Norfolk Southern's AI portals catch railcar defects
After the East Palestine derailment, Norfolk Southern built trackside camera portals whose in-house deep learning models inspect moving railcars and pass what they find to experts who decide what happens next.
Norfolk SouthernUnited StatesRailScaled since Oct 2023
- Scale
- 10 Digital Train Inspection portals inspecting more than 75% of train traffic on Norfolk Southern lines, as of the 2025 safety report
- Scenario
- Automated railcar inspection at track speed
- Business function
- Field operations and maintenance
- Kind of solution
- Visual inspection and monitoring
- Who built it
- Built with a partner (Georgia Tech Research Institute)
- Human oversight
- Assists people
- Organization
- Enterprise
- AI types
- Computer vision
- Sites
- 10
- Team size
- about a dozen
tl;drAI portals found more than 25,000 railcar defects in 2024 and now inspect over 75% of traffic.See the results
Norfolk Southern inspects its freight cars with trackside camera portals while the trains keep moving1. The Georgia Tech Research Institute engineered the Digital Train Inspection Portals1. The railroad’s own Data Science/AI team built the deep learning algorithms that look for defects in the images1.
The safety plan that the railroad published a month after the February 2023 derailment in East Palestine, Ohio, pledged to speed up the program2. The first portals opened at Leetonia, Ohio, in October 20239. In 2025, three more sites brought the network to 10 portals13. These now inspect more than 75% of the train traffic on Norfolk Southern lines13.
In 2024, the portals found more than 25,000 mechanical defects that the mechanical team had to address4. Of those, 87 needed an immediate stop or a speed reduction4. By January 2026, the portals had also identified and removed from service over 50 wheels with issues since January 202514.
Before the deployment
Norfolk Southern delivers more than 7 million carloads a year across a 22-state network1. Inspectors looked over the cars while they stood still1. Wayside detectors along the track measured bearing heat and sound2. Both checks had limits:
- Detector spacing: In March 2023, the hot bearing detectors averaged 13.9 miles apart on the core network2.
- Acoustic coverage: Five acoustic bearing detectors were in service. They listen to the vibration inside an axle and can find problems that a visual inspection can’t2.
- Stationary inspection: Some defects are difficult to see with the human eye on a stopped car1. Some can only be inspected while a train is moving1.
- Cracked wheels: The cracks typically become visible just before a wheel shatters4. As a result, nobody would expect to see a wheel in its cracked state before it fails4. Broken wheel derailments are among the leading causes of main line accidents11.
On the evening of February 3, 2023, the L1 bearing on the 23rd car of train 32N overheated5. The axle separated, and 38 railcars derailed in East Palestine5. Responders set up a 1-mile evacuation zone that affected about 2,000 residents5.
In Norfolk Southern’s summary of the preliminary findings of the National Transportation Safety Board (NTSB), the wayside hot bearing detectors had been operating as designed2. On March 6, 2023, the railroad announced a six-point safety plan based on those findings2. The plan included the following points:
- About 200 more hot bearing detectors2.
- A pilot of next-generation hot bearing detectors, and a review of the temperature at which an alarm is triggered2.
- An additional 13 acoustic bearing detectors2.
- A faster rollout of Digital Train Inspection on the Premier Corridor, the line between the Midwest and the Northeast that runs through East Palestine2.
What was built
The portals find defects, and people decide what to do about them. Norfolk Southern describes the program as an end-to-end process of hardware, software, and people1. The work is divided as follows:
- Georgia Tech Research Institute (GTRI): Engineered the portal hardware9. The project began in 2021 with about a dozen researchers across four GTRI laboratories9.
- Portals: Each portal is a tunnel over the track with 38 synchronized 24-megapixel cameras1, 9. The cameras sit at angles that catch what a stationary inspection misses1. Under stadium-grade lighting, they take about 1,000 images of each passing car for a 360-degree view1, 9.
