Choose your region

    Lists show the case studies of your region first. Browse and search still hold every case study.

    Europe
    North America

    South Eastern Railway's AI train cameras catch rail hotspots

    South Eastern Railway, which joins Southeastern and Network Rail's Kent Route, fits AI thermal cameras to its passenger trains so engineers find overheating rail equipment before it fails.

    South Eastern RailwayUnited Kingdom (South-East London, Kent and parts of East Sussex)RailScaled since 2025
    Scale
    32 trains: 12 Class 707 and 20 Class 375
    Scenario
    Train-borne thermal inspection of rail infrastructure
    Business function
    Field operations and maintenance
    Who built it
    Vendor product (One Big Circle)
    Where it runs
    Vendor-hosted service
    Human oversight
    Assists people
    Organization
    Public sector
    AI types
    Machine learning, Computer vision
    People served
    up to 500,000
    Contract value
    £593,465 excluding VAT

    Sources and their publishers

    This case study draws on reporting by the following publishers. Enterprise AI Case Studies combined these accounts and added its own explanation. The reporting, and every passage quoted from it, belongs to whoever published or supplied it.

    1. South Eastern Railway

    2. Network Rail

    3. One Big Circle

    4. Find a Tender

    5. Rail Technology Magazine

    6. Railway-News

    7. LNER

    tl;drPilot cameras flagged 41 overheating incidents and prevented over 9,000 minutes of delays.See the results

    View the solutionBuild this solution yourself

    South Eastern Railway uses AI thermal cameras on its passenger trains to find overheating rail equipment before it fails1. The cameras and the AIVR Platform that analyzes their footage come from One Big Circle1, 3.

    South Eastern Railway brings the publicly owned operator Southeastern and Network Rail Kent Route under a single leadership team1. Its pilot on Class 707 trains in 2025 led to a permanent fit on 32 trains across South-East London, Kent and parts of East Sussex1.

    The pilot identified 41 overheating incidents and prevented over 9,000 minutes of delays for customers1. In April 2026, Network Rail named the cameras among the AI already deployed on Britain’s railway, as the industry launched its first joint AI action plan2.

    Before the deployment

    Before the cameras, Network Rail inspected the route all year round with inspection trains, helicopters and handheld thermal imaging systems1. Southeastern drivers also reported issues such as a rough ride or overhanging vegetation1.

    South Eastern Railway jointly manages 540 miles of track, with nearly 1,700 train services and up to 500,000 customer journeys a day1. The old approach had the following limits on that network:

    • Coverage: The number of inspection trains available and the area they could cover limited what was seen1.
    • Speed: Faults could only be acted on as fast as someone reported them, and detection was delayed1, 3.
    • Safety: Inspection teams faced safety risks while working trackside3.

    What was built

    The solution turns passenger trains in normal service into mobile inspection platforms1. Cameras on the front of each train record thermal and visible footage, and machine learning flags the hot spots for engineers to review3.

    The work is divided as follows:

    • Train-borne cameras: A thermal camera captures thermographic imagery of the railway. A visible camera records HD video of the track and the lineside3.
    • Hotspot detection model: Machine learning identifies thermal anomalies, maps each one to its network location and categorizes it by risk level3.
    • AIVR Platform: Sends email alerts to maintenance teams and shows thermal and visible footage side by side, so engineers inspect from their laptops3.
    • Asset engineers: Review the data and decide whether an issue needs repairs. They also work out the equipment and staff a repair needs, without a site visit1.

    “Our integrated railway is using train-borne cameras to provide the early warnings we need to identify and fix problems before they cause disruption for our customers.”

