    Dutch rail operator NS put Camlin Rail's TrainVue camera portals on ProRail's tracks, where an image recognition model checks the pantographs and bogies of passing trains for defects.

    Nederlandse SpoorwegenNetherlandsRailIn production since 2024
    Scale
    10 TrainVue systems in the national rollout
    Scenario
    Automated railcar inspection at track speed
    Business function
    Field operations and maintenance
    Who built it
    Built with a partner (Camlin Rail, CAF Digital Services, Arcadis, and ProRail)
    Organization
    Enterprise, 10,000 to 99,999 employees
    AI types
    Computer vision
    Sites
    10

    Sources and their publishers

    This case study draws on reporting by the following publishers. Enterprise AI Case Studies combined these accounts and added its own explanation. The reporting, and every passage quoted from it, belongs to whoever published or supplied it.

    1. Camlin Group

    2. Railway Technology

    3. Europe's Rail Joint Undertaking

    4. NS

    5. KickstartAI

    6. Norfolk Southern

    tl;drTrackside cameras let NS inspect its trains by day and repair them at night.See the results

    View the solutionBuild this solution yourself

    Nederlandse Spoorwegen (NS), the main passenger rail operator in the Netherlands, inspects its trains with camera portals beside the track2. The portals photograph the pantographs and bogies of passing trains, and an image recognition model checks the images for defects6.

    NS built the system with Camlin Rail, CAF Digital Services, Arcadis and the infrastructure manager ProRail1, 3. The portals replace inspections that stopped each train every 48 hours1.

    In May 2026, NS’s director of data, innovation and AI described the gantries as recently installed and in use6. The portals let NS inspect its trains during the day and do the corrective maintenance at night1.

    Before the deployment

    NS trains undergo daily inspections at a service location and go to a maintenance site every three months5. The inspection of pantographs and wheels had the following problems:

    • Inspection stops: Trains were stopped for inspection every 48 hours1.
    • Manual checks: Engineers walked along all the wheelsets at night with a torch6.
    • Damage: NS wanted to register pantograph and wheel defects in time, to avoid damage to the trains and the infrastructure, such as overhead line breaks3.
    • Staff: A third of NS employees are 55 or over, and some 6,000 will retire in the next 10 years5.

    NS lists camera inspection of rolling stock and the use of AI among its measures to reduce the demand for labor5.

    What was built

    Camera portals on the main line photograph each passing train, so that NS can inspect the fleet without stopping it1, 6. The work is divided as follows:

    • TrainVue portals: Capture high-resolution 3D and 2D images of the pantograph and bogies as a train passes1. The national rollout covers 10 systems1.
    • LeadMind platform: Integrates with TrainVue and provides the bogie and pantograph images1.
    • Image recognition model: Checks the images for defects in the wheelsets and pantographs6.
    • NS staff: Use the images for both automatic and manual inspection during the day, and carry out corrective maintenance at night1.
    • ProRail: Owns the track where the portals stand. NS is the first train operator in Europe to install inspection equipment on an infrastructure owner’s property1.

    “Those engineers suddenly have to trust an algorithm over their own visual inspection. That is quite a leap of faith.”

    Daan Debie, director of data, innovation and AI at NS6

    Rollout

    NS and ProRail first set up two pilot locations, among them Hogebrug on the Rotterdam-Utrecht route3. The pilot validated the first two systems, and the national rollout of ten followed1.