- Deep Learning algorithms: The railroad’s Data Science/AI and Mechanical teams wrote the software and the algorithms11. Each algorithm looks for a specific condition11. The set grew from 38 at the October 2023 launch to approximately 40 by April 2024 and 75 by July 20251, 10, 11.
- Wayside health desk: Experts at the Network Operations Center review the critical findings and act on them11. They follow what the railroad calls a robust response protocol, which sorts findings by severity10, 11.
- Crews and car inspectors: For a Tier 1 condition, the desk tells the crew to bring the train to a safe stop and inspect the car on the ground11. On an inbound inspection, car inspectors can home in on the conditions that the portal identified, which they might otherwise have overlooked11. They judge whether each is legitimate and needs attention11.
John Fleps, the vice president and chief safety officer, puts 99% of the conditions that the AI finds at a very low level11. Those conditions can wait until the car is next on a repair-in-place (RIP) track11. Fleps describes the aim as “taking the finders and making them fixers”11.
“The AI augments—not replaces—human inspectors. The portals detect defects that are difficult or impossible to see during stationary inspections, while our railroaders provide the critical judgment and hands-on expertise to access, validate and address issues.”
Rollout
The phases took the program from a safety pledge to a network of portals at heavily trafficked locations1, 11. On November 24, 2025, the railroad also switched on a standalone Wheel Integrity System at Burns Harbor, Indiana14. The system builds on the portals but zeroes in on wheels, where the portals scan entire trains12, 14.
Technology and architecture
The following table lists the parts of the solution, from the cameras to the crew’s app1, 11.
| Layer | What they used | Role | Source |
|---|---|---|---|
| Solution platform | Digital Train Inspection Portals | Trackside tunnels that image railcars as trains pass at track speed | 1, 9, 11 |
| Cameras and imaging | 24-megapixel trackside cameras | 38 synchronized cameras per portal, about 1,000 images per car for a 360-degree view | 1, 9 |
| Cameras and imaging | Stadium lighting | Lights the cars inside the portal | 1, 9 |
| Vision model | Deep Learning algorithms | In-house models, one per condition, that analyze the images in real time | 1, 11 |
| Messaging and notifications | Automated notifications | Near real-time alerts on flagged equipment, for focused inspection and repair | 4, 10 |
| Mobile or field app | Crew mobile app | Sends images of a flagged condition from the ballast line to the wayside desk | 11 |
The models work from the portal images1. The portals capture petabytes of images each month11. The models analyze them within minutes of a train’s passage9.
The algorithms send critical findings to the wayside health desk11. Data from the portals and the railroad’s other field technologies also feeds the mechanical war rooms, which are staffed with craft employees, managers, and senior executives12.
How one critical defect flows through the system
A Tier 1 finding passes through the whole chain, from the camera to the crew and back11. The crew sends its images from the ballast line through an app, which avoids the headaches of email or text messaging11.
Results
The following table lists the defect and wheel counts for the portals4, 14.
| Metric | Before | After | Scope and timeframe | Reported by |
|---|---|---|---|---|
| Mechanical defects found that required work by the mechanical team | Not disclosed | more than 25,000 | All portals in operation, calendar year 2024 | Norfolk Southern, measured, via Automation World and Railway Age4, 11 |
| Defects needing an immediate stop and repair or a speed reduction | Not disclosed | 87 | Subset of the 2024 defects, RoboGeorgia Summit 2025 | Norfolk Southern, measured, via Automation World4 |
| Tier 1 critical defects handled in near real time | Not disclosed | 85 | Subset of the 2024 defects, Railway Age, July 2025 | Norfolk Southern, measured, via Railway Age11 |
| Wheels with issues identified and removed from service | Not disclosed | over 50 | All portals, since January 2025, as of January 2026 | Norfolk Southern, measured14 |
The metrics and the wider safety figures mean the following:
- Severe defects: At the RoboGeorgia Summit 2025, Mabby Amouie counted the 2024 defects that needed an immediate stop and repair or a speed reduction4. The Tier 1 count comes from a Railway Age interview that was published in July 202511.