    Dan Paris, Fleet Maintenance Director at South Eastern Railway1

    Rollout

    The program moved from a pilot to a permanent fit in the following phases:

    • Pilot, 2025: Thermal cameras went on the front of 12 Class 707 “City Beam” trains on London Metro routes1, 7.
    • Expansion, October 2025: South Eastern Railway added 20 Class 375 “Electrostar” Main Line trains to cover a wider area across East Sussex and Kent. Five of them also get underbody cameras for track slipperiness and the conductor rail1.
    • Contract, October 2025: SE Trains Limited published a direct award to One Big Circle Limited of £593,465 excluding VAT, running from 10 November 2025 to 31 October 20265.
    • Installation, April 2026: Network Rail said the technology was being installed across 32 trains2.
    • Kent coverage, October 2026: One Big Circle said all Class 375 trains on Network Rail’s Kent route carry its thermal and forward-facing visible cameras4.
    Figure 1From a Metro pilot to Main Line coverage
    From a Metro pilot to Main Line coverageSouth Eastern Railway was formed in June 2025 and ran a pilot on Class 707 trains in 2025. In October 2025 it announced cameras on 32 trains. In April 2026 Network Rail named the cameras among AI already deployed in rail, and in October 2026 One Big Circle said all Class 375 trains on the Kent route were equipped.20252025 · Pilot on Class 707 trains · Documented in sources [1] [7]Pilot on Class 707 trains18 Jun 202518 Jun 2025 · South Eastern Railway formed · Documented in source [1]South Eastern Railway formed27 Oct 202527 Oct 2025 · Expansion to 32 trains announced · Documented in source [1]Expansion to 32 trains announced29 Apr 202629 Apr 2026 · Named in AI in Rail Action Plan launch · Documented in source [2]Named in AI in Rail Action Plan launch15 Oct 202615 Oct 2026 · All Kent Class 375 trains equipped · Documented in source [4]All Kent Class 375 trains equippedFrom a Metro pilot to Main Line coverageSouth Eastern Railway was formed in June 2025 and ran a pilot on Class 707 trains in 2025. In October 2025 it announced cameras on 32 trains. In April 2026 Network Rail named the cameras among AI already deployed in rail, and in October 2026 One Big Circle said all Class 375 trains on the Kent route were equipped.20252025 · Pilot on Class 707 trains · Documented in sources [1] [7]Pilot on Class707 trains18 Jun 202518 Jun 2025 · South Eastern Railway formed · Documented in source [1]South EasternRailway formed4 mo27 Oct 202527 Oct 2025 · Expansion to 32 trains announced · Documented in source [1]Expansion to 32trains announced6 mo29 Apr 202629 Apr 2026 · Named in AI in Rail Action Plan launch · Documented in source [2]Named in AI in RailAction Plan launch6 mo15 Oct 202615 Oct 2026 · All Kent Class 375 trains equipped · Documented in source [4]All Kent Class 375trains equipped
    • Key milestone
    Sources [1][2][4][7]
    South Eastern Railway went from a Metro pilot to cameras across its Kent Main Line fleet.

