinsey.
      • As the teams developed the models, plant operators reviewed recommendations to see what made sense, what other variables needed to be tested, and what kinds of recommendations the operators would find most helpful.
      • “If our plant managers aren’t bought in, then things don’t happen,” explained Barry Boswell, Vistra’s executive vice president of power-generation operations.
      • Let’s pick a leader who is knowledgeable and skeptical, because if we can win them over, we can get everyone.
      • “We manage the Vistra fleet as one. If a plant is doing something that works, we want every plant to do it,” says Barry.
      • Vistra’s leadership realized from the beginning that the only way to achieve their efficiency and carbon-abatement aspirations was to scale every solution.
      • “I saw an example of how a metallurgical plant was using AI to help its operators optimize set points and it clicked for me,” remembers Patrick “Cade” Hay, the plant manager for Vistra’s Lamar power plant.
      • QuantumBlack’s Ayush Talwar, an expert associate partner, provides more details on the AI model development
      • We used a range of models to fit the specific needs of the plant and the solution.
      • These ranged from Bayesian regression models to deep-learning models.
      • We wanted to find the right balance between model performance, meaning its accuracy; explainability, which describes relationships to the operators; the source richness, which refers to the amount of data available; potential actionability, or how many of the most important features in the model people can actually control; and maintainability
      • We used a variety of metrics to measure model performance such as the mean absolute percentage error (MAPE) and root mean squared error (RMSE).
      • Our models typically achieved MAPEs of less than 1.5 percent.
      • Each neural network model was made up of several layers with each layer containing batch normalization, dropout, and activation.
      • We created cross validation and out-of-sample testing sets using time-based splits to prevent overfitting models. We added features based primarily on domain expertise.
      • We then wrapped meta-heuristic optimization algorithms around those models to generate recommendations that helped operators make decisions about how to run the plant better. The models were then embedded within the existing production workflows and deployed live in the operator room.
      • Some 70 people have already completed courses
      • Rachit has partnered with the University of Texas at Dallas to offer basic, intermediate, and advanced courses in AI and analytics for Vistra employees.
    2. Source 2:

      AI gives power plants a power-up

      Partner or vendorWIRED Brand Lab for McKinsey Digital, Jun 22, 202322 Jun 2023Accessed Nov 16, 202616 Nov 2026

      Supporting excerpts (18)
      • Hay is the operations manager at the Lamar Power Plant, a 1076-megawatt (MW) natural gas power station in Texas. He also was the first Plant Manager in Vistra Corp’s fleet to explore whether AI could be used to run their plants more efficiently.
      • Cade and his team partnered with McKinsey and decided to first apply AI to optimize Heat Rate
      • The first insight to come out of the AI model was that the Lamar team could reduce the amount of time they run their duct burners.
      • As a result, operators were able to cut duct burner usage by approximately 30%
      • providing roughly $175,000 of annual fuel savings
      • When the analytics team worked with Lloyd to build a digital twin for his power plant in Odessa, Texas, he reflected
      • This commitment led them to turn the heat rate insights into a solution they called the Heat Rate Optimizer (HRO) and scale it across all their fleet.
      • They rolled out the HRO to more than 68 power-generation units across 26 plants, racking up $23 million in savings.
      • It took 10-12 weeks to build the first HRO. Now, rolling the HRO out to each new plant only takes two to three weeks.
      • To date, more than 400 AI models have been deployed across the company’s fleet of power plants
      • These ranged from Bayesian regression models to deep-learning models.
      • They extensively tested and validated models both offline (cold tests) and online (hot tests) with operators and power plant experts
      • Dedicated teams refactored proven models so they could easily be used and adapted to other plants.
      • The models were then embedded within the existing production workflows and deployed live in the operator room.
      • To sustain this effort, they built specific capabilities, including hiring and training talent, and setting up Machine Learning Operations (MLOps) infrastructure.
      • When a solution has proven its value at a pilot site and is approved for scaling, a team of software and machine learning engineers immediately takes over to refactor, modularize, and containerize the code. That way there is a single software ‘core’ package for each deployment that can be updated and improved. A product owner manages the overall process and takes ownership of use and adoption.
      • For their battery storage units, they were able to use analytics to find optimal temperatures for running their batteries.
      • This story was produced by WIRED Brand Lab for McKinsey Digital.
    3. Source 3:

      Coal plant's AI drives down emissions, boosts efficiency

      IndependentPower Engineering, Aug 2, 20242 Aug 2024Accessed Nov 16, 202616 Nov 2026

      Supporting excerpts (8)
      • One of the largest generators in the U.S., Vistra, tapped McKinsey & Company to develop a machine-learning model to improve the efficiency and emissions of the coal-fired Martin Lake Power Plant in Rusk County, Texas.
      • The team fed the model two years of plant data
      • External factors included temperature and humidity, and internal decisions included variables that operators can control.
      • the models eventually made predictions with 99% accuracy or higher
      • After implementing the engine, the plant’s operators received recommendations every 30 minutes on how to improve the plant’s heat-rate efficiency.
      • Martin Lake was running more than 2% more efficiently after three months of operating with the machine-learning tool, which McKinsey said resulted in savings of $4.5 million per year and 340,000 tons of abated carbon.
      • Vistra distributed the AI-enabled HRO to another 67 generation units across 26 plants, which resulted in an average of 1% improvement in efficiency, McKinsey said
      • Overall, Vistra’s AI initiatives have helped the company avoid around 1.6 million tons of carbon per year, McKinsey said.
    4. Source 4:

      Unlocking Power Plant Efficiency: How AI Models Are Revolutionizing Heat Rate Optimization

      IndependentPOWER, Jul 1, 20251 Jul 2025By Nimit PatelAccessed Nov 16, 202616 Nov 2026

      Supporting excerpts (8)
      • Nimit Patel is an AI and machine learning leader at a North American management consulting firm
      • Model development begins with collecting several months or years of high-frequency sensor data from the plant’s distributed control system (DCS).
      • For heat rate optimization, constraints are embedded into the recommendation engine post-model training. These include hard bounds on control settings, such as maximum allowable steam temperature, minimum oxygen levels for safe combustion, or ramp rate limits for load changes.
      • advanced techniques such as SHAP (SHapley Additive exPlanations) are used to interpret the influence of each input feature on the model’s predictions.
      • In some cases, discrepancies revealed by SHAP analysis have also helped identify sensor calibration issues or overlooked inefficiencies in operations.
      • A leading North American utility company, with a diverse portfolio of fossil fuel power plants
      • The company partnered with AI experts to develop and deploy custom heat rate optimization models for more than a dozen coal and CCGT units.
      • On average, plants observed a 1.5% to 2.5% reduction in heat rate, translating into substantial annual fuel savings and lower greenhouse gas emissions.
    5. Source 5:

      Penn Power unit drops NOx while improving heat rate

      IndependentPower Engineering, Mar 1, 19971 Mar 1997Accessed Nov 16, 202616 Nov 2026

      Supporting excerpts (2)
      • A neural network-based supervisory control system for selected combustion parameters was installed at Unit 5 of Penn Power`s New Castle station.
      • Early testing showed a 15 percent reduction in NOx through online setpoint adjustments to excess air and pulverizer outlet temperatures.
    6. Source 6:

      Driving Efficiency: How CESC is digitalising thermal power generation

      IndependentPower Line, Sep 11, 202611 Sep 2026By Balaram SahaAccessed Nov 16, 202616 Nov 2026

      Supporting excerpts (3)
      • CESC has therefore developed an in-house AI-based APC prediction model using the TensorFlow deep learning algorithm.
      • The boiler efficiency model monitors key sections of the boiler, including the economiser, superheater and reheater.
      • The company has therefore focused its AI applications on heat rate and APC optimisation.

    More in Operational Technology