- Cracked wheel: Early in 2025, a portal made what Amouie called the “first-ever autonomous detection of a hairline crack in a wheel”11. The car was taken out of service before it could cause an incident11. At the summit, Amouie called it “the first ever cracked wheel detected in the industry”4.
- Wheel issues: By November 2025, the portals had flagged more than 40 wheel integrity issues that could have led to derailments12. That count starts in early 202512.
- Accident and injury rates: Portal use played a role in a main line accident rate that fell 63% from 2022 to 202411. The injury rate fell more than 10% year over year, and Fleps called the portals “an important piece” of that, but “not the only reason”11.
- Earlier accident figures: The number of mainline accidents dropped 30% in 20233. The mainline accident rate declined 38% that year6.
- Wayside stops: In 2025, the Mechanical War Room program counted a 31.1% reduction in wayside stops while it inspected 4.2% more axles13. The program draws on the portals among other tools, and it counted a 4.5% reduction in railcar bad orders13.
Lessons learned
The program grew from one site to a network and kept its operating model9, 13. The models raise alerts, experts triage them by severity, and a crew validates a Tier 1 condition on the ground11. Catching problems earlier in the failure cycle lets the railroad repair cars in a shop instead of out on the line in the middle of the night11.
The rollout ran behind its first plan of over a dozen portals by the end of 20241. By June 2024, three had launched, and the goal had moved to 20 systems by the end of 20263. Other plans named six sites by the end of 202410, and later 17 sites for 20 portals with about 90% coverage over the next several years11.
The portals can’t yet do a complete inbound train inspection, which is Fleps’s stated aim11. Car inspectors still inspect trains, and every critical finding still passes through the wayside health desk and a crew inspection on the ground11. The program’s reach therefore depends on staff as well as on cameras.
The Association of American Railroads says that portals of this kind aren’t yet trained to assess all types of defects11. The association adds that high installation and operating costs limit their deployment, so manual inspections still play an important role11. Fleps adds that the Federal Railroad Administration (FRA) inspection rules were written long before machine vision, and he wants them discussed the way automated track inspection is11.
The accounts don’t always agree. The two counts of severe defects in 2024 don’t match4, 11, and the train speed is up to 70 mph in the company’s releases1 but 60 mph in the summit account4. The summit write-up groups the first cracked wheel with the 2024 results, while Railway Age places it early in 20254, 11. The two wheel counts measure different things over different periods12, 14.
The figures are Norfolk Southern’s own, relayed by Automation World and Railway Age or published by the railroad and GTRI, its development partner4, 9, 11, 13. The company calls its algorithms very accurate with very low false positives1. The accident and injury figures cover the whole railroad and many other safety measures, so they don’t isolate what the portals did3, 11. By June 2024, those measures included 187 of a planned 259 hot bearing detector systems3.
Case study scorecard
- more than 25,000 mechanical defects found that required work by the mechanical team4, 11
- 87 defects severe enough to need an immediate train stop and repair or a speed reduction4
- 85 Tier 1 critical defects handled in near real time11
- over 50 wheels with issues identified and removed from service14
- Source quality: 73%, High quality. Rests on a news report.
Sources by publication date
- Organization 7
- Vendors and partners 2
- Press, academic, and regulators 5
- 2 undated
Build this solution yourself
Analysis
What you need
To build this solution, you need the following in place:
- Heavy traffic at each portal site: Norfolk Southern put its portals at heavily trafficked locations1, 11. At Leetonia, a train passes about every hour1.
- A partner for imaging at track speed: GTRI engineered the portal hardware, and the railroad’s own teams built the software and the models9.
- A staffed desk with a severity protocol: The wayside health desk reviews every critical alert and decides on a stop, because the models don’t act on the train themselves11.
- Crews and repair tracks that act on findings: Crews inspect a car on the ground and report back by app11. Repair-in-place tracks take the low-level findings11.