    Technology and architecture

    Figure 2How train-borne cameras reach the asset engineers
    How train-borne cameras reach the asset engineersOn each in-service train, a front thermal camera and a forward-facing HD camera send footage over 4G/5G to One Big Circle's cloud. There, a hotspot detection model finds thermal anomalies and passes mapped hotspots to the AIVR Platform. The model emails alerts by risk level, and the platform shows thermal and visible footage to asset engineers. The engineers decide on repairs and send a repair crew with the right equipment. No part is inferred.thermal imagery, 4G/5G (data) · Documented in source [3]HD video, 4G/5G (data) · Documented in source [3]mapped hotspots (data) · Documented in source [3]email alert by risk (handoff to people) · Documented in source [3]side-by-side footage (handoff to people) · Documented in source [3]repair, equipment, staff (handoff to people) · Documented in source [1]IN-SERVICE TRAINSONE BIG CIRCLE CLOUDSOUTH EASTERN RAILWAYFront thermal camera · Device · Documented in sources [1] [3]DEVICEFront thermalcameraForward-facing HD camera · Device · Documented in source [3]DEVICEForward-facingHD cameraHotspot detection model · AI model · Documented in source [3]AI MODELHotspotdetectionmodelAIVR Platform · Application · Documented in sources [3] [4]APPLICATIONAIVR PlatformAsset engineers · Team · Documented in source [1]TEAMAssetengineersRepair crew · Team · Documented in source [1]TEAMRepair crewthermalimagery, 4G/5GHD video,4G/5Gmappedhotspotsemail alertby riskside-by-sidefootagerepair,equipment,staffHow train-borne cameras reach the asset engineersOn each in-service train, a front thermal camera and a forward-facing HD camera send footage over 4G/5G to One Big Circle's cloud. There, a hotspot detection model finds thermal anomalies and passes mapped hotspots to the AIVR Platform. The model emails alerts by risk level, and the platform shows thermal and visible footage to asset engineers. The engineers decide on repairs and send a repair crew with the right equipment. No part is inferred.thermal imagery, 4G/5G (data) · Documented in source [3]HD video, 4G/5G (data) · Documented in source [3]mapped hotspots (data) · Documented in source [3]email alert by risk (handoff to people) · Documented in source [3]side-by-side footage (handoff to people) · Documented in source [3]repair, equipment, staff (handoff to people) · Documented in source [1]IN-SERVICE TRAINSONE BIG CIRCLE CLOUDSOUTH EASTERN RAILWAYFront thermal camera · Device · Documented in sources [1] [3]DEVICEFront thermal cameraForward-facing HD camera · Device · Documented in source [3]DEVICEForward-facingHD cameraHotspot detection model · AI model · Documented in source [3]AI MODELHotspotdetection modelAIVR Platform · Application · Documented in sources [3] [4]APPLICATIONAIVR PlatformAsset engineers · Team · Documented in source [1]TEAMAsset engineersRepair crew · Team · Documented in source [1]TEAMRepair crewthermal imagery, 4G/5GHD video, 4G/5Gmapped hotspotsemail alert by riskside-by-side footagerepair, equipment, staff
    • AI component
    • Data
    • Handoff to people
    Sources [1][3][4]
    Machine learning flags and ranks the hotspots, and asset engineers decide what gets repaired.

    The solution has three layers: cameras on the trains, a cloud platform that analyzes the footage, and people who decide on repairs1, 3. The following table lists its components.

    Layer What they used Role Source
    Anomaly detection model AIVR thermal hotspot detection Finds thermal anomalies, maps them and ranks them by risk level 3, 6, 10
    Cameras and imaging AIVR Thermal cameras Capture thermographic imagery from the front of the train 1, 3, 5
    Cameras and imaging AIVR FFV cameras Record HD video of the track and lineside for context 3
    Industrial and field connectivity 4G/5G transmission Sends the footage to the cloud in near-real time 3
    Solution platform AIVR Platform Hosts footage and detections for remote inspection 3
    Review workbench AIVR Intel Lists hotspots with temperatures and priority settings 4
    Messaging and notifications Email alerts Send each hotspot to maintenance teams by risk level 3
    Machines, robots and vehicles Class 707 and Class 375 trains Carry the cameras over Metro and Main Line routes 1, 3

    The hotspot models are One Big Circle’s own. The company trains them on footage, thermal imagery and line-scanning data from AIVR devices across the network10. In thermal video, they track temperature exceedances on electrified infrastructure over time and classify their severity to trigger alerts10.

    Data inputs

    The solution uses the following data:

    • Thermal imagery: Captured from the front of each train on its normal runs, and the main input to hotspot detection3.
    • HD forward-facing video: Gives the context to assess the cause and severity of each thermal anomaly3.
    • Network locations: Each hotspot and asset is mapped to a precise network location3.
    • Earlier sessions: Runs over the same stretch are compared to triangulate frequent hotspots, and repeat observations show whether an issue is worsening4, 10.

    Integrations

    The solution connects to the following systems:

    • Train-borne camera units: Footage moves over 4G/5G to the cloud platform. Dynamic demand management sends only quality video, and onboard devices pool their data3.
    • Maintenance teams’ email: Each detected hotspot arrives as an email alert, categorized by risk level3.
    • Network Rail maintenance planning: Data goes to Network Rail and other stakeholders for coordinated maintenance3.

    Before installation, One Big Circle manufactured bespoke enclosures and calibrated them with full factory testing3.