    Figure 1From vendor selection to portals in use
    From vendor selection to portals in useNS selected CAF Digital Services for the project, with Camlin Rail's TrainVue system, in 2021. In September 2024, the national rollout of 10 TrainVue systems began after a pilot of two. By May 2026, an image recognition model checked the images from the recently installed gantries.20212021 · CAF and TrainVue selected for the project · Documented in source [1]CAF and TrainVue selected for the projectSep 2024Sep 2024 · National rollout of 10 TrainVue systems · Documented in source [1]National rollout of 10 TrainVue systemsMay 2026May 2026 · Image recognition checks portal images · Documented in source [6]Image recognition checks portal imagesFrom vendor selection to portals in useNS selected CAF Digital Services for the project, with Camlin Rail's TrainVue system, in 2021. In September 2024, the national rollout of 10 TrainVue systems began after a pilot of two. By May 2026, an image recognition model checked the images from the recently installed gantries.20212021 · CAF and TrainVue selected for the project · Documented in source [1]CAF and TrainVueselected for the project4 yrsSep 2024Sep 2024 · National rollout of 10 TrainVue systems · Documented in source [1]National rollout of 10TrainVue systems1 yr 8 moMay 2026May 2026 · Image recognition checks portal images · Documented in source [6]Image recognitionchecks portal images
    • Key milestone
    Sources [1][6]
    NS started the national rollout after the pilot, and by May 2026 a model checked the portal images.

    Technology and architecture

    Figure 2How NS inspects trains from trackside camera portals
    How NS inspects trains from trackside camera portalsA passing NS train runs through a Camlin Rail TrainVue portal on ProRail's track. The portal captures 3D and 2D images of the pantograph and bogies and sends them to CAF Digital Services' LeadMind platform. LeadMind provides the images to NS staff for manual inspection. An image recognition model checks the images for defects and passes its findings to NS staff and engineers. The link from LeadMind to the model is inferred.passes at speed (data) · Documented in source [6]3D and 2D images (data) · Documented in source [1]images (data) · Inferred, not documented in the sourcesimages for manual inspection (data) · Documented in source [1]defect findings (handoff to people) · Documented in source [6]PRORAIL TRACKCAF DIGITAL SERVICESNS MAINTENANCEPassing train · Device · Documented in source [6]DEVICEPassing trainTrainVue portal · Device · Documented in source [1]DEVICETrainVueportalLeadMind platform · System · Documented in source [1]SYSTEMLeadMindplatformImage recognition model · AI model · Documented in source [6]AI MODELImagerecognitionmodelNS staff and engineers · Team · Documented in sources [1] [6]TEAMNS staff andengineerspassesat speed3D and 2Dimagesimagesimages formanualinspectiondefect findingsHow NS inspects trains from trackside camera portalsA passing NS train runs through a Camlin Rail TrainVue portal on ProRail's track. The portal captures 3D and 2D images of the pantograph and bogies and sends them to CAF Digital Services' LeadMind platform. LeadMind provides the images to NS staff for manual inspection. An image recognition model checks the images for defects and passes its findings to NS staff and engineers. The link from LeadMind to the model is inferred.passes at speed (data) · Documented in source [6]3D and 2D images (data) · Documented in source [1]images (data) · Inferred, not documented in the sourcesimages for manual inspection (data) · Documented in source [1]defect findings (handoff to people) · Documented in source [6]PRORAIL TRACKCAF DIGITAL SERVICESNS MAINTENANCEPassing train · Device · Documented in source [6]DEVICEPassing trainTrainVue portal · Device · Documented in source [1]DEVICETrainVue portalLeadMind platform · System · Documented in source [1]SYSTEMLeadMind platformImage recognition model · AI model · Documented in source [6]AI MODELImage recognitionmodelNS staff and engineers · Team · Documented in sources [1] [6]TEAMNS staff and engineerspasses at speed3D and 2D imagesimagesimages formanual inspectiondefect findings
    • AI component
    • Data
    • Handoff to people
    • Inferred, not documented
    Sources [1][6]
    A portal images each passing train, and a model and NS staff check the images for defects.

    The portal hardware comes from Camlin Rail, and the LeadMind platform from CAF1. The following table lists the components of the solution.