Reference architecture
Visual inspection and monitoring
A visual inspection and monitoring solution uses a vision model to read images from cameras and find or measure defects, objects, events, or conditions that people or systems then act on. The vision model reads each image, and rules send each detection to a line controller, a business system, or a person. People confirm or correct the findings and tune the process from the measurements, and their verdicts and newly labeled images keep the model current.
- Cameras and imaging (documented in this case study)
- Field network
- Device or line-side computer
- Privacy masking
- Vision model (documented in this case study)
- Inspection platform (documented in this case study)
- Thresholds and routing rules
- Risk or priority model
- Line or equipment controller
- Business or operational system
- Alert console
- Review screen
- Notifications (documented in this case study)
- Image and results store
- Verdict capture
- Model training environment
A check mark shows a building block that this case study's sources document.
Open the reference architectureOthers who built it
- CN runs seven automated train inspection portals from Duos Technologies on its core routes11. Qualified railcar mechanics on its alert team decide whether each defect is fixed at once or waits for the next inspection point11.
- Deutsche Bahn evaluates vehicles at DB Long Distance, DB Regio, and DB Cargo with automated image analysis as trains pass under a camera bridge7. This cuts ICE roof inspections from several hours to a few minutes7.
- Hitachi Rail mounts cameras atop trains to spot degrading overhead power lines8. Its applications run on data from 8,000 train cars on 2,000 trains8.
In the library
- Renault scales AI visual inspection to 500 checks per plant Renault Group
- AI return audits catch item swaps at Happy Returns Happy Returns
- Walmart tracks pallets with Wiliot IoT sensors and AI Walmart
- Van de Velde sizes bras from two smartphone photos with AI Van de Velde
- Synthetic boards train Siemens' inspection AI at Erlangen Siemens
- AI progress monitoring cuts rework on Intel's fab builds Intel
Cite this case study
Enterprise AI Case Studies. "Norfolk Southern's AI portals catch railcar defects." Updated Nov 19, 2026. https://case-studies.ai/case-studies/operational-technology/OT-006-railway-predictive-maintenance/
@misc{csai-ot-006,
author = {{Enterprise AI Case Studies}},
title = {{Norfolk Southern's AI portals catch railcar defects}},
year = {2026},
note = {Updated 2026-11-19},
url = {https://case-studies.ai/case-studies/operational-technology/OT-006-railway-predictive-maintenance/}
}Sources
The following reporting, and every passage quoted from it, belongs to its publisher, not to this site. Sources and ownership
- Source 1:
Norfolk Southern launches AI train inspection technology
Supporting excerpts (18)
Norfolk Southern Corporation (NYSE: NSC) is deploying Digital Train Inspection Portals to enhance rail safety across the company's 22-state network.
developed in partnership with the Georgia Tech Research Institution (GTRI), who engineered the hardware, and Norfolk Southern's Data Science/Artificial Intelligence (AI) and Mechanical teams, who built the brains behind the program.
with over a dozen portals to be deployed by the end of 2024
This end-to-end process includes hardware, software, and people.
the Digital Train Inspection Portals are equipped with an array of 24-megapixel trackside cameras and stadium lighting.
captures ultra-high-resolution, 360-degree images of passing railcars.
The cameras are synced to the microsecond, taking 1,000 images per rail car on average as they pass through the tunnel at speeds up to 70 miles per hour.
The high-speed cameras are strategically placed at angles to capture things that are difficult to detect with the human eye during stationary inspections.
capturing images while the train is in a dynamic state provides an inspection for various defects that cannot be done while the train is stationary.
AI analyzes these images for potential defects.
Norfolk Southern's in-house Data Science/AI team has developed 38 advanced Deep Learning algorithms and already deployed them across heavily trafficked lanes.
These best-in-class, field-proven algorithms have demonstrated very high accuracy levels, while having very low false-positives.
The AI transmits the information to Norfolk Southern's Network Operations Center where the data is reviewed by subject-matter experts to identify and address issues to proactively ensure the safety of rail operations.