    How one hotspot flows through the system

    The following steps trace one hotspot on the Kent route, from capture to repair:

    1. A Class 375 train runs its normal service with thermal and forward-facing cameras on the front4.
    2. The footage reaches the AIVR Platform over 4G/5G in near-real time3.
    3. The hotspot detection model finds a temperature exceedance and maps it to its location on the line3.
    4. The model ranks the hotspot by risk. A high-risk issue goes to maintenance teams as an email alert, and a lower-risk issue is monitored over time3.
    5. AIVR Intel lists the hotspot with its temperature and priority. Engineers compare sessions over the same spot and use the HD video to see what causes it4.
    6. On examination, an engineer classifies hotspot 94331 as a Third Rail Joint, with a highest reading of 88°C4.
    7. The asset engineers decide whether it needs repairs and which equipment and staff the work needs1.

    Results

    The pilot in 2025 produced the two published figures. Both cover the Class 707 trains on London Metro routes1, 3.

    Metric Before After Scope and timeframe Reported by
    Overheating incidents identified Not disclosed 41 overheating incidents Class 707 pilot, 2025 South Eastern Railway, pilot1, 2, 6
    Customer delay minutes prevented Not disclosed over 9,000 minutes Class 707 pilot, 2025 South Eastern Railway, pilot1, 2, 7

    The figures measure the following:

    • Overheating incidents identified: Overheating hot spots on the railway that the pilot cameras spotted on Metro routes in 20251.
    • Customer delay minutes prevented: Minutes of customer delays that the pilot prevented, as stated in the release1.
    • Change in the work: Routine monitoring moved from a site visit to a desktop review, and the cameras went from a pilot to 32 trains2, 3.

    Lessons learned

    The pilot became a permanent program. One Big Circle says the permanent fit gave wider coverage, more reliable data capture and consistent footage from regular service patterns3. South Eastern Railway describes itself as the first to permanently install on-board cameras on this scale1.

    The design keeps people on the repair decision. The model finds and ranks hotspots, and asset engineers review each one and decide what to repair1, 3. Engineers also classify the cause on examination, such as a cable, an insulator or a third rail joint4.

    The pilot figures differ between accounts. South Eastern Railway and Network Rail give 41 overheating incidents and over 9,000 minutes of delays prevented1, 2. One Big Circle’s September 2026 account gives 37 instances of overheating rail infrastructure and over 8,000 delay minutes for the pilot phase3.

    The fleets are also named differently. The procurement notice covers cameras and upgrades for the “CL 707 and 395 fleets”, while the announcements name the Class 707 and Class 375 trains5, 1.

    The pilot figures are South Eastern Railway’s own, and the trade press printed them from its release1, 6, 7. The claim that the system is particularly effective at preventing conductor rail faults is One Big Circle’s3.

    Case study scorecard

    • 41 overheating incidents Overheating incidents identified by the pilot cameras1, 2, 6PilotRelayed
    • over 9,000 minutes Customer delay minutes prevented in the pilot1, 2, 7PilotRelayed

    Build this solution yourself

    Analysis

    What you need

    To build this solution, you need the following in place:

    • Trains that run the routes every day: The coverage comes from regular service patterns, so you need a fleet whose diagrams cover the lines you want watched3.
    • Mobile data along the route: Footage reaches the platform over 4G/5G in near-real time, which lets engineers act on a hotspot before it fails3.
    • Engineers who own the repair decision: The model flags and ranks hotspots, but asset engineers decide on repairs and plan the crew and equipment1.

    Reference architecture

    Visual inspection and monitoring

    A visual inspection and monitoring solution uses a vision model to read images from cameras and find or measure defects, objects, events, or conditions that people or systems then act on. The vision model reads each image, and rules send each detection to a line controller, a business system, or a person. People confirm or correct the findings and tune the process from the measurements, and their verdicts and newly labeled images keep the model current.

    A check mark shows a building block that this case study's sources document.