    Layer What they used Role Source
    Vision model Image recognition model Checks the images for defects in the wheelsets and pantographs 6
    Cameras and imaging Camlin Rail TrainVue Captures 3D and 2D images of the pantograph and bogies of each passing train 1, 2
    Data platform and storage CAF Digital Services LeadMind Integrates with TrainVue and provides the bogie and pantograph images 1, 2

    Data inputs

    Each portal produces high-resolution 3D and 2D images of the pantograph and bogies1. At the Hogebrug pilot, area-scan cameras recorded the pantographs and line-scan cameras recorded the bogies of passenger trains3. NS and ProRail share what they learn about image recognition algorithms that detect this damage automatically3.

    Portal design

    The portals had to fit ProRail’s track at each site without spoiling the images. The design work had the following steps:

    1. NS developed a generic default model of the portal structure in BIM with Arcadis, CAF and Camlin Rail1.
    2. A 3D scan of each site let the team fit the default model to the real track1.
    3. The model verified focal lengths, lighting and view angles, so that no structural element affects image quality1.

    How one train flows through the system

    1. The train passes a portal at line speed. The gantry photographs it without stopping it6.
    2. TrainVue captures high-resolution 3D and 2D images of the pantograph and bogies1.
    3. LeadMind receives the images and provides them for inspection1.
    4. The image recognition model checks the images for defects in the wheelsets and pantographs6.
    5. NS staff inspect the results during the day. Engineers carry out the corrective maintenance at night1.

    Results

    The portals changed when NS inspects and repairs its trains. The documented changes are the following:

    • Inspection timing: The portals let NS digitalize the 48-hour inspections of its fleet. NS can inspect during the day and do the corrective maintenance at night1.
    • Coverage: The national rollout of 10 TrainVue systems followed a pilot of two1. In 2024, NS was installing two additional camera portals for pantographs and wheelsets4.
    • Use in 2026: In May 2026, an image recognition model checked the images from the recently installed gantries6. The 2025 annual report states that cameras along the tracks give NS additional information about the condition of its trains5.
    • Staffing: NS counts camera inspection and AI among its measures to reduce the demand for labor. It expects to see their effect from 2026 onward5.

    Lessons learned

    The pilot gave NS a tested basis for the national rollout. The first two systems were commissioned, installed and validated before the rollout of ten began1.

    Placing operator equipment on another party’s track took site-by-site design. The 3D model helped both NS and ProRail implement the portals on the Dutch network1. NS also reports increasing evidence that algorithms and AI models help with image quality and the recognition of parts4.

    The harder change is in the maintenance teams. Debie says that an AI product whose adoption isn’t managed stalls, and the money spent on it is lost6. He recommends involving users from the early stages of building6.

    Ownership has to move from the central data team to the business. Debie says a business unit must take ownership, free up budget and be accountable once a system runs6.

    NS’s project manager calls the daytime inspection a first step that enables more optimization of maintenance1. The account of the portals comes from Camlin Rail’s announcement, which Railway Technology reported, and from NS’s own reports and its director’s interview1, 2, 5, 6.

    Case study scorecard

    Build this solution yourself

    Analysis

    What you need

    To build this solution, you need the following in place:

    • Space on the track for the portals: NS placed its portals on ProRail’s property, so you need the infrastructure manager’s agreement before you build1.
    • A portal design that fixes the camera geometry: The 3D model verified focal lengths, lighting and view angles for each site, because the images are only as good as the camera’s view1.
    • A night maintenance window: The gain comes from inspecting by day and repairing at night, so you need engineers and depot time at night1.
    • A business unit that owns the system: Debie says the business, not the central team, must fund and answer for a system once it runs6.

    Reference architecture

    Visual inspection and monitoring

    A visual inspection and monitoring solution uses a vision model to read images from cameras and find or measure defects, objects, events, or conditions that people or systems then act on. The vision model reads each image, and rules send each detection to a line controller, a business system, or a person. People confirm or correct the findings and tune the process from the measurements, and their verdicts and newly labeled images keep the model current.

    A check mark shows a building block that this case study's sources document.