Critical defects found are flagged for immediate handling.
The first portal was deployed in Leetonia, Ohio, where trains pass through approximately every hour.
Its dedicated team members deliver more than 7 million carloads annually
These new portals combine advanced technology with human expertise, giving our people and the public further confidence in Norfolk Southern's safe operations.
said Norfolk Southern President and CEO Alan H. Shaw.
- Source 2:
Norfolk Southern announces six-point safety plan
Supporting excerpts (13)
announced Monday a six-point plan to immediately enhance the safety of its operations.
The initiatives are based on the preliminary findings of the National Transportation Safety Board (NTSB) following the East Palestine, Ohio, derailment.
Norfolk Southern is evaluating the distance between hot bearing detectors, which currently averages 13.9 miles on its core network.
The company anticipates adding approximately 200 hot bearing detectors to its network
Pilot next-generation hot bearing detectors.
In addition to reevaluating the temperature threshold at which an alarm is triggered
These detectors analyze the acoustic signature of vibration inside the axle and can identify potential problems that a visual inspection could not.
Norfolk Southern will add 13 new detectors to the five already in service
Accelerate our Digital Train Inspection program.
uses machine vision and algorithms powered by artificial intelligence to identify defects and needed repairs much more effectively than traditional human inspection.
improving its ability to detect, diagnose, and repair defects before they become issues.
The company is accelerating the installation of the next phase of this new technology on its Premier Corridor, which connects the Midwest and Northeast and is the line that runs through East Palestine.
the NTSB reported that wayside hot bearing detectors were operating as designed.
- Source 3:
Midyear report: Norfolk Southern advancing safety
Supporting excerpts (4)
Launching three digital train inspection portals featuring machine learning vision inspection technology, with a goal of having 20 systems operational by the end of 2026
Installing 187 out of a planned 259 hot bearing detector systems
Deploying 17 new acoustic bearing detectors
Reducing the number of mainline accidents by 30% in 2023
- Source 4:
Norfolk Southern Shows How AI-Powered Vision Systems Are Revolutionizing Industrial Inspection
Supporting excerpts (12)
Norfolk Southern's AI-powered Digital Train Inspection portals detected more than 25,000 mechanical defects in 2024, including 87 severe issues requiring immediate action and the industry's first-ever detection of a cracked wheel.
The system captures 1,000 images per train car using 38 ultra high-resolution cameras while trains pass through at 60 mph
I heard about while attending the RoboGeorgia Summit 2025 at the Georgia Tech Research Institute
Mabby Amouie, assistant vice president of enterprise data and analytics at Norfolk Southern
in 2024 the inspection portals found more than 25,000 mechanical defects that required addressing by Norfolk Southern’s mechanical team
that required an immediate train stop and repair or speed reduction for the train to reach the next stop safely.
the first ever cracked wheel detected in the industry.
the visual appearance of these cracks typically occur just before a wheel shatters
cracked wheels are not something that would ever be seen in the cracked state before the wheel’s failure.
the AI algorithms in the software developed for the portals can issue automated notifications in near real-time
Norfolk Southern also has a team of people viewing the images highlighted by the system who are trained in specific response protocols to advise on the need for train stops, slowdowns and maintenance calls.
Broken yoke found on a train car with the aid of the Digital Train Inspection portal.
- Source 5:
Norfolk Southern Railway Derailment and Hazardous Materials Release
Supporting excerpts (5)
On February 3, 2023, about 8:54 p.m.
eastbound Norfolk Southern Railway (NS) train 32N derailed 38 mixed freight railcars
in East Palestine, Ohio
Emergency responders established a 1-mile evacuation zone that affected about 2,000 residents.
the probable cause of the derailment involving Norfolk Southern Railway train 32N was the failure of the L1 bearing on the 23rd railcar in the consist that overheated and caused the axle to separate
- Source 6:
Norfolk Southern Safety Enhancements Align with NTSB East Palestine Final Recommendations
Supporting excerpts (2)
Norfolk Southern's mainline accident rate declined 38% last year to industry leading levels.