    Open the reference architecture

    Others who built it

    • South Western Railway and Network Rail: A year-long trial fits a front thermal camera and an underbody camera to one train, with One Big Circle among the partners8.
    • LNER, Network Rail, Hitachi Rail and CrossTech: A forward-facing camera in an Azuma cab uses AI to spot infrastructure hazards along the East Coast Main Line9.

    Cite this case study

    Enterprise AI Case Studies. "South Eastern Railway's AI train cameras catch rail hotspots." Updated Nov 18, 2026. https://case-studies.ai/case-studies/operational-technology/OT-020-train-thermal-hotspots-south-eastern-railway/

    @misc{csai-ot-020,
      author = {{Enterprise AI Case Studies}},
      title = {{South Eastern Railway's AI train cameras catch rail hotspots}},
      year = {2026},
      note = {Updated 2026-11-18},
      url = {https://case-studies.ai/case-studies/operational-technology/OT-020-train-thermal-hotspots-south-eastern-railway/}
    }

    Sources

    The following reporting, and every passage quoted from it, belongs to its publisher, not to this site. Sources and ownership

    1. Source 1:

      Bringing track and train together: innovative on-board camera programme expanded to spot issues before they cause delays

      OrganizationSouth Eastern Railway, Oct 27, 202527 Oct 2025Accessed Nov 18, 202618 Nov 2026

      Supporting excerpts (21)
      • Major investment by the integrated South Eastern Railway to fit on-board monitoring cameras onto 32 trains.
      • Initial pilot programme identified 41 overheating incidents and prevented over 9,000 minutes of delays for customers.
      • Earlier this year, a pilot programme installed thermal imaging cameras on the front of a small number of Class 707
      • The technology is provided by AIVR tech company One Big Circle and is now being expanded to include 20 Class 375
      • alongside the 12 Class 707
      • South Eastern Railway is the first to permanently install on-board cameras on this scale.
      • A pioneering programme that has turned passenger trains into mobile inspection platforms is to be expanded to more routes and trains across South-East London, Kent and parts of East Sussex.
      • on the rail network and relay this information rapidly to asset engineers
      • They can then review the data and make an informed decision as to whether the issue needs repairs, which helps to resolve issues before they can cause disruption to customer journeys.
      • The technology can also assess the condition of the railway to determine what equipment is required for repairs and the staff needed to carry out the work, without the need for physical visits to the location.
      • Our integrated railway is using train-borne cameras to provide the early warnings we need to identify and fix problems before they cause disruption for our customers.
      • The cameras on the City Beams are monitoring our London Metro routes and now with a new set of cameras being added to 20 of our Class 375 trains we can look out for any issues on a much wider area across East Sussex and Kent.
      • The can-do spirit and collaboration of all involved has ensured faster, more effective outcomes that will bring real benefits to passengers and staff across the network.
      • Five of the 20 Class 375 trains in the programme will also be fitted with cameras underneath the body of the train.
      • These cameras will monitor how slippery the track is as well as the condition of the
      • South Eastern Railway jointly manages 540 miles of track across Kent, East Sussex and South-East London, providing nearly 1,700 train services and up to 500,000 customer journeys per day.
      • Network Rail carry out inspections of the route all year round (with trains, helicopters and handheld thermal imaging systems) with the aim of spotting issues before they impact services or need more substantial fixes.
      • In addition, Southeastern drivers can also report potential issues, such as a rough ride or overhanging vegetation.
      • The effectiveness of this approach is limited by the number of trains available, the size of area that can be covered and the speed in which potential faults can be reported and actioned.
      • South Eastern Railway was formally stood up on 18th June 2025 and brings the publicly owned train operator, Southeastern and infrastructure provider, Network Rail Kent Route, under a single leadership team.
      • South Eastern Railway is a contractual arrangement between Southeastern and Network Rail.
    2. Source 2:

      Railway sets course for AI on journey to Great British Railways

      OrganizationNetwork Rail, Apr 29, 202629 Apr 2026Accessed Nov 18, 202618 Nov 2026