    Open the reference architecture

    Others who built it

    • Norfolk Southern: Deploys Digital Train Inspection Portals whose machine vision captures 360-degree images of passing railcars across its 22-state network7.
    • ProRail: Tested video gates in the ports of Moerdijk and Botlek, one of which recognizes and measures the thickness of freight wagon brake pads3.

    Cite this case study

    Enterprise AI Case Studies. "NS uses AI camera portals to inspect pantographs and bogies." Updated Nov 20, 2026. https://case-studies.ai/case-studies/operational-technology/OT-025-pantograph-bogie-inspection-portals-ns/

    @misc{csai-ot-025,
      author = {{Enterprise AI Case Studies}},
      title = {{NS uses AI camera portals to inspect pantographs and bogies}},
      year = {2026},
      note = {Updated 2026-11-20},
      url = {https://case-studies.ai/case-studies/operational-technology/OT-025-pantograph-bogie-inspection-portals-ns/}
    }

    Sources

    The following reporting, and every passage quoted from it, belongs to its publisher, not to this site. Sources and ownership

    1. Source 1:

      National Roll out of Train Inspection Solution in The Netherlands

      Partner or vendorCamlin Group, Sep 17, 202417 Sep 2024Accessed Nov 20, 202620 Nov 2026

      Supporting excerpts (15)
      • CAF was selected in 2021 by NS to participate in a unique project in the railway industry with state-of-the-art technologies, comprising its leading digital platform, LeadMind, as well as Camlin Rail’s TrainVue in-service inspection system.
      • The system will be deployed across ten strategic locations along the mainline serviced by NS, creating a nationwide network.
      • NS, collaborated with Arcadis, CAF and Camlin Rail to develop a generic ‘default model’ of the civil structure portal structure using BIM.
      • Under the contract CAF Digital Services’ LeadMind platform will seamlessly integrate with Camlin’s TrainVue to provide bogie and pantograph images
      • The deployment includes the installation of 10 TrainVue systems in total, capturing high-resolution 3D and 2D images of pantograph and bogie
      • The National Roll out is now underway and follows the successful delivery of a pilot project in which the first two systems were commissioned, installed and validated initially, in collaboration between NS, Camlin Rail, CAF and Arcadis.
      • to acquire high resolution images for both automatic and manual inspection of the NS fleet
      • the first time in Europe where a train operator (NS) has installed train inspection equipment (TrainVue) on an infrastructure owner’s (ProRail) property
      • Leveraging Camlin Rail’s expertise and hardware combined with CAF’s LeadMind platform
      • site integration, gathered through a 3D scan, made it possible to integrate the default model and optimize it into the real world
      • the model enabled us to verify focal lengths, lighting and view angles ensuring no structural elements will impact image quality
      • Highly accurate visualizations aided both NS and the network owner (ProRail) in implementing this application in the Dutch railway network
      • in which the frequency of stopping trains for inspection was 48 hours
      • With the TrainVue system and the Leadmind platform NS is able to digitalize 48-hour inspections to the fleet, which allows for optimization of the maintenance execution, since NS is able to perform the inspections during the day and perform corrective maintenance during the night.
      • this shift in inspection time is an enabler for more optimization in the maintenance process, thus the inspection system of CAF/Camlin Rail is a first step with more to follow.
    2. Source 2:

      Dutch rail provider NS renews fleet inspections

      IndependentRailway Technology, Sep 16, 202416 Sep 2024By Patrick Rhys AtackAccessed Nov 20, 202620 Nov 2026

      Supporting excerpts (3)
      • Nederlandse Spoorwegen (NS), the main passenger rail operator in the Netherlands
      • Under the contract CAF Digital Services’ LeadMind platform will seamlessly integrate with Camlin’s TrainVue to provide bogie and pantograph images
      • The deployment includes the installation of 10 TrainVue systems in total, capturing high-resolution 3D and 2D images of pantograph and bogie
    3. Source 3:

      Europe's Rail visits wayside monitoring systems in the Netherlands

      Partner or vendorEurope's Rail Joint Undertaking, Jan 10, 202410 Jan 2024By Bente Yedema and Paul KootwijkDocumentAccessed Nov 20, 202620 Nov 2026

      Supporting excerpts (9)
      • In addition, ProRail and NS have set up two pilot locations with IVGs for detecting damage to pantographs and bogies.
      • NS is preparing the national rollout in 2024 together with ProRail, where 8 more IVGs will be placed at different locations along the Dutch railways.
      • At the location of Hogebrug (Rotterdam-Utrecht route), a pilot location has been set up by NS and ProRail with IVGs for making image recordings of the pantographs (NS and ProRail) and for making image recordings of the bogies of passenger trains (NS).
      • The pantograph cameras are area-scan cameras and the cameras for the bogies are line scan cameras.
      • The aim of the pilot is to register defects in pantographs and train wheels in time, in order to avoid damage to the infrastructure and trains.
      • preventing overhead line breaks
      • NS and ProRail share knowledge within the field of the development of image recognition algorithms that can automatically detect these damages.
      • ProRail has tested IVGs in the ports of Moerdijk and Botlek and is now preparing for a further rollout in the ports.
      • An IVG for recognizing and measuring the thicknesses of brake pads of freight wagons
    4. Source 4:

      Innovations, NS Annual Report 2024

      OrganizationNS, Mar 4, 20254 Mar 2025Accessed Nov 20, 202620 Nov 2026

      Supporting excerpts (2)
      • we are in the process of installing two additional camera portals to improve inspections of components such as pantographs and wheelsets.
      • We are seeing increasing evidence of the useful role that algorithms and AI models can play in enhancing image quality and recognition of parts.
    5. Source 5:

      NS Annual Report 2025

      OrganizationNS, Mar 2, 20262 Mar 2026FilingAccessed Nov 20, 202620 Nov 2026

      Supporting excerpts (6)
      • They undergo daily inspections at a service location. Once every three months, they go to a maintenance site for servicing.
      • A third of our colleagues are aged 55 or over. Some 6,000 will retire in the next 10 years alone.
      • Cameras along the tracks provide us with additional information about the condition of our trains.
      • Reduce demand for labour, e.g. by using camera poles to carry out the inspection of rolling stock and by deploying AI.
      • NS expects to see the effect of these solutions from 2026 onwards.
      • Total Netherlands 19,417 19,208
    6. Source 6:

      Daan Debie on how NS brings AI from pilot to practice

      Partner or vendorKickstartAI, May 27, 202627 May 2026By Rutger HuizengaAccessed Nov 20, 202620 Nov 2026

      Supporting excerpts (7)
      • Daan Debie, Director of Data, Innovation and AI at NS
      • A good example is the camera gantries that NS has recently installed along the tracks. These photograph trains passing at high speed, and an image recognition model checks whether there are defects in the wheel sets or pantographs.
      • Before this technology existed, engineers would literally walk along all the wheel sets at night with a torch
      • Those engineers suddenly have to trust an algorithm over their own visual inspection. That is quite a leap of faith.
      • And if you do not manage that well, your AI product stalls at adoption, and you have quite literally thrown money away.
      • At some point, a business unit has to take ownership, free up budget, feel responsible, be accountable.
      • involving users from the early stages of building
    7. Source 7:

      Norfolk Southern launches AI train inspection technology

      OrganizationNorfolk Southern, Oct 26, 202326 Oct 2023Accessed Nov 20, 202620 Nov 2026

      Supporting excerpts (2)
      • Norfolk Southern Corporation (NYSE: NSC) is deploying Digital Train Inspection Portals to enhance rail safety across the company's 22-state network.
      • Together, this Machine Vision Inspection technology captures ultra-high-resolution, 360-degree images of passing railcars.