Developing and deploying Digital Train Inspection Portals, using ultra-high-resolution cameras and machine vision
- Source 7:
Supporting excerpts (3)
cameras at DB Long Distance, DB Regio and DB Cargo will be used to evaluate vehicles with the help of automated image analysis
The images are taken while the train passes under a camera bridge.
cuts the times for physically elaborate tasks such as ICE roof inspections from several hours to just a few minutes
- Source 8:
High-Speed AI: Hitachi Rail Advances Real-Time Railway Analysis Using NVIDIA Technology
Supporting excerpts (2)
which are currently running on data from 8,000 train cars on 2,000 trains
By mounting cameras atop trains, Hitachi Rail can monitor power lines overhead to identify degrading electric cables and help prevent disruptive failures.
- Source 9:
Norfolk Southern, GTRI Unveil Georgia’s First Digital Train Inspection Portal
Supporting excerpts (10)
unveiled a new digital train inspection portal near Jackson, Georgia, marking the culmination of a three-year collaboration.
In October, the company opened two train portals on adjacent tracks in Leetonia, Ohio, with plans to expand to as many as a dozen by the end of 2024.
The digital train inspection portals use machine vision technology equipped with 38 high-resolution cameras strategically placed to capture comprehensive images of key components on all sides of passing train cars.
These images are generated and analyzed by Norfolk Southern-developed AI algorithms within minutes of a train’s passage, enabling rapid identification and reporting of any issues detected.
Powerful stadium-grade lighting enables the cameras to take approximately a thousand photographs of each moving rail car
The project began in 2021 and involved about a dozen researchers across four GTRI laboratories.
This is the area where we collaborated with our partners at GTRI, the true imaging experts in the field,
said Mabby Amouie, Norfolk Southern’s chief data scientist, at the event.
We really get a 360-degree view of the equipment and thousands of images that give us a snapshot of everything on that car as it goes through,
Norfolk Southern Vice President of Safety John Fleps said at the media event.
- Source 10:
Supporting excerpts (6)
deployed its second Digital Train Inspection Portal (DTI) in Jackson, Ga., on its Atlanta South District Subdivision, where approximately 19 trains pass through daily.
Guided by a robust response protocol, subject-matter experts then identify and address issues to proactively ensure the safety of rail operations,
has developed approximately 40 advanced Deep Learning algorithms and already deployed them across heavily trafficked lanes.
We plan to roll out an additional 20 algorithms by year’s end.
The portal currently has 36 active algorithms that are populating automated alerts on equipment for focused inspection and repair.
The railroad plans to have a total of six DTI Portal sites in operation by the end of 2024, and an additional 11 portal sites will be operational by 2026.
- Source 11:
Next-Level Safety and Efficiency
Supporting excerpts (44)
today a total of seven operate at six heavily trafficked locations (one double-track location has two portals)
which engineered the hardware, and NS’s Data Science/AI and Mechanical teams, which produced the software and advanced the AI algorithms.
The synchronized cameras net approximately 1,000 images per car at speeds up to 70 mph
The data captured—petabytes each month—is processed in real time by our AI models,
NS AVP Enterprise Data and Analytics Mabby Amouie tells Railway Age.
Critical findings are transmitted to our Network Operations Center, where a team of experts review and act on them.
The experts at the wayside health desk are guided by what the railroad calls
99% of the conditions found by AI are “very low level” and can be repaired the next time the car is on a RIP (repair in place) track
NS Vice President and Chief Safety Officer John Fleps
If it’s a severity Level 1 or Tier 1 condition, the wayside health desk team will tell the crew to bring their train to a safe stop and perform an on-the-ground inspection.
The crew has mobile devices with an app designed to send images straight from the ballast line to the wayside desk without having to deal with the headaches of email or text messaging.
The condition will be validated, and then we’ll follow our standard operating procedures on what to do.