      Supporting excerpts (6)
      • as the sector launches its first-ever joint AI action plan
      • the Artificial Intelligence in Rail Action Plan has been developed following extensive cross-sector collaboration led by GBRX
      • Examples of AI already being deployed and not within the plan:
      • South Eastern Railway has trialled train-borne AI monitoring cameras designed to identify faults and infrastructure issues before they cause disruption.
      • Following a successful pilot, the technology is now being installed across 32 trains.
      • Early results identified 41 overheating incidents and helped prevent more than 9,000 minutes of customer delays.
    3. Source 3:

      Thermal and Forward-Facing Cameras on In-Service Trains Enabling Predictive Infrastructure Maintenance

      Partner or vendorOne Big Circle, Sep 28, 202628 Sep 2026By One Big CircleAccessed Nov 18, 202618 Nov 2026

      Supporting excerpts (23)
      • Traditional railway infrastructure monitoring relied heavily on manual track inspections, periodic helicopter surveys, and handheld thermal imaging systems.
      • This approach had several limitations: limited coverage across the 540-mile network, delayed fault detection, and safety risks for inspection teams working trackside.
      • One Big Circle worked with South Eastern Railway and Network Rail to design and install two complementary camera systems.
      • Thermal cameras capture thermographic imagery to identify overheating assets and potential failures before they occur.
      • The thermal detection system automatically alerts users to temperature exceedances, providing precise network locations of high-risk thermal issues for proactive intervention.
      • Lower-risk issues can be monitored over time to track developing conditions.
      • Visible cameras record HD video of the track and lineside environment, providing contextual imagery for assessing detected thermal anomalies and enabling comprehensive infrastructure inspection and monitoring.
      • This capability transfers routine infrastructure monitoring from a physical site visit into a desktop review activity.
      • The permanent deployment proved advantageous with enhanced coverage across the network, improved reliability of data capture, and consistent frequency of footage from regular service patterns.
      • The installations included bespoke enclosures manufactured and calibrated with full factory testing before installation and commissioning on each train.
      • is automatically transmitted via 4G/5G from the trains to AIVR’s cloud based platform in near-real time
      • The system employs dynamic demand management to ensure optimal bandwidth usage and transmission of only quality video, with intelligent data pooling between onboard devices to maximise efficiency.
      • For Network Rail, all footage is made accessible online through the AIVR Platform, where users can perform comprehensive inspections from their laptops without needing to visit sites
      • Automated hotspot detection: Machine learning algorithms automatically identify thermal anomalies and send email alerts to maintenance teams, categorising issues by risk level
      • Side by side video comparison: View thermal and visible footage simultaneously to assess the context and severity of detected issues
      • Geographic mapping: All hotspots and assets are mapped to precise network locations with historical tracking to monitor condition evolution
      • Automated data sharing: Seamless provision of data to Network rail and other stakeholders for coordinated maintenance activities
      • This comprehensive system has proven particularly effective at preventing conductor rail faults by predictively identifying components at risk of failure.
      • Following a successful pilot programme last year, South Eastern Railway invested in expanding the technology across their fleet.
      • 12 Class 707 City Beam trains fitted with AIVR FFV and AIVR Thermal cameras covering London Metro Routes
      • 20 Class 375 Electrostar trains equipped with forward-facing and thermal cameras for Main line routes across East Sussex and Kent
      • 5 of the Class 375 trains fitted with additional AIVR Focus systems underneath the body of the train for remote inspection of the conductor rail and adhesion monitoring
      • During the pilot phase alone, 37 instances of overheating rail infrastructure were detected, and over 8,000 delay minutes were prevented.
    4. Source 4:

      Autumn Roundup: New Features ahead of the Changing Weather

      Partner or vendorOne Big Circle, Oct 15, 202615 Oct 2026By One Big CircleAccessed Nov 18, 202618 Nov 2026