It may necessitate walking the car to a safe set-out location. It may be a condition that warrants a reduced speed, and the car can be set out at the next forward mechanical location.
may be able to go to the next location where it’s going to be switched, and we’ll set it out there for scheduled repair.
in-house Data Science/AI team has developed 75
algorithms that look for specific conditions and analyze images in real time.
As broken wheel derailments are among the leading causes of main line accidents, the railroad continues to improve upon its algorithm for the detection of cracked and defective wheels.
we identified and handled more than 25,000 mechanical maintenance-related defects, including 85 Tier 1 critical defects in near real time,
The railroad earlier this year reached a milestone with the
first-ever autonomous detection of a hairline crack in a wheel—a defect that’s extremely difficult to identify in real-world conditions,
This early detection allowed us to remove the car from service before it could cause an incident
Portal use has played a role in improving NS’s main line accident rate.
63% in two years—from 2022 to 2024,
allowing railcars to be repaired proactively in a controlled environment
when they’re able to make a repair in a shop instead of in the middle of the night
reduce its injury rate more than 10% year over year
This is not the only reason
but it’s an important piece.
This is all about taking the finders and making them fixers.
conditions identified by the portal that they may have otherwise overlooked and validate whether or not a condition is legitimate and needs attention
Our approach is hybrid,
The AI augments—not replaces—human inspectors. The portals detect defects that are difficult or impossible to see during stationary inspections, while our railroaders provide the critical judgment and hands-on expertise to access, validate and address issues.
This technology has advanced light years since the regulations were written,
could change the way the FRA’s existing manual or visible inspection rules are set up.
just like the conversation that’s going on right now around automated track inspection, the same conversation needs to be had
goal is to have each railcar on its network pass through a portal site every 1,000 miles
The railroad expects to achieve about 90% coverage over the next several years.
17 total sites identified, and part of our plan right now, which will constitute 20 individual portals,
We want to continue to build out our algorithm set. Ideally, we
able to do a complete inbound train inspection with the portal.
However, these systems are not yet trained to assess all types of defects, and their high installation and operational costs limit widespread deployment. As such, traditional manual inspections still play an important role.
the Association of American Railroads says.
Seven automated train inspection portals from Duos Technologies have been placed strategically on the railroad
The team members—qualified railcar mechanics—decide whether the defect should be addressed immediately or if the car can continue to the next inspection point
- Source 12:
Norfolk Southern, Georgia Tech develop AI-powered wheel defect detector
Supporting excerpts (7)
Since early 2025, these portals have flagged more than 40 wheel integrity issues that could have led to derailments.
We positively identified over 40 wheel integrity defects
Chief Operating Officer John Orr said on the railroad’s earnings call in October.
NS installed its eighth Digital Train Inspection portal in the third quarter.
The data from these field technologies feed our war rooms that are staffed with craft employees, managers, and senior executives, facilitating real time problem-solving and cross-functional collaboration.
The first wheel integrity detector was installed recently on the Chicago Line at Burns Harbor, Ind.
The technology builds on NS’s homebuilt Digital Train Inspection portals
- Source 13:
Supporting excerpts (8)
Digital Train Inspection (DTI) portals to 10,
including 3 additional sites stood up in 2025.
More than 75% of all train traffic operating on Norfolk Southern lines is now inspected by portal
Expanding deployment of machine vision capabilities for a total
31.1% reduction in wayside stops while also inspecting 4.2% more axles.
4.5% reduction in railcar bad orders.
honorable mention in the Artificial Intelligence Design category, a first for the railroad industry.
2025 Innovation by Design Awards
- Source 14:
Introducing the Wheel Integrity System: NS’ latest safety revolution
Supporting excerpts (3)
The first system went live Nov. 24 at Burns Harbor, Ind., a strategic site near Chicago for freight transport.
The new standalone system was built upon the success of the existing Digital Train Inspection (DTI) portals, which have already identified and removed from service over 50 wheels with issues since January 2025.
Unlike the NS DTI portals, which scan entire trains, the new system zeroes in on wheels