      Supporting excerpts (7)
      • All Class 375 trains on Network Rail’s Kent route are equipped with AIVR’s thermal and forward facing visible cameras
      • allowing hotspots on the line to be identified and classified for treatment
      • These sessions can then be compared in order to triangulate frequent hotspots, complete with temperature detections, and FFV footage then acts as a visual supplement to determine what exactly is causing these hotspots and precisely where they lie in the ballast.
      • Hotspots can be classified for reference, with common causes including cables, insulators and TRJs (Third Rail Joints), allowing preemptive maintenance to take place before voltage spikes or breakages cause issues across the line.
      • Screenshot of AIVR Intel showing a list of thermal conductor rail hotspots with temperatures and priority settings
      • a thermal image of hotspot 94331 classified as a Third Rail Joint with a highest reading of 88°C
      • A thermal hotspot that has been recognised by AIVR, then classified as a Third Rail Joint upon examination.
    5. Source 5:

      Thermal imaging cameras and upgrades to existing equipment.

      RegulatoryFind a Tender, Oct 27, 202527 Oct 2025FilingAccessed Nov 18, 202618 Nov 2026

      Supporting excerpts (7)
      • Thermal imaging cameras and upgrades to existing equipment fitted on CL 707 and 395 fleets.
      • One Big Circle Limited
      • £593,465 excluding VAT
      • 10 November 2025 to 31 October 2026
      • Statutory instrument allowing direct award
      • Email: procurement@southeasternrailway.co.uk
      • 2024/2025 - The Procurement Act 2023
    6. Source 6:

      Southeastern Expands AI-Powered Train Monitoring to Boost Network Performance

      IndependentRail Technology Magazine, Oct 29, 202529 Oct 2025Accessed Nov 18, 202618 Nov 2026

      Supporting excerpts (2)
      • 41 overheating incidents were identified early, preventing over 9,000 minutes of passenger delays.
      • on the network and transmit data directly to asset engineers, who can assess whether repairs are needed.
    7. Source 7:

      South Eastern Railway to Expand Thermal Imaging Trial

      IndependentRailway-News, Oct 28, 202528 Oct 2025By Joey StoateAccessed Nov 18, 202618 Nov 2026

      Supporting excerpts (2)
      • First introduced on a set of 12 Class 707
      • with tests thus far successfully having spotted 41 overheating incidents and prevented more than 9,000 minutes worth of delays to customers.
    8. Source 8:

      'Hotshot' thermal imaging cameras to help prevent delays on South Western Railway

      OrganizationNetwork Rail, Nov 17, 202517 Nov 2025Accessed Nov 18, 202618 Nov 2026

      Supporting excerpts (3)
      • South Western Railway and Network Rail collaboration sees innovative year-long trial of thermal imaging cameras to help prevent delays
      • Two cameras have been fitted to the train: a thermal imaging camera at the front to monitor the tracks for electrical issues; and a camera underneath to monitor the shoe gear and the third rail, that provide power for the train.
      • The project is a collaboration between SWR and Network Rail with industry partners Angel Trains, One Big Circle, Siemens and dg8 Design.
    9. Source 9:

      LNER's Azuma in high-tech AI trial

      OrganizationLNER, Jul 15, 202415 Jul 2024Accessed Nov 18, 202618 Nov 2026

      Supporting excerpts (2)
      • LNER, Network Rail, Hitachi Rail and CrossTech are trialling the use of Artificial Intelligence (AI) technology to identify potential infrastructure issues along the East Coast Main Line.
      • highlighting potential hazards such as any damage, overhanging trees, subsidence or obstacles on the track
    10. Source 10:

      How Machine Learning Is Changing the Way We Inspect the Railway

      Product documentationOne Big Circle, Sep 24, 202624 Sep 2026By One Big CircleAccessed Nov 18, 202618 Nov 2026

      Supporting excerpts (3)
      • Our models also extend further, into thermal video where they track temperature exceedances on electrified infrastructure over time, mapping them geographically and classifying severity to trigger automated alerts before an issue becomes a failure.
      • Historical tracking matches repeat hot spot observations at the same location, to identify if the issue is changing or worsening and what levels of intervention are required.
      • Our in-house teams train models directly on the millions of miles of footage, thermal imagery and line-scanning data AIVR captures, meaning every new detection capability is built on real operating conditions.

    More in Operational Technology

    View all